Analysis of mechanical behavior of soft rocks and stability control in deep tunnels

2014-03-18 05:30:55HuiZhouChunqingZhngZhenLiDweiHuJingHou

Hui Zhou,Chunqing Zhng,Zhen Li,Dwei Hu,Jing Hou

aState Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,Wuhan 430071, China

bHydroChina Huadong Engineering Corporation,Hangzhou 310014,China

Analysis of mechanical behavior of soft rocks and stability control in deep tunnels

Hui Zhoua,*,Chuanqing Zhanga,Zhen Lia,Dawei Hua,Jing Houb

aState Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,Wuhan 430071, China

bHydroChina Huadong Engineering Corporation,Hangzhou 310014,China

A R T I C L E I N F O

Article history:

Received 26 February 2014

Received in revised form

6 March 2014

Accepted 15 March 2014

Available online 12 April 2014

Deep tunnel

Soft rock

Water-weakening effect

Large deformation

Stability

Due to the weakness in mechanical properties of chlorite schist and the high in situ stress in Jinping II hydropower station,the rock mass surrounding the diversion tunnels located in chlorite schist was observed with extremely large deformations.This may signi f i cantly increase the risk of tunnel instability during excavation.In order to assess the stability of the diversion tunnels laboratory tests were carried out in association with the petrophysical properties,mechanical behaviors and water-weakening properties of chlorite schist.The continuous deformation of surrounding rock mass,the destruction of the support structure and a large-scale collapse induced by the weak chlorite schist and high in situ stress were analyzed.The distributions of compressive deformation in the excavation zone with large deformations were also studied.In this regard,two reinforcement schemes for the excavation of diversion tunnel bottom section were proposed accordingly.This study could offer theoretical basis for deep tunnel construction in similar geological conditions.

?2014 Institute of Rock and Soil Mechanics,Chinese Academy of Sciences.Production and hosting by Elsevier B.V.All rights reserved.

1.Introduction

The West ends of diversion(high pressure)tunnels#1 and#2 of Jinping II hydropower station were located in the chlorite schist stratum with the length of about 400 m.This stratum is characterized with complex geological conditions,e.g.high in situ stress, and large overburden depth.The main characteristics of chlorite schist are related to the weakness in the mechanical properties, water-weakening effects and signi f i cant creep strain of rocks. Extremely large deformation was observed during construction due to the inadequate support measures,such as delayed support and low-strength support,after excavating the top section of tunnels. The signi f i cant interference of primary support with original lining section contributed to the continuously increasing deformation of rocks.This considerably increases the risk of instability of surrounding rock mass when excavating the bottom section of tunnels,resulting to a problem in the power generation capacity due to reduction of the tunnel cross-section.

Many de f i nitions and/or concepts regarding soft rocks have been proposed(Fan,1995;Guo,1996;Lin,1999).According to the work of Sciotti(1990),soft rocks,i.e.sandstone(Nickmann et al., 2006)and mudstone(Yoshinaka et al.,1997),have the main characteristics such as large deformability,strong dependence of resistance on degree of saturation or temperature,and susceptibility to alteration.For simplicity,soft rocks have been classi f i ed into two sets(Clerici,1992;Russo,1994):geological soft rock and engineering soft rock.The set of the geological soft rock has the intrinsic properties of weakness,looseness and expansibility,while the engineering soft rock generates signi f i cant plastic strain and creep strain subjected to engineered effect.The chlorite schist of Jinping II hydropower station can be viewed as a geological soft rock due to its weakness in mechanical properties,but also as the engineering soft rock due to high in situ stress at depth of approximately 1500 m.

