Design on Heavy Oil Wellbore Lift Simulation Experiment Device

2013-06-02 06:17:06WANGXiaomeiYUZhongshengDINGYouqingZHUXincai
機床與液壓 2013年18期

WANG Xiaomei ,YU Zhongsheng,DING Youqing,ZHU Xincai

1.Chongqing University of Science and Technology,Chongqing 401331,China;2.Chongqing University of Technology,Chongqing 400054,China

1.Introduction

The heavy oil exploitation is complex and high cost,and there are many rules have not been mastered.Heavy oil is Non-newtonian fluid.Its physical and chemical flow regularity is quite complex.Multiphase flow model used in engineering currently is obtained through thin oil(Newtonian fluid)flows based on the low pressure test or field test conditions.The model does not apply to heavy oil flow regularity.Therefore,experimental research in this field is an urgent need.It is necessary to develop a new experimental device to provide a scientific basis for understanding the mechanism and laws of heavy oil flow.This paper briefly introduces the structure design of a heavy oil wellbore lift simulation experiment device.

2.Structure of heavy oil wellbore lift simulation experiment device

The wellbore lift simulation experiment device is designed to be a modular small test simulation device.It consists of four parts,including mixing shear module module,module and circular pipe flow circulation module.

Each code illustrated in Fig.1 is shown in Table 1.

Fig.1 Basic structure of the experiment device

3.Characteristics of experiment device

The experimental device has the following features:

1)It can simulate the actual pumping process flow condition.The actual production process is a one-way fluid flow.

2)It realizes the cycle,avoids the dead zone,makes the mix more evenly and higher efficiency,and accords with the real condition.Especially because the static mixer requires one-way flow,it is dif-ficult to evaluate its characteristics if it uses reciprocating driving.

3)Due to the realization of circulation,it makes the heating insulation of the whole system more uniform.

4)The vertical lifting test process is more stable and can be repeated many times,which gets more accurate data.

5)Feeding and sampling are not affected by the volume effect,which is very convenient.

Tab.1 Illustration of each code

4.Instructions of experimental process

1)Experiment preparations

The heavy oil and treatment agent are respectively put into reservoir T2 and T3,and they are put in test requirements for heating and stirred to spare.The purpose of these preparations is to ensure that heavy oil has good fluidity,otherwise the metering pumps can not work normally.

2)Heavy oil flow test

①According to the set proportion to start metering pumps C1 and C2,heavy oil and treatment agent are mixed into reservoir T1.

② The test fluid is heated,stirred and mixed in T1,until it is mixed evenly.

③ Open the manual globe valves F3,F4(or F1,F2)and the electric globe valves K1,K2,and then open the manual globe valve F5 to make the test liquid flow down into the test piping and piston pump cylinder.

④Start the stepping motor DK.At the same time,respectively control the electric globe valves K1 and K2 on or off.It can make fluid in the pipe line further circulation process,and detect parameters until the mixed liquid meets the testing requirements.

⑤Test flow parameters of fluid in measuring section,including differential pressure in measuring section,total pressure in vertical section and fluid flow pipeline etc.And record the related data and test curve,until it reaches the experiment requirement.

⑥ Calculate the test results,analyze the related results,and display and print the test results report.

Note:According to the specific needs in the process of the flow test,respectively make the liquid flow through or not through the mixer.So simulate the actual working condition in the process of pumping which install underground mixer or not,and then make the related evaluation.

Mixture flows into lift module after single or multiple flows through the pump.In lift module,mixture liquid column can move up and down under the control of reciprocating pump,and related flow parameters are obtained through the measuring section.

Each module has its own test system,circulation system and temperature control system,can be run separately and determine the operating effects of various components,and can also analyze the overall effect of the wellbore lift after each module combination.And the corresponding facilities can realize the overall circulation.

3)Mixer flow testing experiment

①According to the set proportion to start metering pump C1 and C2,heavy oil and treatment agent are mixed into reservoir T1.

② Open the manual globe valves F3,F4 and the electric globe valves K1,K2,and then open the manual globe valve F5 to make the test liquid flow down into the test piping and piston pump cylinder.

③Start the stepping motor DK.At the same time,respectively control the electric globe valves K1 and K2 on or off.Pump mixed liquid to observation window G3 height position so far.

