【摘 要】本文對(duì)礦井型大型重介選煤廠動(dòng)力配電系統(tǒng)設(shè)計(jì)中,常存在的各種現(xiàn)象進(jìn)行全面分析,提出在全廠動(dòng)力配電系統(tǒng)設(shè)計(jì)審查時(shí)應(yīng)重點(diǎn)關(guān)注的幾個(gè)問(wèn)題,對(duì)于完善選煤廠動(dòng)力配電系統(tǒng)設(shè)計(jì),保障全廠供電全面、安全、可靠,促進(jìn)整個(gè)系統(tǒng)穩(wěn)定運(yùn)行,具有較大的現(xiàn)實(shí)指導(dǎo)意義。
【關(guān)鍵詞】選煤廠;配電設(shè)計(jì);審查;問(wèn)題
The Design Review of the Power Distribution System in the Coal Preparation Plant,Several Problems Should be Paid Close Attention
CAO Jun-feng CHEN Song
(Yuncheng Coal Mine of Shandong Province, Yuncheng Shandong, 274700, China)
【Abstract】This article comprehensively analyses various phenomena, which exists in the power distribution’s design of the large heavy coal mine type’s coal preparation plant. And gives several suggestions we should pay more attention to the design review of the entire plant’s power distribution system, those suggestions have significance practical guidance for improving the design of the power distribution system in the coal preparation plant, ensure an comprehensive, security, reliable power supply of the entire plant, and promote a steady operation of the system.
【Key words】Coal preparation plant; Design of the power distribution; Review; Problems
0 引言
選煤廠動(dòng)力配電系統(tǒng)設(shè)計(jì)中,經(jīng)常存在因洗選工藝復(fù)雜、各車間機(jī)電設(shè)備數(shù)量眾多,出現(xiàn)諸如低壓電機(jī)回路斷路器容量與電機(jī)實(shí)際功率不符、低壓配電回路或電機(jī)回路設(shè)計(jì)考慮不全等問(wèn)題;動(dòng)力配電設(shè)備采購(gòu)訂貨前,建設(shè)單位與設(shè)計(jì)單位未對(duì)設(shè)計(jì)圖紙?jiān)敿?xì)審查,從而導(dǎo)致設(shè)備安裝時(shí)出現(xiàn)某電機(jī)回路、配電回路無(wú)法正常運(yùn)行等等。因此,在動(dòng)力配電設(shè)備訂貨前,對(duì)全廠動(dòng)力配電系統(tǒng)設(shè)計(jì)進(jìn)行全面、細(xì)致審查尤為重要。
1 選煤廠動(dòng)力配電系統(tǒng)設(shè)計(jì)經(jīng)常存在的現(xiàn)象