Excavating tunnel in soft rock stratum usually will cause accident due to the complex geological conditions and mechanical behaviors of soft rocks.Many methods of support techniques have been proposed consequently.For example,the New Austrian Tunneling Method(NATM)(Han,1987)which is also known as sequential excavation method(SEM)is a popular method in modern tunnel design and construction.Salamon(1970)studied the support system in terms of energy.The support structure andsurrounding rock simultaneously generate compatible deformation and the support structure can absorb part of dispersed energy from surrounding rock mass.The combined support method(Feng,1990) proposed that increasing the thickness of support was not the optimum method for tunneling in soft rocks,and the method of prefl exibility and post-stiff was of priority.He(1994)suggested that the support technique for deep tunneling should be carried out in two steps: fi rst fl exible support and a coupling support followed for the critical parts.Dong et al.(1994)also proposed support theory for the loose circle in surrounding rock mass.

The support system for tunneling in soft rock is still a challenging issue due to the special mechanical behaviors of soft rocks. Therefore,the stability of the diversion tunnels passing through the chlorite schist stratum of Jinping II hydropower station should be analyzed.Based on this,laboratory tests were conducted to study the petrophysical properties,mechanical behaviors and waterweakening properties of chlorite schist.In addition,the creep deformation of surrounding rock mass,destruction of support structure and large-scale collapse induced by high in situ stress associated with mechanical properties of chlorite schist were analyzed.Accordingly,the excavation and reinforcement schemes for the diversion tunnels construction were proposed.

2.Project overview

Jinping II hydropower station is located at the Yalong River, Sichuan Province,China.The Jinping II hydropower station is well known as a super-large hydropower project due to the ultra-long, deep-buried and large-scale tunnel section.The four parallel diversion tunnels of Jinping II hydropower station are 16.7 km in length and the spacing between two adjacent tunnels is about 60 m.The tunnels 2 and 4 were excavated by drilling-and-blasting method in two steps,while tunnels#1 and#3 by TBMs.Fullsection reinforced concrete tunnel support structure with thickness of 50-140 cm was used.The overburden depth along the tunnel is basically 1500-2000 m and the maximum depth is 2525 m.

The West ends of the diversion tunnels#1 and#2 were located in chlorite schist stratum in the stakes of(1)1+537 and(2)1+613 at the depth of about 1500 m(see Fig.1).The chlorite schist is complex for geological conditions and frequent changes in lithology can be observed.The rocks are mainly green sandstone,green sandstone-marble interbedding,chlorite schist-marble interbedding and chlorite schist.The accumulated lengths of chlorite schist-marble interbedding and chlorite schist in the diversion tunnels#1 and#2 are 264 m and 314 m,respectively.The existence of chlorite schist-marble interbedding and chlorite schist strata caused the major collapse and destruction of primary support due to large deformation of surrounding rock mass in large area. Moreover,large deformation of surrounding rock mass in a large area was also observed in the second excavation(enlarged)and some local large deformation once again caused the destruction of support structure.

3.Physical properties of chlorite schist

Creep deformation,destruction of support structure and largescale collapse were observed during excavation due to the weakness of mechanical properties of chlorite schist and high in situ f i eld stress.These problems should be addressed in order to maintain the progress of project construction.Therefore,related petrophysical tests were carried out to analyze the physical properties and mineral compositions of chlorite schist,which could be helpful to investigate the mechanical behavior and the stability assessment of the diversion tunnels.All the samples are from the stake of(1) 1+760.

3.1.Mineral composition

Four typical samples of chlorite schist were used to identify the mineral composition and the results are shown in Table 1.It clearly shows that the main mineral component is chlorite,which has an evident property of water-argillization.This property is one of the most important factors that cause water-weakening and large deformation of soft rocks.The second main component is amphibole,whose Mohs mineral hardness is twice of the one of chlorite. Some talc is found in all the four samples.Talc has the minimum Mohs mineral hardness among all the mineral components;the sample with the maximum composition of talc thus has the minimum elastic modulus and strength.Moreover,small quantity of calcite is also observed in the sample of IRSM#1.The sample of IRSM#4 contains a little more calcite and some dolomite.This phenomenon can be explicated by the inclusion of marble in the samples of chlorite schist.