④ Shut down electric globe valve K2,and then start stepping motor/piston pump.According to the experiment requirements,make the mixture reciprocating flow through the mixer a certain number of times,and record related parameters(differential pressure in mixer section).At the same time,take the sample,analyze and evaluate the liquid mixing effect under the corresponding number of mixed times by open valve F6.

⑤Contrast and analyze the test results and the mixed effects,display and print the test results report.

Note:The mixed effect of mixer can also be evaluated directly by circulation flow test of mixing liquid under the same conditions.

4)Clean the test system.

①Open the manual globe valve F6 for the fluid discharge.

② Start metering pumps C1 and C2,and pump the residual heavy oil and the treatment agent into reservoir T1,then the mixture is discharged from valve F6.

③Add detergent respectively into the heavy oil reservoir T2 and the treatment agent reservoir T3,and carry out stirring and cleaning.

④ Close the manual globe valve F6,and then start metering the pumps C1 and C2.Mix the detergent into the mixture reservoir T1,and start stirrer and piston pump repeated cyclically to clean the entire pipeline.

⑤Open the manual globe valve F6 to make all detergent mixture flow out.

Note:The cleaning process can be repeated several times until the system pipelines and reservoirs are cleaned up basically.

[1]DU Dianfa,SHI Dayou,ZHANG Yuxiao,et al.Horizontal Wells Development Optimization in Supper Heavy Oil Reservoir[J].Petroleum Geology & Oililfield Development in Daqing,2009,28(6):96-99.

[2]CHEN Rongzhen.Introduction to Oil Drilling Machinery[M].Shangdong:Petroleum University Press,2001.

[3]CHEN Yuquan,GE Wenxun.Modern sensor principle and application[M].Beijing:Science Press,2007.

[4]CHEN Boshi.Electric Drive Automatic Control System-Motion Control System[M].Beijing:Mechanical Industry Press,2004.

主站蜘蛛池模板: 波多野结衣无码中文字幕在线观看一区二区| 亚洲无码高清一区二区| 亚洲人成人无码www| 亚洲床戏一区| 国产97视频在线观看| 国产成人高精品免费视频| 黄色网页在线观看| 色久综合在线| 欧美一级黄片一区2区| 亚洲欧州色色免费AV| 欧美亚洲激情| 欧美一级特黄aaaaaa在线看片| 精品国产91爱| 欧美中文字幕一区| 欧美中文一区| 亚洲精品视频免费观看| 亚洲精品国产综合99久久夜夜嗨| 亚洲va在线∨a天堂va欧美va| 久久综合干| 免费毛片在线| 久久青草精品一区二区三区| 日韩天堂在线观看| 最近最新中文字幕免费的一页| 国产精品第| 国产欧美另类| 色哟哟色院91精品网站| 午夜视频日本| 欧美成人午夜影院| 欧美中文字幕在线视频 | 尤物在线观看乱码| 尤物亚洲最大AV无码网站| 国产成在线观看免费视频 | 亚洲人成亚洲精品| 国产96在线 | 久久婷婷人人澡人人爱91| 玖玖精品在线| 亚洲国产成人在线| 国产美女无遮挡免费视频网站 | 青青草91视频| yjizz视频最新网站在线| 国产福利免费在线观看| 日本成人在线不卡视频| 久久人体视频| 亚洲最大福利网站| 在线无码九区| 凹凸国产分类在线观看| 国产国产人免费视频成18| 依依成人精品无v国产| 国产无码高清视频不卡| 国产AV毛片| 99爱视频精品免视看| 中文字幕自拍偷拍| 2021亚洲精品不卡a| 免费看av在线网站网址| 色悠久久久久久久综合网伊人| 精品久久蜜桃| 精品少妇人妻一区二区| 无码内射在线| 999精品免费视频| 国产午夜福利亚洲第一| 日韩小视频网站hq| 亚洲AV成人一区二区三区AV| 中文字幕无码中文字幕有码在线| 国产精品3p视频| 久久公开视频| 亚洲欧洲日本在线| 强乱中文字幕在线播放不卡| 97久久精品人人做人人爽| 亚洲天堂成人在线观看| 久久夜夜视频| 欧美午夜一区| 丁香婷婷激情综合激情| 另类欧美日韩| 午夜成人在线视频| 久久午夜夜伦鲁鲁片无码免费| av午夜福利一片免费看| 久久狠狠色噜噜狠狠狠狠97视色 | 色国产视频| 不卡无码网| 激情六月丁香婷婷四房播| 精品超清无码视频在线观看| 香蕉伊思人视频|