Strengthening long-term embankments maintained on permafrost soils

2017-06-29 02:13:49EvgenyAshpizTatyanaVavrinyuk
Sciences in Cold and Arid Regions 2017年3期

Evgeny S. Ashpiz, Tatyana S. Vavrinyuk

1. Moscow State University of Railway Engineering of Emperor Nicholas II, 9 Building, 9 Obraztsova St., Moscow 127994, Russia

2. The group of companies "MIAKOM", 7 Building, 4 Professor Popov St., St. Petersburg 197022, Russia

Strengthening long-term embankments maintained on permafrost soils

Evgeny S. Ashpiz1, Tatyana S. Vavrinyuk2*

1. Moscow State University of Railway Engineering of Emperor Nicholas II, 9 Building, 9 Obraztsova St., Moscow 127994, Russia

2. The group of companies "MIAKOM", 7 Building, 4 Professor Popov St., St. Petersburg 197022, Russia

An analysis of the reasons for the displacements of long-term embankments maintained on permafrost soils indicates that they mainly occur due to plastic deformations in the layer of seasonal freezing and thawing; therefore, the reconstruction of permafrost is not effective in this case. It is proposed to strengthen these embankments with the help of using jet technology for cementation of the top layer of the roadbed. This approach is considered through the example of the deforming embankment on 6,278 km of the Turinskaya-Karymskaya section of the Trans-Siberian Railway.

embankment; permafrost roadbeds; temperature forecast; stress-strain state; jet technology

1 Introduction

The maintenance of railways built on permafrost soils detects numerous deformations of the subgrade, con-nected with the degradation of the permafrost. The main deformation in these terms is considered to be the long-term displacement of embankments. There are cases on the Trans-Siberian Railway where deformations have been recorded since its construction, up to the present—in other words, for over 100 years.

The main reason for these deformations is the warming impact of the subgrade structure on the permafrost soil of the embankment, which weakens while thawing and is unable to bear the load of traffic.

A situation like this makes it necessary to constantly fill and line the tracks, leading to numerous restrictions of train speed and, finally, increasing considerably the operating costs. The situation is especially complicated on the Trans-Siberian Railway where the train traffic is quite intensive (density of freight traffic is more than 100 million t/km of gross load per km), including the traffic of freight trains. One of these facilities is an embankment 4.0 m high and 6,278 km long on the Turinskaya-Karymskaya line of the Trans-Siberian Railway. At present, longstanding displacement of the embankment, with the depression of a track and heaves, is taking place on this facility. Because of the subgrade deformations, long-term restrictions of train speed are applied to this section, reducing carrying capacity and leading to significant losses in operation.

Therefore, it is important to work out proposals for strengthening the embankment and its roadbed to prevent deformations.

2 Description of a subgrade facility

The facility affected is a section of the subgrade on the Trans-Siberian Railway with a length of 6,278km on the Turinskaya-Karymskaya line. On this section, the displacement and degradation of the embankment with the depression of the track and heaves have been recorded for a long time. The road category is I, a double-track line, electrified. The carrying traffic on this section is 62 train-pairs per day; the train speed is 90/80 km/h. The height of the embankment is up to 4.0 m; the angle of the slopes is from 1:1.5 to 1:2.0. The embankment consists of different grain-size sand and gravel-pebble soils. According to track maintenance records, the depression of the track is at 27 cm per year, with a daily maximum of 18 mm.

In the upper part of the roadbed under the embankment, there is silty, water-bearing sand in the thawing state with the strength characteristicsc= 1 kPa andφ= 24°. Relying on the thixotropic properties of the roadbed soil, we used the calculated value of the angle of inner friction asφp= 15°. The permafrost under the embankment is located at the depth of 6.5 m to 8.0 m. Permafrost soils are in a plastic frozen state with the temperature above 1.0 °C; and according to the ice state, they belong to the icy soil with a relative depression under thawingδ= 0.3. Soils of the active layer of the roadbed are characterized as heavy, heaving soils.

3 Statement of the problem and method of solving it

To stabilize the embankment on this section with the length of 6,278 km, it is necessary to determine the causes of deformations and to identify ways to eliminate them. To achieve this, a simulation of the thermal regime in the embankment roadbed was performed, and calculations of the stress-strain state were done.

The forecast for the dynamics of the freezing and thawing border in the roadbed and on the railway was carried out by mathematical modelling in the computer program "WARM" (Khrustalev and Emelyanova, 1994), developed at the Department of Geocryology of Moscow State University. Data from the meteorological station in Chita were taken as the boundary conditions. The embankment was simulated with the height of 2.0 m, the width of the main field was 10.6 m, the angle of the slope was 1:2, and frozen sandy loam with the thickness of 3.2 m was placed on the roadbed at the depth of 4.0 m. The temperature of the frozen soil was set at ?0.8 °C.