3.2.Microstructures of rock samples

Scanning electron microscopy(SEM)was used to observe the microstructures of the four samples in order to study the deformation mechanism of chlorite schist and the results are shown in Fig.2.Except for the sample of IRSM#3,the other three samples have similar mineral arrangement and porous structure.The mineral grains are arranged in orientated layered sheet,resulting in tight porosity structure and low porosity.The sample of IRSM#3 presents disordered mineral arrangement and its porosity is formed by the connection of mineral grains in a dense type.The microstructure of chlorite schist revealed by SEM shows that the samples have low porosity and low permeability.

3.3.Expansibility

The mineral composition in Table 1 shows that no hydrophilic expansion mineral is observed in the samples;the expansibility of chlorite schist is thus not signi f i cantly different from the f i rst estimation.The following expansion tests were performed to investigate the free expansion ratio,axial expansion ratio with lateral restraint and expansion pressure.The results are shown inTable 2.The average values of axial expansion ratio,lateral expansion ratio,volumetric expansion ratio,axial expansion ratio with lateral restraint,and expansion pressure are 0.077%,0.117%, 0.311%,0.102%and 15.35 kPa,respectively.This con f i rms the primary estimation of low expansibility of chlorite schist.

Fig.1.Geological pro f i le along diversion tunnel of Jinping II hydropower station.T1:chlorite schist,T2z:marble,T3:sandy slate,T2b:marble,T2y:marble.

Table 1Mineral identi f i cation results of chlorite schist.

4.Mechanical behaviors and water-weakening properties of chlorite schist

In order to investigate the shrinkage of diversion tunnel crosssection area and determine the excavation and support program, a series of tests,including classical triaxial compression tests and direct shear tests,were carried out on dry and saturated samples. The standard cylinder rock samples with size ofφ50 mm×100 mm were prepared and at least three samples were used at each loading condition.The mechanical behaviors of the two kinds of samples were compared based on the effect of water on the deformation and strength.

4.1.Classical triaxial compression tests

The results of classical triaxial compression tests of chlorite schist for samples#28,#35,#45,#47 and#51 are shown in Fig.3. The studied samples present signi f i cant strain hardening and softening behaviors,in association with con f i ning pressure when considered.The axial stress undergoes a sharp drop under low con f i ning pressure.With the increasing con f i ning pressure,this axial stress drop disappears gradually and perfect plasticity is even observed under the con f i ning pressure of 40 MPa.

Fig.4 shows the evolutions of triaxial compressive strength and elastic modulus with con f i ning pressure.It clearly shows that the failure surface coincides with Mohr-Coulomb linear yield function. The mechanical parameters of saturated samples are lower than those of dry samples.Moreover,the elastic modulus increases with con f i ning pressure due to compaction of the samples during the loading of con f i ning pressure.

The degradation ratio is de f i ned as the ratio of triaxial compressive strength or elastic modulus of saturated sample to the one of the dry sample.The degradation ratios of triaxial compressive strength and elastic modulus between saturated and dry samples are illustrated in Fig.5.The water-weakening effect is not obvious with the increasing con f i ning pressure.The con f i ning pressure near the tunnel is reduced after excavation,thus the signi f i cant degradation in strength and increase in deformation may occur once the surrounding rock in this zone encounters water. After construction of support structure and grout injection,the con f i ning pressure may recover to some extent,which is helpful for the stability of surrounding rocks.

Fig.2.Microstructure of the four samples by SEM.

Table 2Expansion test results of chlorite schist.

It is noted that the triaxial stress was imposed on saturated samples without water drained,thus excess pore pressure may be generated within the samples when applying con f i ning pressure. However,water within the cracks can be drained in surrounding rocks,the water-weakening effect is thus signi f i cantly reduced and the compaction caused by con f i ning pressure is more obvious.

4.2.Direct shear tests

Water mainly exists in original cracks and joints as well as induced cracks due to low porosity and low permeability of intact chlorite schist.These cracks and joints are caused by the shear fracture and then affect the strength of rock mass structure. Therefore,the direct shear tests of single fracture were performed for both dry and saturated samples in order to compare their mechanical responses and to estimate water-weakening effect on the mechanical property of single shear fracture.

