Interval Fault Tree Analysis of Excavator Variable-Frequency Speed Control System

2014-08-12 02:31:00WANGXiaoming王曉明LIAifeng李愛峰ZHANGYongming張永明MIJinhua米金華HUANGHongzhong黃洪鐘

WANG Xiao-ming (王曉明), LI Ai-feng (李愛峰), ZHANG Yong-ming (張永明), MI Jin-hua (米金華), HUANG Hong-zhong (黃洪鐘)

1 Taiyuan Heavy Industry Co., Ltd., Taiyuan 030024, China 2 School of Mechanical Electronic and Industrial Engineering, University of Electronic Science and Technology of China, Chengdu 611731, China

Interval Fault Tree Analysis of Excavator Variable-Frequency Speed Control System

WANG Xiao-ming (王曉明)1*, LI Ai-feng (李愛峰)1, ZHANG Yong-ming (張永明)1, MI Jin-hua (米金華)2, HUANG Hong-zhong (黃洪鐘)2

1TaiyuanHeavyIndustryCo.,Ltd.,Taiyuan030024,China2SchoolofMechanicalElectronicandIndustrialEngineering,UniversityofElectronicScienceandTechnologyofChina,Chengdu611731,China

In consideration of the uncertainty of basic events failure rate and lack of probability statistical information in fault tree analysis (FTA) of excavator variable-frequency speed control system, the interval theory was employed and combined with conventional FTA method. The basic events failure probabilities were described by interval numbers, and the interval operators of logical gates in FTA were deduced based on interval theory. Finally, the reliability assessment of excavator variable-frequency speed control system was done by interval FTA method. The result shows that the interval FTA method is suitable for the complex system with insufficient failure data.

faulttreeanalysis(FTA);intervaltheory;intervalprobability;excavator;electricalsytem

Introduction

The large mining excavator is produced as mining equipment for large open pit mine. After nearly five decades of development, the main bucket capacity of products is from 10 m3to 75 m3. It has turned into the main mining equipment of the million-ton large-scale open mines. As the main core control system of excavator, the reliability of electric system and its subsystem like variable-frequency speed control system, directly affect the efficiency of the whole excavator[1-2].

Fault tree analysis (FTA) method is a systematic deductive and graphical method, and widely used in reliability analysis and assessment for complex system.The uncertainty of whole system failure can be measured by probability theory; therefore, the traditional fault tree analysis method based on probability has been proved to be very useful and commonly used in system engineering as a system analysis method[3-7].

Due to lack of information and sufficient data, especially when the failure probability of a large complex system is estimated, considering the uncertainty of estimated value, the failure probability is always treated as a random variable subject to a known distribution. There are various research works on the reliability problem with uncertain input data, for instance, fuzzy fault tree analysis method based on fuzzy theory[3-4], and interval fault tree analysis method based on Dempster-Shafer (D-S) evidential theory[5-7].

In this paper, considering the uncertainty of bottom events of fault tree, the occurrence probabilities of bottom events are expressed as interval numbers. The interval theory are employed and combined with conventional FTA method to analyze the reliability of excavator variable-frequency speed control system. The remainder of this paper is organized as follows: the excavator variable-frequency speed control system is briefly introduced in Section 1. The fault tree model is constructed by conventional FTA method. Section 2 reviews the interval theory and proposes interval operator of logical gates in FTA. The detail reliability analysis of variable-frequency speed control system is also presented in this section. Section 3 concludes this paper.

1 Fault Tree Modeling of Excavator Variable-Frequency Speed Control System

1.1 Variable-frequency speed control system

The operating mechanism of large mining excavator can be divided into five parts based on its different functions,i.e., lifting mechanism, travelling mechanism, crowding mechanism, swing mechanism, and bucket open mechanism. The variable frequency and speed regulation electric system is used to control and coordinate the actions of operating mechanisms. The working principle of a kind of common used variable-frequency speed control systems is shown in Fig.1.

