丹麥哥本哈根水晶大樓
The Crystal in Copenhagen, Denmark
建筑設計:SHL建筑師事務所
業主:Nykredit銀行
面積:6 850平方米
委托設計:2006年
施工期:2008年—2010年
景觀設計:SLA景觀事務所
獲獎:
2011年,每日建筑網年度建筑大獎,辦公樓獎
2012年,瑞典“一勝百”不變形耐磨油鋼年度獎
2011年,歐洲鋼材設計獎
2011年,LEAF獎,年度最佳結構設計獎
2011年,世界建筑節,辦公樓獎
2012年,(英國)皇家建筑師協會獎
2013年,國際橋梁與結構工程協會結構獎
Architects: schmidt hammer lassen architects
Client: Nykredit
Area: 6 850 m2
On commission: 2006
Status: Construction period 2008 - 2010
Landscape architect: SLA
Awards:
2011, ArchDaily Building of the Year Award, Office Building category
2012, Arne of the Year Award, shortlisted in the Big Arne category
2011, European Steel Design Award
2011, LEAF Award, Best Structural Design of the Year
2011, World Architecture Festival, shortlisted in the Office category
2012, RIBA Award, shortlisted in the EU category
2013, IABSE Denmark’s Structure Award for the Crystal in Copenhagen
Nykredit的擴建包括新水晶大樓,位于Nykredit現有建筑的西北部。水晶大樓獨立位于此地,是透明的幾何玻璃結構,位于單點、單線上,像一個看上去很輕的水晶體漂浮于廣場之上。就形式和規模而言,水晶大樓位于城市和港口的中間,與周邊建筑相互協調。建筑的內部布局設計是為了達到最佳的功能、靈活性和高效率。典型的展館平面繞左右兩個前庭布置成Z字形,確保所有工作間光線充足,可以觀賞景觀。平面的配置允許容納開放式的平面、獨立的辦公室或會議室。該建筑主要由一個置于立面內的菱形結構系統支撐。
建筑的多面玻璃立面反射日光,映照周圍的環境。雙層玻璃相當于一個合二為一的日光屏,以便建筑適應不斷變化的日光條件。
廣場設有一個大型水池,映照太陽和天空中漂浮的云彩。
The extension to Nykredit consists of a new building – the Crystal – sited north-west of the existing Nykredit premises. Freestanding on the site, it reads as a transparent, geometrical, glazed form which, resting only on a single point and a single line, floats as a visually light, crystalline structure above the plaza.
In terms of both form and scale, the building is intermediate between the city and the harbour, and harmonises with neighbouring buildings. The interior layout of the building has been designed for optimum functionality, flexibility and efficiency. The typical floor plan is disposed in a Z-shape around two atria, which ensures that all workstations are well lit and enjoy a view. The disposition of the plan al-lows the accommodation of open plan, separate offices or meeting rooms. The building is primarily supported by a rhombic construction system placed immedi-ately inside the fa?ade.
The building’s multi-faceted glass fa?ade reflects both daylight and the immediate surroundings, but the double-glazing also features an integrated sun screen that allows the building to adapt to changing light conditions.
The piazza features a large water pool which reflects the sun and the clouds moving across the sky.