First,the direct shear tests of the original samples were conducted to generate shear fracture.Then the direct shear tests of single fracture were performed.The average shear strength parameters of dry and saturated samples are given in Table 3.It clearly shows that the water-weakening effect results in a signi f i cant decrease in cohesion by about 55.58%.This can be attributed to softening effect of water on the roughness of fracture surface,and the uplift part of fracture surface has less resistance in presence of water.The cohesion of samples is thus signi f i cantly decreased and increases the collapse risk of jointed rock mass.Fig.6 shows the relationship between the degradation ratio of shear strength and normal stress.The degradation ratio is gradually increased with the increasing normal stress.

Fig.3.Typical stress-strain curves of classical triaxial compression tests for dry samples#28,#35,#45,#47 and#51 under con f i ning pressure of 0 MPa,5 MPa, 20 MPa,30 MPa and 40 MPa.

Fig.4.Evolutions of elastic modulus and triaxial compressive strength with con f i ning pressure.(a)Relationship between elastic modulus and con f i ning pressure.(b)Relationship between triaxial compressive strength and con f i ning pressure.

4.3.Summary of engineering mechanical properties of chlorite schist

The mechanical behavior of chlorite schist has a close relation with con f i ning pressure.The triaxial compressive strength and elastic modulus both increase with con f i ning pressure.The in situ stress of surrounding rocks is decreased during f i eld stress evolution(redistribution)after excavation,the elastic modulus is thus signi f i cantly decreased and large elastic deformation is generated. In this instance,large deformation of the diversion tunnels in association with the plastic deformation was caused by large-scale excavation damaged zone.Therefore,the support structure is critically important for cracked surrounding rocks.Moreover,the existing water has a signi f i cant effect on the degradation in strength and the increase in deformation,but a desirable con f i ning pressure can reduce the water-weakening effect and facilitate the discharge of water within the cracks.

5.Large deformation of diversion tunnels in Jinping II hydropower station

The maximum deformation of many sections after the primary support reached 0.5-0.7 m,which is 7.6%-10.6%of the radius oftunnel.Hoek and Brown(1980)and Barla(1995)have proposed assessment methods(see Table 4)of compressive deformation of rock mass based on empirical statistical data of large deformation of soft rocks.The method proposed by Hoek and Brown(1980)is adopted in the present study due to its advantage in classi f i cation.

Fig.7 presents a chart of percentage of compressive deformation in the zone of the diversion tunnels#1 and#2.For two tunnels,the sectional percentages of severe and extremely severe compressive deformation are up to 74.36%and 58.93%,respectively,while the ones of moderate compressive deformation are 23.08%and 37.5%, respectively.Therefore,excavation in chlorite schist stratum generated severe compressive deformation according to the method proposed by Hoek and Brown(1980).Insuf f i cient presupport and delay of support structure may not ef f i ciently control the development of plastic zone,and result in large deformation and even collapse.

Fig.5.Evolution of degradation ratios of elastic modulus and triaxial compressive strength with con f i ning pressure.(a)Degradation ratio of elastic modulus.(b) Degradation ratio of triaxial compressive strength.

Table 3Average shear strength parameters of dry and saturated samples.

Fig.6.Evolution of degradation ratio with the normal stress.

Table 4Assessment of compression extent of rock mass.

6.Reinforcement schemes of top section before excavating bottom section

Fig.7.Percentage of different levels of compressive deformation.

Tunnels#1 and#2 were excavated by drilling-and-blasting method and applied by reinforced concrete lining.After the excavation and introducing the support of the tunnel top sections inchlorite schist stratum,the stresses obtained in the anchors were considerably high at the chlorite formations,and some of the anchors may reach their design strength.If there is no more support, larger deformation may occur in the top section of surrounding rocks and primary support will lose vertical reinforcement function at the foot section.This may even induce collapse due to the loss of vertical reinforcement.Therefore,the support principle of the top section before excavating the bottom section is to keep the top section stable and control f l oor heave.