Fig.1 Working principle of variable-frequency speed control system of WK series large excavators

In order to regulate the speed smoothly, the direct current (DC) power with stable voltage is transferred into an alternating current (AC) power with adjustable voltage and frequency by the inverter mounted on a common DC bus. Lifting mechanism is driven by two rigidly-connected motors with consistent speed, and driven by two inverters respectively. A master-slave torque controlling method is applied to realizing the output equilibrium of two lifting motors. The crowding mechanism is driven by a single AC variable-frequency motor which is controlled by an inverter cabinet, and swing mechanism has two geared variable-frequency motors driven by one inverter. Especially, the two motors of travelling mechanism are also driven by two independent inverters which are shared with lifting mechanism, and working patterns switch between lifting and travelling are performed by an AC contactor in switching cabinet, which is clearly shown in Fig.1.

1.2 Fault tree construction

On the basis of previous work in the failure mode and effects analysis (FMEA) results of the entire electrical system, the “operating mechanism variable-frequency speed control system failure” is chosen as the top event. According to the rules of building fault trees, the failure models of whole system are composed of those four mainly failures, including motors damage, inverters failure, encoder doesn’t work and brake. Then taking the components and parts failure models as the bottom events, the fault tree of variable-frequency speed control system is built and shown in Fig.2.

Fig.2 The fault tree of variable-frequency speed control system

The meanings of the notations in Fig.2 are as follows:T: operating mechanism variable-frequency speed control system failure;G1: lifting mechanism failure;G2: travelling mechanism failure;G3: crowding mechanism failure;G4: swing mechanism failure;X1: front lifting inverter 1 failure;X2: front lifting motorM11failure;X3: encoder 1 of front lifting motor failure;X4: lifting brake;X5: back lifting inverter 2 failure;X6: back lifting motorM12failure;X7: encoder 2 of back lifting motor failure;X8: switch cabinet failure;X9: left travelling motorM21failure;X10: encoder 3 of left travelling motor failure;X11: travelling brake;X12: right travelling motorM22failure;X13: encoder 4 of right travelling motor failure;X14: crowd inverter 3 failure;X15: crowding motorM3failure;X16: encoder 5 of crowding motor failure;X17: swing inverter failure;X18: front-left swing motorM41failure;X19: encoder 6 of swing motor failure;X20: front-right swing motorM42failure;X21: back swing motor failureM43failure;X22: swing reactor failure;X23: bucket opening motor failure. In the following parts, usexi(i=1, 2, …, 23) to represent the random variables of eventsXi.

Because of the insufficient of data, the precise probabilities of bottom events cannot be obtained, so the conventional quantitative analysis method is out of use. In this paper, by looking up the handbook of mechanical design [8], as well as integrating the knowledge of various relevant experts, the failure probabilities of bottom events are determined by using the following method. Iftis set to 200 h and taking 10 percent of the deviation of the expected value as the upper and lower bounds, the interval failure probabilities of bottom events are tabulated in Table 1.

Table 1 Bottom events and interval failure probability

Note: Prob. means probability

2 Reliability Analysis of Excavator Variable-Frequency Speed Control System

2.1 The structure function of fault tree

Assume that the system and its components are all binary, and the faults between various components are independent. For the fault tree of variable-frequency speed control system, it hasn=23 bottom events and the top event isT. According to the basic definition of fault tree, the state variable of top eventΦcan be expressed as a function of state variables of bottom eventsxi(i= 1, 2, …,n), that is:

(1)

2.2 FTA based on interval theory

(1) Interval operator of AND gate

(2)

(2) Interval operator of OR gate

(3)

(4)

(5)

The output probability of AND and OR gates withnbottom events can be calculated, accordingly, using the interval method to analyze the fault tree and the failure probability of top events can be calculated.

The importance of the components in system not only depends on its physical structure but its reliability. The importance of interval probability of the top event can be defined as:

(6)

where [F]iis the interval probability of basic eventxi, and [g(F)] is the interval failure probability function of the top event.

2.3 Qualitative and quantitative analyses of fault tree

In order to find the cut set of a fault tree, which is the smallest combination of basic events that directly lead to system failure, the Fussell-Vesely method and Semanderes method are the most common used methods for seeking fault tree minimal cut sets[9]. In this paper, the Semanderes method which is based on the sets operation rules, is chosen to find minimal cut sets of the fault tree of variable-frequency speed control system.