Simulating the stress-strain state (SSS) of the subgrade was carried out with the method of finite elements in the program PLAХIS (Brinkgreve, 2002), using the model Mohr-Coulomb for the soil. The finite-element mesh was plotted with the use of 15-nodal triangular elements, after a geometric model and input parameters of the material were created.

The value of the embankment displacement under the train and the safety factor of the subgrade were determined in the course of the calculation with the formula:

wherecandφare input parameters of strength, andis actual normal voltage. Parametersandare parameters of the given strength that is sufficient to maintain the equilibrium. The above mentioned principle is the base of the Phi-c-reduction method, which is used in the program PLAХIS for calculating the total safety factor. With such an approach, the adhesion and the tangent of the friction angle reduce in the same proportion.

On calculating with the help of the Phi-c-reduction method, some additional displacement occurs. The complete displacements do not have any physical meaning, but their growth at the final step (under the destruction) indicates the probable mechanism of the destruction. The increment value of displacements is not important. To determine the vertical deformation under the train, we did the calculations relying on the filtrational consolidation with statically applied loads of a train on the first trackp1= 60 kPa and on the second trackp2= 80 kPa.

4 Analysis of the simulation results

The results of the thermal regime simulation showed that the initial layer of frozen soil, with the thickness of 3.0 m and the top of which is at the depth of 4.0 m, will degrade. The complete degradation of permafrost takes place toward year 20, with the average rate of thawing at 0.15 m per year and 0.25 m during the early years. Taking into consideration that the depression of thawing soils isδ= 0.3, the thermal displacement is about 8 cm per year during the early years, decreasing to 4~5 cm per year in subsequent years. Thus, the value of the thermal displacement is only about one-third of the total value of displacement; and it will continue to decrease.

SSS simulation showed that the total stability factor equaledKsf= 1.26 when the trains passed on the two tracks; the maximum vertical deformations equaled Δ = 8.13 mm, and the deformation occurred closer to the sloping part of the embankment and at the top of the roadbed (Figure 1).

The vertical elastic displacement obtained under the train load exceeds the norm by more than four times; it should not be more than 2 mm according tothe regulation (SP 238.1326000.2015). The results of the simulation show that at the top of the roadbed there exists some overstressing, which is transformed into the plastic deformations causing the displacements of the embankment. That is why it is necessary to strengthen the upper part of the roadbed in order to stabilize the embankment.

5 Proposals for the embankment stabilization

Strengthening the roadbed with cementation by jet technology is proposed as a method of embankment stabilization. The strengthened layer of soil in the roadbed presents a continuous plate strengthened with cement. To select the characteristics of the soil layer strengthened with cement, SSS simulation of the subgrade with the use of the finite-element method in the program PLAХIS was carried out. A series of calculations was done with the increased train load 90 kPa on both tracks. The thickness of the strengthened layer of the roadbed varied: 0, 1, 3, or 5 m. The characteristics of the soil of the strengthened roadbed taken in the calculation are the following:E= 100 MPa,c= 50 kPa,φ= 30°, andυ= 0.25. The results of the calculations turned out to be optimal for strengthening with the thickness of 3 m, in which the following was obtained: a stability factorKsf= 1.92, and the vertical deformation reduced to Δ = 0.28 mm. The deformed mesh of the simulation for this case is shown in Figure 2.

Figure 1 The mesh deflection in SSS simulation under the train load (magnification power of 50)

Figure 2 The deformed mesh of the simulation under strengthening with the thickness of 3 m (magnification power of 30)

As the calculation results show, with the thickness of 3 m of the strengthened roadbed soil by cementation, the stability of the embankment is achieved; and the elastic displacement turns out to be lower than the regulatory value of 2 mm.

With a strengthened layer 5 m thick, the displacement increases due to the raise in the plate weight—the plate vertically dives in the weak soil under its own weight; and the thickness of 1 m is not sufficient to strengthen the soil.

6 Practical application of the results

In 2013~2014, the project was worked out on thebasis the scientific recommendations of MSURE (Moscow State University of Railway Engineering) (Ashpiz, 2012) and the strengthening of the embankment roadbed was made on a 6,278-kilometer section of the Turinskay-Karymskaya line of the Trans-Siberian Railway with the use of jet technology. According to the project worked out by JSC Triada-Нolding, soicement elements (SCE) create the strengthening layer and are arranged in transverse tilting rows of four elements on each side of the embankment at a pitch of 1,600 mm in the lengthwise direction and the shift of axle drilling from the opposite sides at 800 mm (Figure 3).

Observation of the results of the section after the strengthening was carried out by the engineering-geological base of the Trans-Siberian Railway. The observations in 2015 and 2016 showed that the implemented solution was effective for embankment stabilization, and the deformation of the embankment was actually coming to an end.

Figure 3 Diagram of creating the strengthening layer

7 Conclusions

(1) The causes for the deformation of embankments maintained long-term on permafrost soils are to a lesser degree the thermal displacement caused by the degradation of permafrost; but in most cases, the plastic deformations in the layer of seasonal freezing and thawing are under the embankment.