Fig.8.Layout of reinforcement schemes of tunnel bottom(unit:mm).

Table 5In situ stresses of surrounding rocks(MPa).

Two design schemes were accordingly proposed to control the deformation of top section before excavating bottom section(see Fig.8).The two schemes adopted anchor bar pile in advance at arch foot(3φ32 mm,L=9 m and@=1.0 m)and pre-stressed anchor at spandrel(φ32 mm,L=9 m,T=150 kN and@=1.5 m),whereφ,L,Tand@denote the diameter,length,pre-stress and spacing of anchors,respectively.Scheme 1 used downward pre-stressed anchor cable at side wall of central section(L=15 m,T=1000 kN and@=3.0 m),while scheme 2 used horizontal pre-stressed anchor cable at side wall of central section(L=15 m,T=1000 kN and@=3.0 m).The prediction of deformation was obtained using FLAC3Dmodels.The in situ stresses determined of surroundingrocks are listed in Table 5.The predicted deformations of the tunnel section after excavating the bottom section with two reinforcement schemes are shown in Fig.9 and Table 6.The deformation of surrounding rocks is 5-15 cm after the excavation of the tunnel bottom,and the distribution of deformation is anisotropic but follows an obvious law.The largest displacement occurs at the lower section of the side wall,and signi f i cant upheaval is observed at the side wall of right bottom and bottom plate,so immediate support is necessary to form a closed-loop system.The deformation of mid and top sections is smaller than the one of bottom section.Anchor bar pile in advance at arch foot is helpful for the stability of surrounding rocks.In this case,the lower section of the side wall can be reinforced and it plays an important role in the connection and support of the upper section arch.

The suitable anchor bar pile spacing is about 1.0 m.With the grouting pressure at the zone of cracked surrounding rock mass, pre-support stripe at the arch foot ensures the stability of temporary side wall at the bottom.Pre-stressed anchor and cable decrease the upward displacement induced by excavation of tunnel bottom section.The predicted results show that scheme 2 with horizontal arch cable is better than scheme 1.Therefore,scheme 2 was used to reinforce the top section at construction site(see Fig.10).The observational results after excavating tunnel bottom section reveal that the deformation of surrounding rock mass can be controlled within an acceptable level when considering scheme 2.

Fig.9.Deformation distribution under two reinforcement schemes(unit:mm).

Table 6The predicted deformations of the tunnel section after excavating the bottom section with two reinforcement schemes.

Fig.10.Scheme 2 at the construction site.(a)Anchor steel-stake in advance at arch foot.(b)Pre-stressed anchor and cable at mid part of side wall.

7.Conclusions

Laboratory tests on chlorite schist were carried out in order to understand the deformation distribution of diversion tunnels and to select a proper reinforcement scheme for the deep tunnels in Jinping II hydropower station crossing the chlorite soft rocks.The following conclusions could be drawn:

(1)Petrophysical tests show that chlorite schist has tight porous structure and low porosity,resulting in low porosity and low permeability.No hydrophilic expansion mineral was found and the expansibility of chlorite schist was not signi f i cant.

(2)Mechanical tests indicate that the triaxial compressive strength and elastic modulus increase with con f i ning pressure.The presence of water has a signi f i cant effect on the degradation instrength and the increase in deformation,thus a desirable con f i ning pressure can reduce the water-weakening effect and facilitate the discharge of water within the cracks.

(3)The distributions of compressive deformation based on empirical statistical data show that excavation in the formation of chlorite schist can generate large compressive deformation.The insuf f i cient pre-support and/or delay of support structure may not ef f i ciently control the development of plastic zone,resulting in large deformation and even collapse.

