Abstract

2017-04-14 02:25:53
東北水利水電 2017年1期

Study on tunnel measurement holing-through control technology for TBM2bid section of Dahuofangwater conveyance project

YOU Xiao-hua

Study on excavation and dewatering in slot construction of water conveyance pipeline project across the river

CHEN Liang

The overall installation new technology for large space elbow of PCCP water conveyance project

PAN Xue-song

Influence analysis of connecting form of floor slab on structure performance of hydropower plant

CHEN Peng,GAO Lian,GU Jin-cao

Study on contrast test of anti-icing schemes in front of the dam of hydropower station in severe cold area

SUI Wei,LEI Xiu-ling,MENG Ji-hui,LI Zhong-tian

Stability test study on permeable tetrahedron river closure material

YIN Yang-song,LI Deng-song,YANG Qing,DAI Guang-qing,DU Zhen-yu

Study on insulation measure in winter running for the water conveyance pipeline

GUO Feng,LU Xiao-ting

Study on the adjustment ability of the rubber dam

YANG Chun-pu

[Abstract]The paper analyzes the project design of the Yubaotai rubber dam in Liaohe River,the result shows that the dam bag need the frequent collapse because the self-regulation capacity of rubber dam is limited,which not only effect the service life of the rubber dam,but also lack of stability for the water surface elevation of the water storage.Through the research and analysis of the engineering example,the arrangement form of increasing the control gate is more reasonable,not only increases the service life of the rubber dam,but also ensures the elevation of the waterscape,which could provide the basis for the project design of the ecological landscape water storage rubber dam in the seasonal river of the North.

rubber dam;adjustment ability;waterscape;ecological landscape

Study on tunnel measurement holing-through control technology for TBM2bid section of Dahuofangwater conveyance project

YOU Xiao-hua

[Abstract]The single excavation length of TBM2 bid section exceeds 8km for the Dahuofangwater conveyance project in Liaoning Province,the control of holing-through precision is one of the difficulties in engineering construction.The paper studies in detail the implementation scheme of the holing-through error and the control measurement.The high precision holing-through of the tunnel in this bid section is realized by the effective implementation of the control measurement measures and schemes.The high-precision holing-through of water conveyance tunnel in TBM2bid section of Dahuofang water conveyance project could accumulate experience for the long and large tunnel control measurement for the future of China.

[Key words]water conveyance tunnel;TBM;measurement;holing-through control

Study on excavation and dewatering in slot construction of water conveyance pipeline project across the river

CHEN Liang

[Abstract]The key work of the success for river crossing project is the construction diversion and dewatering during construction period.The excavation scheme of excavators combine with dredges is adopted to ensure the efficiency and reduce the cost for the crossing the Liaohe river construction project.Through the theoretical calculations and the engineering experience,the way of the well-point dewatering is adopted to determine reasonably the parameters of the well-point dewatering,then the all construction in dry land is realized successfully in the 2.5 km river bed.Because of the scientific and reasonable construction scheme of the river diversion, dewatering and the excavation,the construction period is shortened by 4 months and the construction costs are saved up to3 million RMB.

[Key words]water conveyance pipeline project;across the river;dredge excavation;well-point dewatering

The overall installation new technology for large space elbow of PCCP water conveyance project

PAN Xue-song

[Abstract]The installation of the large space elbow of PCCP water conveyance pipeline is the difficulty of the pipeline installation,also is the focus of the installation.Through the series of optimization of the optimum lifting point layout in the hoisting of the space elbow,the internal force calculation of hoisting steel wire rope,the selection of hoisting steel wire rope,the force analysis of steel trusses and the fabrication and installation of the steel trusses, the traditional subsection installation is improved to the whole installation,which achieve the purpose of the ensuring the installation quality,improving the work efficiency and saving the project investment,which has the guiding function for the accessories design and installation construction of the similar project pipeline.

[Key words]large space elbow;overall installation;new technology;PCCP pipeline

Influence analysis of connecting form of floor slab on structure performance of hydropower plant

CHEN Peng,GAO Lian,GU Jin-cao

[Abstract]Taking the surface plant of some a hydropower station as an example,the three-dimensional finite element model is built to research the simulation method of floor slab,and research the deformation and self-vibration characteristics of the structure for the different connecting form between the floor slab with the upper and lower walls.In addition,the structure response under the earthquake action is calculated and analyzed.The results show that the non-linear contact method could accurately simulate the lapped connecting form between the floor slot and the wall.The lapped connecting form of the floor slot is not conducive to control the deformation of the upper structure of the plant,is also not conducive to structural vibration.But the lapped connecting form are all adopted for the upper and lower floor slot,which could effectively reduce the peak stress of the connecting place between the floor slot and the wall under the earthquake action along the river direction,then the design of the structural strength is benefit.

[Key words]hydropower plant;connecting form of floor slab;structure performance;finite element method

Study on contrast test of anti-icing schemes in front of the dam of hydropower station in severe cold area

SUI Wei,LEI Xiu-ling,MENG Ji-hui,LI Zhong-tian

[Abstract]In order to prevent freeze to destroy the surface heat preservation layer of the reconstruction project of Fengman hydropower station,the three anti-icing technology schemes are developed according to the climatic characteristics of the severe cold area,which are water pump jetting method,high pressure gas inflation method and the ship walking disturbance method.Through the anti-icing system design and the field comparison test research,the timeliness and economy of the three schemes are analyzed.The test results show that the anti-icing system with the water pump jetting method could achieve the anti-icing purpose for the linear strip in front of the dam with open lake,which has the good reference function for the similar projects in cold regions.