The bottom level of fault tree is given by:

G1=x1∪x2∪x3∪x4∪x5∪x6∪x7∪x8,

G2=x1∪x2∪x8∪x9∪x10∪x11∪x12∪x13,

G3=x14∪x15∪x16,

G4=x17∪x18∪x19∪x20∪x21∪x22.

And the top level is expressed as:

M4=G1∪G2∪G3∪G4∪x23=

(x1∪x2∪x3∪x4∪x5∪x6∪x7∪x8)∪

(x1∪x2∪x8∪x9∪x10∪x11∪x12∪x13)∪

(x14∪x15∪x16)∪x23∪

(x17∪x18∪x19∪x20∪x21∪x22)=

x1∪x2∪…∪x23

(7)

There are 23 product terms in Eq. (7), and we finally find 23 minimal cut sets of variable-frequency speed control system: {x1}, {x2}, …, {x23}.

The interval probability of basic event is [F]xi, according to Eq.(3) the definition of interval operator of OR gate and the qualitative analysis of fault tree, the failure probability of middle events and top event are given by:

And the minimal cut sets are independent, the failure probability of top event is:

(8)

According to the parameters listed in Table 1, the following failure probability of top event att=200 h can be obtained:

[F]T=[0.4899, 0.5633].

The fauilre rate of variable-frequency speed control system isλs=[3366, 4143]×10-6. Since the interval probability of top event cannot directly reflect in the distribution of the failure rate. The sampling simulation method is used to do random simulation on interval failure probabilities of basic events. After 1 000 times of independent sampling and simulation, the failure rate distribution of top event on fault interval is shown in Fig.3. It is obviously that the simulation result is consistent with the theoretical result.

Fig.3 The failure rate distribution on fault interval

According to Eq. (6) and the algorithm of the interval number, the probability importance of the bottom event can be computed by the proposed method, and the results are listed in Table 2.

Table 2 The probability importance factor of bottom events

Ig(11) ≥Ig(4)≥Ig(23)≥Ig(17)≥Ig(1)≥Ig(5)≥Ig(14)≥Ig(15)≥Ig(22)≥Ig(18)≥Ig(20)≥Ig(21)≥
Ig(2)≥Ig(6)≥Ig(8)≥Ig(12)≥Ig(9)≥Ig(3)≥
Ig(7)≥Ig(16)≥Ig(13)≥Ig(10)≥Ig(19).

3 Conclusions

Because of the lack of information and insufficient failure data of the basic events are available, the uncertainty is introduced in the FTA of complex system. In this paper, the interval theory is employed and combined with conventional FTA method, using interval number rather than a precise value to represent the occurrence probabilities of bottom events. The interval operators of logical gates of FTA are deduced. The interval FTA method is used to estimate the reliability of excavator variable-frequency speed system. The NSG ranking method is used to sort the interval importance of basic events, and this result is able to provide a reasonable guidance for fault diagnosis and maintenance of excavator variable-frequency speed system. The study in this paper shows that the interval FTA method is suitable for the reliability analysis of complex system with insufficient failure data.

[1] Miao G C, Liu X X. Electric Failure Types and Self-diagnosis System of WK-35 Power Shovel[J].MechanicalEngineering&Automation, 2010, 163(6): 125-127. (in Chinese)

[2] Miao G C. The Variable-Frequency Speed Control Electrical System of WK Series Large Excavator[J].OpencastMiningTechnology, 2012(4): 34-38.(in Chinese)

[3] Li Y F, Huang H Z, Liu Y,etal. A New Fault Tree Analysis Method: Fuzzy Dynamic Fault Tree Analysis[J].EksploatacjaiNiezawodnosc-MaintenanceandReliability, 2012, 14(3): 208-214.

[4] Mi J H, Li Y F, Li H Q,etal. Reliability Analysis of CNC Hydraulic System Based on Fuzzy Fault Tree[C]. 2011 International Conference on IEEE Quality, Reliability, Risk, Maintenance, and Safety Engineering, Xi’an, 2011: 208-212.

[5] Nan H, Liu Y S, Zhang F,etal. Fault Tree Analysis of Bleed Air Anti-icing Pipeline System Based on Interval Analysis Method[J].AeronaiuticalComputingTechnique, 2013, 43(3): 48-51. (in Chinese)

[6] Carreras C, Walker I D. Interval Methods for Fault-Tree Analysis in Robotics[J].IEEETransactionsonReliability, 2001, 50(1): 3-11.

