Kegong Fn,Honggung Ling,Chishui M,Chunwei Zng
aState Key Laboratory of Mine Disaster Prevention and Control,Shandong University of Science and Technology,Qingdao 266590,China
bLiyan Mining Company of Shandong Lineng Group,Jining 273517,China
Non-harmonious deformation controlling of gob-side entry in thin coal seam under dynamic pressure
Kegong Fana,*,Hongguang Liangb,Chishuai Maa,Chuanwei Zanga
aState Key Laboratory of Mine Disaster Prevention and Control,Shandong University of Science and Technology,Qingdao 266590,China
bLiyan Mining Company of Shandong Lineng Group,Jining 273517,China
A R T I C L E I N F O
Article history:
Received 7 March 2014
Received in revised form
24 March 2014
Accepted 28 April 2014
Available online 14 May 2014
Gob-side entry under dynamic pressure
The behavior of gob-side entry under dynamic pressure is totally different from the one driven after the movement of overlying strata above the adjacent coalface goaf.The gob-side entry will experience severe roof lateral structural adjustments caused by adjacent coalface mining.Thus the deformation and failure characteristics of narrow coal pillar along the gob should be carefully considered.On the basis of the data of the gob-side entry obtained in a thin coal seam under dynamic pressure,the measures to reinforce the narrow coal pillar are put forward.In addition,the non-harmonious controlling of the rock structures and non-equilibrium gob-side entry deformation is proposed to avoid potential failure.Field practices show that the supporting problems of the gob-side entry under dynamic pressure can be well addressed, which could be used in other similar mining cases.
?2014 Institute of Rock and Soil Mechanics,Chinese Academy of Sciences.Production and hosting by Elsevier B.V.All rights reserved.
The commonly observed gob-side entry is often driven after the movement of the overlying strata above the adjacent coalface goaf, where stress redistribution tends to be stable with elapsed time. The gob-side entry is basically located in the lateral stressreduction area,which is affected by adjacent coalface mining. Thus it can avoid potential high-stress induced damages to surrounding rocks.At present,the control technologies for surrounding rocks are pretty mature(Fan and Zhai,2004;Bai,2006;Liu and Meng,2009;Hua et al.,2011).In recent years,however,replacement of mining and tunneling is dif f i cult for the increasing mining intensity.In order to avoid forming isolated coalfaces because of skip-mining,the gob-side entry has been driven while the adjacent coalface is moving in the opposite direction at the same time (Zhang et al.,2004;Liu et al.,2010;Wang et al.,2012;Zhao et al., 2012).The stability of gob-side entry excavated during adjacent coalface mining will be affected by the strong dynamic pressure induced by mining activities.The adjustment of lateral roof structure caused by adjacent coalface mining will de f i nitely deteriorate the stress environments and then the narrow coal pillar along the gob deforms,even fails(Golshani et al.,2007;Trifu et al.,2007). This leads to obvious non-equilibrium deformation and failure between the coal pillar and the gob-side entry,and then implement of supporting becomes more dif f i cult(Hernández Gómez and Ruiz, 1993).Traditional supporting methods have their limits to meet the requirements of deformation control of surrounding rocks.According to the non-harmonious characteristics of rock mass structure and non-equilibrium deformation and failure in gob-side entry under dynamic pressure,the bene f i cial exploration is carried out in terms of the non-harmonious controlling of surrounding rocks deformation.It is of great signi f i cance for harmonizing the interaction between mining and tunneling.
A case in Xuzhuang coal mine was taken to illustrate the feasibility of proposed controlling measures in this context.The primary coal seam of the f i rst mining district is located in the second level, which belongs to the 12th coal bed of Upper Carboniferous Taiyuan Formation.The coal seam dip is 2°-8°and thickness of 1.1-1.37 m. There are 0-3 layers with the thickness of 0.20-0.33 m within the coal seam.The immediate roof is mainly made up of sandy mudstone,mudstone and in part of siltstone.The main roof is composed of sandy mudstone with the uniaxial compressive strength(UCS)of 59.0 MPa.The f l oor is made up of limestone with an average thickness of about 2.75 m and an average UCS of145.6 MPa.The interlayer f l oor between the coal seam and the f l oor (limestone)is mudstone with an average thickness of 0.2 m.