大型重介選煤廠洗選工藝復(fù)雜,篩分、洗選、濃縮、壓濾、儲(chǔ)裝運(yùn)等各環(huán)節(jié)機(jī)電設(shè)備數(shù)量多;設(shè)計(jì)單位負(fù)責(zé)動(dòng)力配電系統(tǒng)設(shè)計(jì)與負(fù)責(zé)洗選工藝設(shè)計(jì)的相關(guān)設(shè)計(jì)人員必須要及時(shí)溝通、密切協(xié)作,才能比較好的完成設(shè)計(jì);否則就會(huì)出現(xiàn)各類設(shè)計(jì)問(wèn)題。比如某礦240萬(wàn)噸/年重介選煤廠,其全廠各類大大小小電機(jī)總數(shù)約為250臺(tái)左右;因此,其全廠動(dòng)力配電系統(tǒng)設(shè)計(jì)任務(wù)量大、內(nèi)容繁雜,負(fù)責(zé)動(dòng)力配電與洗選工藝的設(shè)計(jì)人員之間如不做充分的溝通,很容易出現(xiàn)這樣那樣的設(shè)計(jì)問(wèn)題。動(dòng)力配電系統(tǒng)設(shè)計(jì)中常存在的問(wèn)題有以下幾點(diǎn):
1.1 高壓動(dòng)力配電系統(tǒng)設(shè)計(jì)存在的現(xiàn)象
選煤廠各變電所為高壓電動(dòng)機(jī)備用的高壓開(kāi)關(guān)柜數(shù)量不足,或?yàn)槎嗯_(tái)高壓電動(dòng)機(jī)備用高壓開(kāi)關(guān)柜時(shí)備用不合理。
1.2 低壓動(dòng)力配電系統(tǒng)設(shè)計(jì)存在的問(wèn)題
選煤廠各變電所低壓配電室,一是,部分配電回路、電機(jī)回路的斷路器容量與實(shí)際回路電動(dòng)機(jī)功率不符,一般是回路電機(jī)實(shí)際功率大,而設(shè)計(jì)回路斷路器容量小;二是,洗選工藝調(diào)整后增加部分設(shè)備,其相應(yīng)的配電回路或電機(jī)回路未及時(shí)設(shè)計(jì);三是設(shè)計(jì)備用的配電回路、電機(jī)回路,備用不合理。
1.3 全廠照明系統(tǒng)及檢修配電系統(tǒng)設(shè)計(jì),與車間實(shí)際需要不符
存在車間照明照度不夠,檢修配電系統(tǒng)無(wú)法使用等。
2 動(dòng)力配電系統(tǒng)設(shè)計(jì)審查,應(yīng)重點(diǎn)關(guān)注幾個(gè)問(wèn)題
2.1 認(rèn)真審查低壓一次系統(tǒng)圖設(shè)計(jì)
礦井型大型重介選煤廠低壓動(dòng)力配電設(shè)計(jì)內(nèi)容繁雜、需要配電設(shè)備數(shù)量眾多,必須對(duì)照選煤廠最終版設(shè)備清冊(cè)或各類設(shè)備技術(shù)協(xié)議,逐一的對(duì)各低壓配電回路、電機(jī)回路進(jìn)行設(shè)計(jì)審查,以確保設(shè)備供電安全。一是,部分低壓配電回路、電機(jī)回路的斷路器容量與實(shí)際回路電動(dòng)機(jī)功率不符。某礦選煤廠(1)動(dòng)篩車間低壓配電設(shè)計(jì)中,AP25柜原煤倉(cāng)入洗給煤機(jī)一回、原煤倉(cāng)入洗給煤機(jī)二回,原設(shè)計(jì)為5.5×6=33 kW,審查后及時(shí)調(diào)整為7.5×6=45 kW;AP13柜配倉(cāng)刮板機(jī)1、配倉(cāng)刮板機(jī)2,原設(shè)計(jì)為75kW,審查后及時(shí)調(diào)整為90 kW;(2)主廠房變電所低壓配電室AP4柜,離心機(jī)配電回路,原設(shè)計(jì)為30kW,審查后及時(shí)調(diào)整為38.48 kW;(3)壓濾車間AP4柜煤泥刮板機(jī),原設(shè)計(jì)為110 kW,審查后及時(shí)調(diào)整為132 kW;壓濾車間AP7柜空壓機(jī)1~空壓機(jī)3控制柜,原設(shè)計(jì)為30×3 kW,審查后及時(shí)調(diào)整為90×3 kW等等。二是,洗選工藝調(diào)整后增加的部分配電回路、電機(jī)回路未及時(shí)設(shè)計(jì)。某礦選煤廠(1)壓濾車間工藝系統(tǒng)優(yōu)化后,新增加的2臺(tái)TBS入料泵,原設(shè)計(jì)沒(méi)有考慮配電,審查后及時(shí)增加這2處電動(dòng)機(jī)回路22×2 kW;(2)主廠房新增加的30 kW除鐵器1臺(tái),原設(shè)計(jì)沒(méi)有考慮,審查后及時(shí)增加除鐵器配電回路等等;(3)新增加兩處轉(zhuǎn)載點(diǎn)集中水窩水池的渣漿泵7.5×2 kW,沒(méi)有考慮配電,審查后及時(shí)增加這兩路配電。