[7] Zhang X F, Zhao Y, Shi H L. Fault Tree Interval Analysis Using D-S Theory[J].MechanicalScienceandTechnologyforAerospaceEngineering, 2007, 26(5): 659-661. (in Chinese)

[8] Chen D. Handbook of Mechanical Design [M]. 4th ed. Beijing: Chemical Industry Press, 2002. (in Chinese)

[9] Liu H Z, Zhang L, Wang Y Q,etal. One Advanced Calculation Method for the Least Cut Set and Least Path Set of Fault Tree[J].IndustrialSafetyandEnvironmentProtection, 2006, 32(4): 58-59. (in Chinese)

[10] Sun H L, Yao W X. Comments on Methods for Ranking Interval Number[J].JournalofSystemEngineering, 2010, 25(3): 304-312. (in Chinese)

[11] Nakahara Y, Sasaki M, Gen M. On the Linear Programming Problems with Interval Coefficients[J].InternationalJournalofComputerIndustrialEngineering, 1992, 23(1/2/3/4): 301-304.

Foundation item: National High-Tech Research and Development Program (863 Program), China (No. 2012AA062001)

1672-5220(2014)06-0763-03

Received date: 2014-08-08

* Correspondence should be addressed to WANG Xiao-ming, E-mail: 13007082113@163.com

CLC number: TD422 Document code: A


登錄APP查看全文

主站蜘蛛池模板: 91精品国产综合久久不国产大片| 无码中文字幕精品推荐| 青青青伊人色综合久久| 国产69囗曝护士吞精在线视频| 国产成人精品一区二区不卡 | 久草视频精品| 99久视频| 亚洲综合久久成人AV| 国产精品视频观看裸模| 伊人婷婷色香五月综合缴缴情| 日本道综合一本久久久88| 中文毛片无遮挡播放免费| 狠狠色综合网| 国产精品成人观看视频国产 | 国产高清在线观看| 99免费在线观看视频| 亚洲欧洲天堂色AV| 重口调教一区二区视频| 91口爆吞精国产对白第三集| 91精品伊人久久大香线蕉| 国产精品刺激对白在线| 99re这里只有国产中文精品国产精品 | 国内精自线i品一区202| 狠狠色丁香婷婷| 久久综合九色综合97婷婷| 91热爆在线| 亚洲无线国产观看| 国产欧美性爱网| 谁有在线观看日韩亚洲最新视频 | 欧美午夜网| 日韩美一区二区| 激情亚洲天堂| 2021精品国产自在现线看| 亚洲国产无码有码| 美女无遮挡免费视频网站| 992tv国产人成在线观看| 色丁丁毛片在线观看| 欧美国产日韩在线观看| 国产精品hd在线播放| 2020精品极品国产色在线观看| 白浆免费视频国产精品视频| 欧美精品v| 亚洲欧美成人网| 五月激情婷婷综合| 国产AV无码专区亚洲A∨毛片| 国产成人综合在线观看| 国产亚洲视频播放9000| 蜜桃视频一区二区| 被公侵犯人妻少妇一区二区三区 | 欧美成人一区午夜福利在线| 国产一区二区三区视频| 欧美日本在线一区二区三区| 在线视频一区二区三区不卡| 免费一看一级毛片| 伊人久久影视| av在线人妻熟妇| 亚洲精品自产拍在线观看APP| 欧美人在线一区二区三区| 亚洲最大福利视频网| 国产不卡在线看| 99在线观看精品视频| 色婷婷亚洲十月十月色天| 无码一区二区三区视频在线播放| 国产理论最新国产精品视频| 精品伊人久久久香线蕉| 天堂成人在线视频| 久爱午夜精品免费视频| 日韩无码视频播放| 青青青亚洲精品国产| 毛片大全免费观看| 在线免费看片a| 国产呦视频免费视频在线观看| 青青草原偷拍视频| 亚洲一区网站| 亚洲一级毛片免费观看| 五月激情婷婷综合| 成人福利在线视频| 欧洲亚洲一区| 九九这里只有精品视频| 青青操视频在线| 亚洲无码精彩视频在线观看| 免费中文字幕在在线不卡 |