In the presence of coal seam,the main coalface is arranged in the west of the mine.Headentry of the coalface must be driven along goaf during adjacent coalface mining in order to ensure the normal operation of main coalfaces.For instance,headentry 04 lies on the east of the tail entry 02.Its cross-sectional dimension is 3.8 m×2.6 m(width×height),which is driven along the f l oor by breaking the coal seam and part of roof.The narrow coal pillar(5 m wide)is left between the headentry and the adjacent tail entry. Headentry 04 has been already completed before coalface 02 mining.The combined support scheme with bolts,steel meshes and anchor cables is adopted for headentry 04.The roof bolts adopt thread steel with size ofφ20 mm×2000 mm and spacing of 900 mm×900 mm.Also,steel meshes with 6.5 mm in diameter are adopted.The prestressed anchor cables ofφ15.24 mm×5000 mm with high strength and low relaxation are considered,and the“2-1-2”layout is used along the roadway with row spacing of 2700 mm. Fiber reinforced polymer(FRP)anchor bolts ofφ20 mm×1800 mm and plastic meshes are adopted at sidewalls with spacing of 700 mm×900 mm(Fig.1).As a typical gob-side entry under dynamic pressure,headentry 04 has experienced the dynamic pressure from mining coalfaces 02 and 04 and supporting becomes very dif f i cult subsequently.
Considering that the original support scheme of headentry 04 cannot resist the dynamic pressure induced by adjacent coalface mining,the roadway supplementary support scheme should be used.In the supplementary support scheme,we consider high strength bolts ofφ18 mm×1800 mm for coal pillar side,and the nest anchor cables ofφ15.24 mm×5000 mm for the roof near the small pillar.Two different supporting structures are adopted for headentry 04.Anchor bolts and steel ladders are employed in Scheme I with the spacing of 900 mm×900 mm,and in Scheme II only anchor bolts are used with spacing of 900 mm×1800 mm. During the initial period of coalface 02 mining,Scheme II is used for the inner gob-side entry close to the cut side,where the surrounding rocks show signi f i cant plastic deformation after adjacent coalface mining.Scheme I is adopted for the outer gob-side entry in later mining.Through f i eld investigation,the deformation and failure characteristics of surrounding rocks in the gob-side entry in thin coal seam under dynamic pressure can be well understood, providing a basis on supporting scheme selection for other gob-side entries under dynamic pressure.
The cross-section of headentry 06 is 3.8 m×2.6 m (width×height).It will be driven along the f l oor by breaking the 12th coal seam and part of roof,and thus a narrow coal pillar(5 m wide)will be left.Headentry 06 is affected by coalface 04 mining when driven and by coalface 06 mining when used,and a typical roadway in f l uenced by dynamic pressure.It can be noted that the deformation and failure characteristics of surrounding rocks in the gob-side entry under dynamic pressure should be considered in supporting scheme.
The gob-side entry under dynamic pressure roughly experiences three stages,i.e.roadway excavation,adjacent coalface mining,and mining of target coalface.Based on f i eld monitoring of ground pressure in the reinforced area of headentry 04 where Scheme II was employed,the deformation and failure characteristics of surrounding rocks in the gob-side entry under dynamic pressure are listed as follows:
(1)The front abutment pressure caused by adjacent coalface mining has a minor in f l uence on the gob-side entry under dynamic pressure.In a certain area in vicinity of roadway affected by the front abutment pressure,the maximum convergence between the roof and f l oor is up to approximately 21 mm,and that ofsidewalls is about 118 mm,suggesting the effectiveness of the adopted support scheme(in Fig.2).

Fig.1.Support pro f i le of headentry 04.
(2)The surrounding rocks in the gob-side entry under dynamic pressure show signi f i cant plastic deformation after mining adjacent coalface.In this circumstance,slip surfaces between narrow coal pillar and roof strata are easy to occur.Sidewalls slippage in some areas with a value of 500-800 mm.In Fig.3, we can observe the coal-rock interface characterized by obvious slipping traces.However,the lateral deformation of the solid coal is smaller(basically less than 150 mm)and sidewall slippage is reported in very few areas,showing evident nonequilibrium deformation and failure of surrounding rocks.
