馮玉剛
【摘 要】在現(xiàn)代化科學(xué)技術(shù)發(fā)展的推動(dòng)下,我國的空調(diào)制造系統(tǒng)應(yīng)用技術(shù)得到大力發(fā)展。對(duì)空調(diào)設(shè)計(jì)系統(tǒng)與調(diào)試技術(shù)進(jìn)行不斷提升,是促進(jìn)空調(diào)使用和系統(tǒng)發(fā)展的重要途徑。VAV系統(tǒng)作為目前較為常見的空調(diào)應(yīng)用系統(tǒng),對(duì)其系統(tǒng)設(shè)計(jì)與調(diào)試技術(shù)進(jìn)行研究和優(yōu)化,對(duì)空調(diào)制造與應(yīng)用具有積極的意義。
【Abstract】With the development of modern science and technology, the application technology of air conditioning manufacturing system in China has been greatly developed. Continuously improving the air conditioning design system and the debugging technology is an important way to promote the use of air conditioning and the development of the system. VAV system, as a common air-conditioning application system, the research and optimization of its system design and debugging technology has a positive significance to the manufacture and application of air conditioning.
【關(guān)鍵詞】VAV系統(tǒng);設(shè)計(jì)調(diào)試;變風(fēng)量控制
【Keywords】VAV system; design and debugging; variable air volume control
【中圖分類號(hào)】TU831.3 【文獻(xiàn)標(biāo)志碼】A 【文章編號(hào)】1673-1069(2018)05-0176-02
1 引言
隨著現(xiàn)代人們的生活水平逐漸提升,人們?cè)谏钸^程中,對(duì)于自身生活品質(zhì)的要求也在逐漸提高。VAV空調(diào)系統(tǒng)作為調(diào)節(jié)人們生活環(huán)境溫度的重要工具,在其幫助下,有效轉(zhuǎn)變了人們的生活習(xí)慣。但是隨著社會(huì)的發(fā)展,以及全球氣候變暖的影響,傳統(tǒng)的空調(diào)已經(jīng)不能滿足于現(xiàn)代人們的生活辦公需求,應(yīng)該對(duì)其系統(tǒng)應(yīng)用做出全面設(shè)計(jì)和轉(zhuǎn)變,提升空調(diào)服務(wù)性能。本文通過對(duì)VAV空調(diào)系統(tǒng)設(shè)計(jì)及調(diào)試分析,闡述了在現(xiàn)代化科學(xué)技術(shù)的發(fā)展應(yīng)用下,應(yīng)該如何進(jìn)行空調(diào)系統(tǒng)設(shè)計(jì)和調(diào)試才能滿足人們的生活,對(duì)于VAV空調(diào)系統(tǒng)的推廣而言,具有重要意義。
2 VAV系統(tǒng)的技術(shù)和使用優(yōu)勢(shì)
VAV系統(tǒng)相較于傳統(tǒng)的空調(diào)系統(tǒng)具有較為明顯的技術(shù)和使用優(yōu)勢(shì),如下表1所示。
3 VAV系統(tǒng)設(shè)計(jì)要點(diǎn)分析
3.1 變風(fēng)量末端選型
在VAV系統(tǒng)設(shè)計(jì)當(dāng)中,根據(jù)工程環(huán)境、工程規(guī)模以及技術(shù)要點(diǎn)等因素,系統(tǒng)地、綜合地對(duì)變風(fēng)量末端設(shè)備進(jìn)行選取與應(yīng)用,是系統(tǒng)設(shè)計(jì)中的重要環(huán)節(jié),也是保證系統(tǒng)運(yùn)行質(zhì)量與效率的重要因素[1]。在設(shè)計(jì)過程中,設(shè)計(jì)人員要對(duì)工程實(shí)施的地點(diǎn)、環(huán)境因素、技術(shù)實(shí)施條件等進(jìn)行實(shí)地調(diào)查分析,同時(shí),對(duì)不同廠家、型號(hào)的設(shè)備特征以及國家、行業(yè)的相關(guān)技術(shù)規(guī)范進(jìn)行綜合分析,并選擇、設(shè)定適合本系統(tǒng)工程的設(shè)備參數(shù)與指標(biāo)。