三是,備用的配電回路、電機(jī)回路,備用不合理;動(dòng)力配電系統(tǒng)設(shè)計(jì)時(shí),設(shè)計(jì)人員一般會(huì)考慮一定數(shù)量備用配電回路、電動(dòng)機(jī)回路,但備用回路設(shè)計(jì)往往較隨意,不是針對(duì)性的為相對(duì)重要電機(jī)或設(shè)備考慮備用。如某礦選煤廠(1)動(dòng)篩車間配倉(cāng)刮板機(jī)、原煤分級(jí)篩等重要設(shè)備沒(méi)有設(shè)計(jì)備用回路,而斗提機(jī)、底流泵等小功率電機(jī)卻設(shè)計(jì)了備用回路;(2)主廠房精煤脫介篩、中煤脫介篩、矸石脫介篩、精煤離心機(jī)、中煤離心機(jī)、精煤泥離心機(jī)、中煤泥離心機(jī),這些重要設(shè)備設(shè)計(jì)了備用回路,但備用回路數(shù)量少;都屬于典型的備用回路設(shè)計(jì)不合理。
2.2 詳細(xì)審查高壓一次系統(tǒng)圖設(shè)計(jì)
礦井型大型重介選煤廠動(dòng)力配電系統(tǒng)設(shè)計(jì)時(shí),一般在用電負(fù)荷中心設(shè)計(jì)選煤廠中央變電所,然后由該中央變電所為其他車間變電所供電。如某礦選煤廠中央變電所負(fù)責(zé)為全廠供電,其中為動(dòng)篩車間2路動(dòng)力變壓器供電、為主廠房10kV變電所配出2路、為儲(chǔ)裝運(yùn)10kV變電所配出2路、為壓濾車間10kV變電所配出1路、為2臺(tái)高壓電動(dòng)機(jī)配電;開(kāi)始設(shè)計(jì)時(shí)沒(méi)有考慮為2臺(tái)高壓電動(dòng)機(jī)備用高壓開(kāi)關(guān)柜,設(shè)計(jì)審查時(shí)建設(shè)單位提出意見(jiàn)后,設(shè)計(jì)單位才為2臺(tái)高壓電動(dòng)機(jī)、6臺(tái)高壓配電柜設(shè)計(jì)備用開(kāi)關(guān)柜。
2.3 全面審查全廠照明系統(tǒng)及檢修配電系統(tǒng)設(shè)計(jì)
一是,設(shè)計(jì)人員在進(jìn)行全廠照明系統(tǒng)及檢修配電系統(tǒng)設(shè)計(jì)時(shí),往往存在套用、沿用以往設(shè)計(jì)的現(xiàn)象,或根據(jù)之前設(shè)計(jì)經(jīng)驗(yàn)進(jìn)行主觀設(shè)計(jì)現(xiàn)象;因此設(shè)計(jì)的各車間及廠區(qū)照明系統(tǒng),實(shí)際使用中往往存在車間照明照度不夠、重要設(shè)備及重要場(chǎng)所需另外增加照明燈具現(xiàn)象。二是,某礦選煤廠檢修配電系統(tǒng)設(shè)計(jì)時(shí),原先設(shè)計(jì)一套380V檢修配電系統(tǒng),并隨同土建工程招標(biāo),和照明系統(tǒng)放在了一起;檢修電源引自各車間變電所照明變壓器,在各車間各層、煤倉(cāng)頂?shù)忍幇惭b檢修插座箱,檢修時(shí)電源引自各檢修插座箱;但其檢修插座箱斷路器設(shè)計(jì)容量小,建設(shè)單位核算后,原設(shè)計(jì)僅能滿足BX3-250型手提式交流電焊機(jī)焊接作業(yè)使用,對(duì)功率稍大的BX3-315、400交流焊機(jī)、或焊接18mm、20mm厚鋼板溜槽時(shí),就無(wú)法使用,焊接鋼板時(shí)存在焊不透等情況;后又在全廠范圍內(nèi)增加一套660V檢修配電箱,才滿足實(shí)際檢修焊接需要。
3 結(jié)束語(yǔ)
了解大型重介選煤廠動(dòng)力配電系統(tǒng)設(shè)計(jì)中常出現(xiàn)的問(wèn)題,在動(dòng)力配電系統(tǒng)設(shè)備采購(gòu)訂貨前,組織設(shè)計(jì)與建設(shè)等單位充分溝通、及時(shí)發(fā)現(xiàn)問(wèn)題、及時(shí)調(diào)整設(shè)計(jì)、完善配電系統(tǒng),對(duì)于保證全廠設(shè)備合理供電、消除隱患、降低維修工作量和促進(jìn)整個(gè)系統(tǒng)安全穩(wěn)定運(yùn)行,具有較大的現(xiàn)實(shí)指導(dǎo)意義。