[Key words]severe cold area;hydropower station;anti-icing;test;the reconstruction project of Fengman hydropower station

Stability test study on permeable tetrahedron river closure material

YIN Yang-song,LI Deng-song,YANG Qing,DAI Guang-qing,DU Zhen-yu

[Abstract]The artificial prefabrication casting material with the solid tetrahedral structure are widely used in the river closure works to replace the massive natural stone,and with the permeable tetrahedron structure are widely used in the river embankment to prevent scour and promote silting-up,which has the good effect.Through the physical model test and based on the structure characteristics of the permeable tetrahedron and the theory of river closure engineering,the paper researches the stability of the material in water,compares with solid tetrahedral structure and discusses the application possibility of the permeable tetrahedron in river closure works.The results show that the surface holes area ratio of the permeable tetrahedron has the great influence on the stability after entering the water,the best stability is obtained when the holes area ratio is 32.15%,meanwhile,the stop velocity is basically equivalent to the solid tetrahedron,the flow characteristics of the permeable tetrahedron is better than the solid tetrahedron,which could reduce effectively the adverse effects caused by the whirlpool.Appropriately increasing the permeability of the artificial prefabrication river closure material could improve the stability,that is to say,the new approach could be used for reference.

[Key words]permeable tetrahedron;stability;Physical model test;river closure material

Study on insulation measure in winter running for the water conveyance pipeline

GUO Feng,LU Xiao-ting

[Abstract]For the operation concrete structure in winter,the surface temperature of the concrete is affected by the air temperature and the solar radiation heat,then the large temperature difference is produced between the inner and outer wall of the water conveyance pipeline to affect the safety reliability of the structure.According to the solid heat conduction theory and the boundary condition,the ANSYSY finite element software is used to simulate the condition of the water conveyance pipeline with the insulation and non-insulation measures under the condition of water conveyance in winter.The numerical simulation results show that the temperature drops rapidly in winter would cause the occurrence of temperature cracks on the surface of pipeline,if the insulation measures are adopted,the temperature crack could control effectively.

[Key words]water conveyance in winter;water conveyance pipeline;temperature field;temperature stress;insulation effect


登錄APP查看全文

主站蜘蛛池模板: 免费jjzz在在线播放国产| 国产成人无码Av在线播放无广告| 久久美女精品| 国产精品视频系列专区| 国产一区二区在线视频观看| 热99精品视频| 欧美日韩导航| 色婷婷在线影院| 另类重口100页在线播放| 亚洲天堂视频在线免费观看| 欧洲日本亚洲中文字幕| 亚洲福利视频一区二区| 国产小视频免费| 午夜毛片福利| 久久黄色免费电影| 婷婷六月综合| 一本无码在线观看| 高清久久精品亚洲日韩Av| 亚国产欧美在线人成| 欧美a级完整在线观看| 国产又粗又猛又爽| 国产欧美网站| 一级毛片免费高清视频| 欧美午夜在线视频| 国产在线观看人成激情视频| 精品人妻AV区| 国产视频你懂得| 国产毛片不卡| 久久精品国产91久久综合麻豆自制| 精品综合久久久久久97超人该| 狠狠做深爱婷婷久久一区| 囯产av无码片毛片一级| 色综合a怡红院怡红院首页| 免费可以看的无遮挡av无码| 国产黄视频网站| 免费a级毛片视频| 色久综合在线| 国产成人免费观看在线视频| 亚洲精品亚洲人成在线| 国产午夜一级毛片| 国产黑人在线| 色呦呦手机在线精品| 亚洲精品欧美日本中文字幕| 国产视频一区二区在线观看| 国产欧美精品一区aⅴ影院| 国产大片喷水在线在线视频| 波多野吉衣一区二区三区av| 亚洲日韩久久综合中文字幕| 国产丝袜精品| 亚洲欧美日韩高清综合678| 91免费精品国偷自产在线在线| 日韩精品久久无码中文字幕色欲| 青青草原国产av福利网站| 国模私拍一区二区| 欧美一区二区三区国产精品| 中文字幕亚洲乱码熟女1区2区| 99激情网| 精品视频在线一区| 亚洲第一色网站| 新SSS无码手机在线观看| 中文纯内无码H| 久久天天躁夜夜躁狠狠| 丰满人妻久久中文字幕| 久久久久亚洲av成人网人人软件| 久久99国产综合精品1| 亚洲不卡影院| 欧美日韩精品综合在线一区| 国产三级国产精品国产普男人| 色色中文字幕| 欧美日韩成人在线观看| 亚洲欧美不卡中文字幕| 国产精品嫩草影院av| 国产欧美视频在线| 精品国产免费人成在线观看| 国产成人成人一区二区| 亚洲成年网站在线观看| 91麻豆国产精品91久久久| 精品综合久久久久久97| 一本色道久久88| 久久婷婷人人澡人人爱91| 在线欧美日韩国产| 91美女视频在线|