3.2 控制原件技術(shù)要點(diǎn)
傳感器是保證VAV系統(tǒng)運(yùn)行質(zhì)量的重要基礎(chǔ),傳感器設(shè)置的位置、安裝技術(shù)能夠?qū)ο到y(tǒng)的運(yùn)行產(chǎn)生重要影響。對(duì)于靜壓傳感器的安裝來說,安裝位置應(yīng)該設(shè)置在送風(fēng)機(jī)入口的2/3處,同時(shí)要保證靜壓傳感器位于系統(tǒng)主管道上,在此位置上靜壓傳感器能夠產(chǎn)生優(yōu)良的運(yùn)行效果[2]。另外,需要在靜壓傳感器安裝設(shè)計(jì)中明確,靜壓傳感器不能夠安裝在變徑處、彎頭處以及三通處。對(duì)于系統(tǒng)壓差變壓器安裝位置的設(shè)計(jì)選取,要保證其處于變風(fēng)量末端入口處,保證對(duì)空間溫度以及氣流的有效感知與控制。
4 VAV系統(tǒng)施工分析
4.1 風(fēng)管施工
在VAV系統(tǒng)運(yùn)行中,根據(jù)空間負(fù)荷的變化,風(fēng)管內(nèi)部靜壓力會(huì)逐漸產(chǎn)生變化,當(dāng)內(nèi)部壓力過大時(shí)風(fēng)管將會(huì)發(fā)生漏風(fēng)現(xiàn)象。為了防止過量漏風(fēng)對(duì)系統(tǒng)運(yùn)行造成不利影響,在系統(tǒng)設(shè)計(jì)施工中要對(duì)風(fēng)管的密封程度進(jìn)行規(guī)范化設(shè)計(jì)與施工。其一,要對(duì)風(fēng)管咬口密封處的密封材料以及測試指標(biāo)進(jìn)行明確,保證密封質(zhì)量;其二,明確系統(tǒng)中的法蘭風(fēng)管連接處的膠片質(zhì)量以及施工技術(shù)標(biāo)準(zhǔn),其三,對(duì)于風(fēng)管主管道與支管的連接處要進(jìn)行重點(diǎn)關(guān)注,基于風(fēng)管接口預(yù)留以及漏風(fēng)測試的難度較高,設(shè)計(jì)時(shí)要明確規(guī)定在連接處設(shè)置密封墊圈。
4.2 噪聲處理
VAV系統(tǒng)設(shè)計(jì)應(yīng)用中,對(duì)于系統(tǒng)噪聲的防控是設(shè)計(jì)工作的要點(diǎn)之一。VAV系統(tǒng)運(yùn)行的噪音來源主要是空調(diào)處理機(jī)、排風(fēng)機(jī)以及風(fēng)閥、封口以及彎頭部位。針對(duì)噪音來源,在設(shè)計(jì)施工中要對(duì)處理機(jī)的型號(hào)與技術(shù)參數(shù)進(jìn)行明確,通過對(duì)設(shè)備風(fēng)機(jī)運(yùn)行、傳動(dòng)方式的分析,選取噪音相對(duì)較小的處理機(jī)。對(duì)于管道噪音問題來說,在設(shè)計(jì)中可以于管道中設(shè)置復(fù)合式消聲器,有效降低和消除系統(tǒng)運(yùn)行時(shí)產(chǎn)生的中低頻噪音。
5 VAV系統(tǒng)調(diào)試要點(diǎn)分析
5.1 系統(tǒng)風(fēng)量調(diào)試
為了保障VAV空調(diào)系統(tǒng)的運(yùn)行應(yīng)用安全,相關(guān)的空調(diào)安裝者,在安裝技術(shù)實(shí)施結(jié)束之后,應(yīng)該針對(duì)技術(shù)安裝實(shí)施的系統(tǒng)調(diào)試做出專門的分析。將系統(tǒng)風(fēng)量調(diào)試控制好,才能保障整體的系統(tǒng)應(yīng)用效果,實(shí)現(xiàn)系統(tǒng)調(diào)試性能提升[3]。在進(jìn)行系統(tǒng)風(fēng)量調(diào)試過程中,安裝師首先根據(jù)系統(tǒng)出風(fēng)量的大小對(duì)系統(tǒng)風(fēng)量傳輸進(jìn)行風(fēng)量控制設(shè)計(jì)。其次,將風(fēng)管內(nèi)的出風(fēng)量控制設(shè)定在固定的范圍內(nèi),保障在其出風(fēng)設(shè)計(jì)過程中,能夠測出風(fēng)量變化的波動(dòng)值,保障在波動(dòng)值的處理過程中,能夠?qū)⑾到y(tǒng)的風(fēng)量傳輸效果測試出來。