(3)The dynamic pressure caused by adjacent coalface mining has a long-term effect on mining stability.The strong deformation of surrounding rocks in gob-side entry under the dynamic pressure(the sidewalls convergence speed of more than 10 mm/d is deemed as strong active stage)lasts for about one month within scope of 90 m after the coalface mining,which is within 90 m around dynamic pressure.The general deformation(the sidewalls convergence speed of less than 2-10 mm/d is considered as active stage)lasts for about three months within scope of 250-270 m after coalface mining.
(4)Many phenomena ofserious deformation and/or failure occurred in the coal pillar:(i)FRP anchor bolts were pulled out and anchor plates were broken.(ii)The double anti-pulling mesh was cut by the high strength anchor plates.The anchor bolts and anchor plates sometimes penetrated into the reinforced body.In contrast,the FRP anchor plates were crushed or fell off only in local areas for the solid coal sidewall.
(5)The roof convergence of the gob-side entry was smaller under dynamic pressure.In this regard,mesh bag and mesh breakage were observed in some local broken roof.

Fig.2.Situations of headentry 04 affected by the front abutment pressure.

Fig.3.Horizontal movement of narrow coal pillar in headentry 04 and its effects.
The deformation and failure characteristics of the gob-side entry under dynamic pressure show that the FRP bolts cannot provide large pre-load and/or clamping force and thus enough anchoring force,suggesting their poor capacity against dynamic pressure. Some accidents veri f i ed the tensile failure of FRP bolts,crushing failure and slippage of FRP anchor plates.In the later period,we adopted Scheme I to reinforce the outer headentry 04 in order to effectively control the deformation of the coal pillar.
The above-mentioned analysis indicates that the deformation and failure of gob-side entry under dynamic pressure are inducedmainly by mining adjacent coalface.In the initial period of roadway excavation,one side of the gob-side entry is the solid coal and the other side is the narrow coal pillar and untapped solid coal.The narrow coal pillar is basically believed to be almost intact and its bearing capacity is not reduced when the gob-side entry is located at the front of adjacent coalface.The front abutment pressure caused by adjacent coalface mining has a great in f l uence on the gob-side entry at the front of coalface,and strata behaviors are comparatively weaker.With the adjacent coalface advancing,the arc-triangle block structure is formed after periodic weighting of the main roof behind adjacent working face(Zhu,1987;Hou and Li, 2001;Zhang et al.,2004;Bai,2006).Arc-triangle block B,adjacent caving block C,and rock A above the coalface without caving are articulated together,as shown in Fig.4.The formation of arctriangle block is a dynamic process affected by strong dynamic pressure caused by the rotation and subsidence of the structure,the roof of the gob-side entry below the key block B will experience adaptive subsidence under dynamic pressure,along with overall inward movement of sidewalls.After this structural adjustment, the surrounding rocks of gob-side entry deform seriously and become unstable.
The behavior of gob-side entry under dynamic pressure is totally different from the one driven after the movement of overlying strata above the adjacent coalface goaf.The gob-side entry will experience severe roof lateral structural adjustments caused by adjacent coalface mining.Under the lateral abutment pressure caused by adjacent coalface mining,the narrow coal pillar in vicinity of adjacent coalface is damaged f i rstly due to intense stress concentration,fractures,and rotating subsidence of arc-triangle block.The stress distribution,bearing capacity and deformation of the coal pillar are also signi f i cantly different from those of solid coal in gob-side entry under dynamic pressure.Affected by the deformation and failure of narrow coal pillar,other parts of roadway surrounding rocks may cause roadway instability for the action of stress redistribution.It can be seen that the lateral fracturing and rotating subsidence of main roof of the adjacent coalface are the major reasons for the large deformation of surrounding rocks in the gob-side entry under dynamic pressure.The narrow coal pillar plays an important role in controlling roadway deformation and maintaining roadway stability,and its deformation and failure will directly affect the roadway stability.Therefore,the narrow coal pillar is the key,also a dif f i culty,for supporting.