(2) The simulation of the thermal regime of the embankment roadbed was applied to the chosen deformed facility of the subgrade on a 6,278-kilometer section of the Turinskaya-Karymskaya line of the Trans-Siberian Railway; and calculations of the stress-strain state were done, which showed that along with the degradation of permafrost and the thermal displacement, plastic deformations of the upper part of the roadbed under the embankment take place, which are the main cause of the displacement.

(3) A design solution was proposed to strengthen the top soil layer of the roadbed, using jet technology of cementation to stabilize the embankment. Characteristics of the strengthening layer were selected based on SSS simulation, with the use of the finite-element method; and the layer thickness was 3 m when the module of deformation wasE= 100 MPa.

(4) Implementation of the strengthening was carried out in 2013–2014; and the results of observations made by the engineering-geological base of the Trans-Siberian Railway in 2015 and 2016 showed the efficiency of the proposed solution to stabilize the embankment.

Ashpiz ES, 2012. Scientific support of design works on the facility: Reconstruction of subgrade on a 6278-kilometre section of the Turinskaya-Karymskaya line of the Trans-Siberian Railway: Research report (encl.), MIIT, Moscow.

Brinkgreve RBJ, 2002. Plaxis 2D, Scientific Manual. V. 8, GeoDelft, Netherlands.

Khrustalev LN, Emelyanova LV, 1994. "WARM", the program of calculation of thermal interaction of engineering structures with permafrost soils, certificate No. 940281 RosAPO.

SP 238.1326000.2015 Railroad, approved by the order of Mintrans of Russia No. 209 of July 6, 2015.

:Ashpiz ES, Vavrinyuk TS, 2017. Strengthening long-term embankments maintained on permafrost soils. Sciences in Cold and Arid Regions, 9(3): 0317–0320.

10.3724/SP.J.1226.2017.00317.

December 22, 2016 Accepted: January 22, 2017

*Correspondence to: Tatyana S. Vavrinyuk, The group of companies "MIAKOM", 7 Building, 4 Professor Popov St., St. Petersburg 197022, Russia. E-mail: tanyaox@list.ru

主站蜘蛛池模板: 97se亚洲综合在线天天| 综1合AV在线播放| 日韩小视频在线观看| 亚洲无码不卡网| 少妇人妻无码首页| 蜜芽国产尤物av尤物在线看| 成年av福利永久免费观看| 欧美精品另类| 亚洲第一成年免费网站| 久久综合色视频| 无码中文字幕乱码免费2| 五月天久久综合| 日本中文字幕久久网站| 伊人精品视频免费在线| 国产丰满大乳无码免费播放 | 成人亚洲视频| 国产精品原创不卡在线| 精品国产一二三区| 一区二区欧美日韩高清免费| 久久精品人人做人人爽电影蜜月| 色综合天天操| 久久一本精品久久久ー99| 国产精品所毛片视频| 成人免费视频一区二区三区| 免费无码在线观看| 制服丝袜在线视频香蕉| 国产成人久久777777| 欧美日一级片| 视频二区国产精品职场同事| 国产嫩草在线观看| 国产精品极品美女自在线网站| 日韩不卡高清视频| 美女毛片在线| 毛片基地视频| 国产毛片高清一级国语| 九色在线视频导航91| 久久久久中文字幕精品视频| 中文字幕欧美日韩| 欧美亚洲一二三区| 午夜精品影院| 亚洲成人动漫在线| 亚洲精品国偷自产在线91正片| 久久国产精品夜色| 亚洲人成网站观看在线观看| 成人国产精品一级毛片天堂| 精品无码人妻一区二区| 中国特黄美女一级视频| 国产欧美日韩精品第二区| 妇女自拍偷自拍亚洲精品| 国产福利观看| 欧美A级V片在线观看| 粗大猛烈进出高潮视频无码| 国产福利2021最新在线观看| 成人福利在线看| 中文字幕在线播放不卡| 男女猛烈无遮挡午夜视频| 青青极品在线| 黄色免费在线网址| 伊人久久大香线蕉成人综合网| 欧美日韩国产高清一区二区三区| 亚瑟天堂久久一区二区影院| 无码电影在线观看| 亚洲国产日韩一区| 人人91人人澡人人妻人人爽 | 日韩黄色大片免费看| 免费亚洲成人| 日本国产精品| 亚洲中文无码h在线观看| 在线免费观看AV| 亚洲一区二区三区中文字幕5566| 青青青视频免费一区二区| 一级香蕉视频在线观看| 999福利激情视频| 国产精品漂亮美女在线观看| 熟妇丰满人妻| 中文字幕av无码不卡免费| 亚洲天堂成人在线观看| 国产成人精品午夜视频'| 久久夜色精品国产嚕嚕亚洲av| 国产成人亚洲精品蜜芽影院| 99精品热视频这里只有精品7| 伦伦影院精品一区|