5.2 系統(tǒng)定壓調(diào)試
系統(tǒng)定壓調(diào)試在整個(gè)VAV系統(tǒng)的調(diào)試中也是較為重要的,只有保障在系統(tǒng)調(diào)試過程中,能夠?qū)⑾到y(tǒng)內(nèi)的定壓調(diào)試處理好,這樣才能保障系統(tǒng)定壓輸送中,能夠?qū)崿F(xiàn)空調(diào)的送風(fēng)機(jī)傳風(fēng)壓力增加[4]。作為空調(diào)安裝師,在進(jìn)行空調(diào)的安裝調(diào)試過程中,首先要進(jìn)行的就是對(duì)空調(diào)系統(tǒng)內(nèi)的定壓測試數(shù)據(jù)帶入,按照公式:PY=P0×(1-0.37×Os/O0)將相應(yīng)的數(shù)據(jù)帶入整個(gè)系統(tǒng)運(yùn)行內(nèi),經(jīng)過系統(tǒng)運(yùn)行調(diào)試分析之后將整個(gè)系統(tǒng)定壓測試的結(jié)果表現(xiàn)出來,具體的系統(tǒng)測試定壓效果表現(xiàn)為系統(tǒng)內(nèi)部最大風(fēng)壓值達(dá)到系統(tǒng)出風(fēng)量控制的90%。
5.3 系統(tǒng)送風(fēng)溫度調(diào)試
VAV系統(tǒng)的應(yīng)用調(diào)試過程中,相關(guān)人員為了能夠發(fā)揮出整體的系統(tǒng)調(diào)試效果,在進(jìn)行系統(tǒng)的調(diào)試過程中,針對(duì)系統(tǒng)調(diào)試中的空調(diào)送風(fēng)溫度應(yīng)用進(jìn)行專門的調(diào)試,保障在空調(diào)系統(tǒng)的送風(fēng)溫度調(diào)試過程中,能夠?qū)⒄麄€(gè)VAV系統(tǒng)運(yùn)行中的送風(fēng)溫度精準(zhǔn)性提升,作為空調(diào)安裝管理者,在進(jìn)行調(diào)試溫度的測試過程中,應(yīng)該選用熱風(fēng)和冷風(fēng)兩種調(diào)試溫度測試法,針對(duì)不同的溫度調(diào)試方法進(jìn)行溫度測試,確保在不同的空調(diào)運(yùn)行模式下,其對(duì)應(yīng)的空調(diào)溫度是對(duì)等的,實(shí)現(xiàn)VAV空調(diào)系統(tǒng)更好地為人們服務(wù)。
6 結(jié)論
綜上所述,在現(xiàn)代化科學(xué)技術(shù)的發(fā)展引導(dǎo)下,我國的空調(diào)制造行業(yè)在其行業(yè)發(fā)展中,對(duì)于空調(diào)的設(shè)計(jì)和調(diào)試也在逐漸提升,按照這種趨勢(shì)發(fā)展,VAV系統(tǒng)應(yīng)用的空調(diào)將會(huì)被更多的人接受,但是在該系統(tǒng)的空調(diào)設(shè)計(jì)和調(diào)試過程中,應(yīng)該注重對(duì)其設(shè)計(jì)和調(diào)試要點(diǎn)分析,保障在設(shè)計(jì)和調(diào)試分析過程中,能夠提升整體的系統(tǒng)應(yīng)用效果,實(shí)現(xiàn)VAV系統(tǒng)空調(diào)更好地為人們服務(wù)。施工設(shè)計(jì)中的要點(diǎn)為變風(fēng)量選型、風(fēng)管施工、控制元件施工與噪聲處理。調(diào)試要點(diǎn)為系統(tǒng)風(fēng)量調(diào)試、系統(tǒng)定壓調(diào)試、系統(tǒng)水循環(huán)調(diào)試和系統(tǒng)送風(fēng)溫度調(diào)試。
【參考文獻(xiàn)】
【1】徐曉輝.變風(fēng)量(VAV)空調(diào)系統(tǒng)控制及安裝調(diào)試控制要點(diǎn)[J].商品與質(zhì)量,2017,36(8):145-147.
【2】陳輝.VAV空調(diào)系統(tǒng)調(diào)試過程中相關(guān)問題及解決方案[J].商品與質(zhì)量,2016,45(31):456-458.
【3】郭麗巖.探析變風(fēng)量(VAV)空調(diào)系統(tǒng)安裝調(diào)試問題[J].城市建筑,2016,33(29):147-147.
【4】張良.基于Lonworks的VAV空調(diào)系統(tǒng)實(shí)驗(yàn)平臺(tái)設(shè)計(jì)[J].通訊世界,2017,42(17):250-251.