Fig.4.Arc-triangle block of gob-side entry under dynamic pressure(Zhu,1987;Hou and Li,2001;Zhang et al.,2004;Bai,2006).
5.1.Support method
The site-speci f i c conditions of headentry 06 are described as follows:

Fig.5.Support cross-sectional drawing of headentry 06.
(1)Headentry 06 is driven along the f l oor by breaking the coal seam and part of main roof,and the thickness of coal seam is about half of the roadway height.
(2)A narrow coal pillar(5 m wide)is left for gob-side entry driven along tail entry 04.
(3)The roadway is in f l uenced by coalface 04 mining.
(4)Unbalanced stress in rock mass,bearing capacity variation and non-equilibrium deformation and/or failure of gob-side entry under dynamic pressure are existing.
According to the above-mentioned descriptions,the combined support scheme with high strength prestressed anchor bolt,prestressed anchor cable and steel mesh is adopted,which is based on the non-harmonious control concept,support principles,and the bearing capacity of surrounding rocks.The narrow coal pillar is reinforced in order to control the deformation of gob-side entry under dynamic pressures.Field monitoring results show that the deformation of roadway matches well with that of asymmetric supporting structure.

Fig.6.Typical surface displacement of gob-side entry under dynamic pressure induced by adjacent coalface mining.
5.2.Support scheme
Headentry 06 has the cross-sectional dimension of 3.8 m×2.6 m(width×length).Anchor bolts are arranged at the narrow coal pillar and the solid coal,asymmetrically,as shown in Fig.5.Support parameters are listed as follows:
(1)The high strength bolts ofφ20 mm×2000 mm are adopted for the roof,with spacing of 900 mm×900 mm.The cold hard drawn steel wire for welded mesh is adopted with diameter of 4.5 mm,and grid size of 100 mm×100 mm,and dimension of 2000 mm×1000 mm.The prestressed anchor cables with high strength and low relaxation are employed with dimension of φ15.24 mm×5000 mm.The layout of“2-1-2”pattern with row spacing of 1800 mm along the roadway is utilized to improve supporting effect.
(2)Non-harmonious bolting with metal mesh is adopted at sidewalls.Bolts ofφ20 mm×2000 mm are adopted at the coal pillar with spacing of 700 mm×900 mm.FRP bolts of φ20 mm×1800 mm are adopted at the solid coal side with spacing of 900 mm×900 mm.The metal meshes,4.5 mm in diameter,dimension of 2500 mm×1000 mm and grid size of 100 mm×100 mm,are adopted at sidewalls.
5.3.Result analysis
Field observation shows that the surface displacement is small under dynamic pressure induced by adjacent coalface mining.After excavation,the maximum cumulative horizontal displacement of sidewalls is 280-370 mm,signi fi cantly reduced when compared to that of headentry 02.Cumulative convergence between roof and fl oor is 76-130 mm.It is noted that the overall outward movement of sidewalls makes the horizontal deformation become larger, while the convergence between roof and fl oor is relatively smaller. Observation shows that the convergence of coal pillar accounts for about 70%of the sidewall movement.The surface displacement of roadway tends to be stable after excavation of 70-90 m from monitoring station.The typical surface displacement of roadway is shown in Fig.6.
(1)Under dynamic pressure,the bearing capacities of the coal pillar and the solid coal are totally different,especially when the gobside entry is in vicinity of the adjacent coalface.Accordingly,the asymmetric characteristics of surrounding rocks should be considered.
(2)Affected by adjacent coalface mining,slipping surfaces between narrow coal pillar and roof strata can be formed,leading to the overall outward movement and larger deformation,even if the overall outward movement of solid coal is smaller.Nonequilibrium deformation and failure of the gob-side entry appear.
(3)Support measures play an important role in controlling the stability of gob-side entry under dynamic pressure.According to the non-equilibrium deformation and failure of surrounding rocks,it is advised to adopt non-harmonious supports to reinforce the narrow coal pillar.Hence the deformation of the surrounding rocks of gob-side entry under dynamic pressure can be effectively controlled.
The authors wish to con f i rm that there are no known con f l icts of interest associated with this publication and there has been no signi f i cant f i nancial support for this work that could have in f l uenced its outcome.
This paper is supported by the National Natural Science Foundation of China(Grant No.51104093).
Bai JB.Surrounding rock control of gob-side entry driving.Xuzhou:China University of Mining and Technology Press;2006(in Chinese).
Fan KG,Zhai DY.Analysis of deformation failure and non-harmonious control mechanism of surrounding rocks of roadways with weak structures.Beijing: China Coal Industry Publishing House;2004(in Chinese).
Golshani A,Oda M,Okui Y,Takemura T,Munkhtogoo E.Numerical simulation of the excavation damaged zone around an opening in brittle rock.International Journal of Rock Mechanics and Mining Sciences 2007;66(4):835-45.
Hernández Gómez LH,Ruiz C.Experimental evaluation of crack propagation velocity in PMMA under dynamic pressure loading.International Journal of Fracture 1993;61(2):R21-8.
Hou CJ,Li XH.Stability principle of big and small structures of rock surrounding roadway driven along goaf in fully mechanized top coal caving face.Journal of China Coal Society 2001;26(1):1-7(in Chinese).
Hua XZ,Liu S,Liu ZH,Zha WH,Li YF.Research on strata pressure characteristic of gob-side entry driving in island mining face and its engineering application. Chinese Journal of Rock Mechanics and Engineering 2011;30(8):1646-51(in Chinese).
Liu JH,Zhao ZH,Mou GL.Research on support technology for roadway under strong dynamic pressure while mining in fully mechanized caving face and its application.Mining and Metallurgical Engineering 2010;30(2):14-7(in Chinese).
Liu QT,Meng FW.Support technology of narrow coal pillar goaf-side gateway for fully mechanized top coal caving mining face in deep mine.Coal Science and Technology 2009;37(7):28-30(in Chinese).
Trifu CI,Shumlia V,Chen D.Investigation of rock mass stability through the analysis of failure components of microseismicity at Darlot gold mine,Austria.In: Challenges in Deep and High Stress Mining.Perth,Australia:Australian Centre for Geomechanics;2007.
Wang M,Bai JB,Wang XY,Xu Y,Guo YH,Cao JL.The surrounding rock deformation rule and control technique of the roadway driven along goaf and heading for adjacent advancing coal face.Journal of Mining and Safety Engineering 2012;29(2):194-202(in Chinese).
Zhang N,Li XH,Gao MS.Pretensioned support of roadway driven along next gob and heading adjacent advancing coal face and its application.Chinese Journal of Rock Mechanics and Engineering 2004;23(12):2100-5(in Chinese).
Zhao Y,Wang J,Gao MS,Liu BT.Research and application of gateway driving along goaf forward to adjacent mining coal mining face in Chensilou mine.Coal Engineering 2012;6:41-3(in Chinese).
Zhu DR.Fracture character of main roof in longwall face and its application.PhD Thesis.Xuzhou:China University of Mining and Technology;1987(in Chinese).

Dr.Kegong Fan,is a professor in Shandong University of Science and Technology,and his main research interest covers ground pressure and strata control,roadway support.To date,as a principal investigator,Dr.Fan has participated in over 60 projects.He was awarded the Second State-level Prize of“Achievements in Education”, and provincial-and ministerial-level Science and Technology Progress Awards.Dr.Fan is the author ofThe Failure and Instability Analysis and Non-harmonious Control Mechanism of Weak Structure of Surrounding Rocks in Roadways, and the co-author of 6 books.He has published more than 50 academic papers.At present,he is the committee member of China Coal Society for Coal Mining Specialized Committee.
*Corresponding author.Tel.:+86 13589290397.
E-mail address:fankeg@163.com(K.Fan).
Peer review under responsibility of Institute of Rock and Soil Mechanics,Chinese Academy of Sciences.
Narrow coal pillar
Non-harmonious control
Thin coal seam
Journal of Rock Mechanics and Geotechnical Engineering2014年3期