(4)Two reinforcement schemes of the top section excavation were proposed to control the deformation induced by the bottom excavation.Anchor bar pile in advance at arch foot is helpful for the stability of surrounding rocks.Scheme with horizontal arch cable is prior to the one with downward arch cable.

Con f l ict of interest

We wish to con fi rm that there are no known con fl icts of interest associated with this publication and there has been no signi fi cant fi nancial support for this work that could have in fl uenced its outcome.

Acknowledgment

The authors are grateful for f i nancial supports from the National Natural Science Foundation of China under Grant Nos.51009132, 10972221,10672167 and 41172288,and also the National Basic Research Program of China under Grant No.2014CB046902.

Barla G.Squeezing rocks in tunnels.ISRM News Journal 1995;3(4):44-9.

Clerici A.Engineering geological characterization of weak rocks:classi f i cation, sampling and testing.In:ISRM Symposium Eurock;1992.pp.179-82.

Dong FT,Song HW,Guo ZH,Lu SM,Liang SJ.Roadway support theory based on broken rock zone.Journal of China Coal Society 1994;19(1):22-32(in Chinese).

Fan QY.Discussions about determination of soft rock and critical depth of tunnels. Ground Pressure and Strata Control 1995;(Suppl.1):115-7(in Chinese).

Feng Y.Research on the tunnel support of soft rock in China.Ground Pressure and Strata Control 1990;7(2):1-5(in Chinese).

Guo Z.A study on the mechanical properties of the incompetent rocks.Journal of Engineering Geology 1996;4(3):79-84(in Chinese).

Han RG.New Austrian tunnelling method in underground engineering.Beijing: Science Press;1987(in Chinese).

He MC.Constitutive relationship for plastic dilatancy due to weak intercalations in rock masses.In:Proceedings of the 26th Annual Conference of the Engineering Group of the Geological Society.Rotterdam:A.A.Balkema;1994.pp.4173-80.

Hoek E,Brown ET.Underground excavations in rock.London:Institution of Mining and Metallurgy;1980.

Lin YL.The research on several theoretical problems about engineering mechanics of soft rock.Chinese Journal of Rock Mechanics and Engineering 1999;18(6): 690-3(in Chinese).

Nickmann M,Spaun G,Thuro K.Engineering geological classi f i cation of weak rocks. In:Proceedings of the 10th International Association for Engineering Geology and the Environment(IAEG)International Congress.Nottingham,United Kingdom:IAEG;2006.p.9.

Russo G.Some considerations on the applicability of major geomechanical classifi cations to weak and complex rocks in tunnelling.Geoingegneria Ambientale e Mineraria 1994;31(82):63-70.

Salamon MDG.Stability,instability and design of pillar workings.International Journal of Rock Mechanics and Mining Sciences&Geomechanics Abstracts 1970;7(6):613-31.

Sciotti M.Le formazioni rocciose tenere:Caratteri litologici,geologici e strutturali. In:Terzo Ciclo di Conferenze di Meccanica e Ingegneria delle rocce.Turin,Italy: Politecnico di Torino;1990.pp.1-18(in Italian).

Yoshinaka R,Tran TV,Osada M.Mechanical behavior of soft rocks under triaxial cyclic loading conditions.International Journal of Rock Mechanics and Mining Sciences 1997;34(3).354.e1-354.e14,http://dx.doi.org/10.1016/S1365-1609(97) 00243-8.

*Corresponding author.Tel.:+86 27 87197913.

E-mail address:hzhou@whrsm.ac.cn(H.Zhou).

Peer review under responsibility of Institute of Rock and Soil Mechanics,Chinese Academy of Sciences.

主站蜘蛛池模板: 亚洲精品大秀视频| 一区二区三区高清视频国产女人| 色综合天天综合| 高h视频在线| 亚洲第一在线播放| 成人免费一级片| 国产亚洲视频免费播放| 午夜国产理论| 欧美v在线| 精品亚洲欧美中文字幕在线看 | 亚洲AV电影不卡在线观看| 这里只有精品在线| 亚洲色图在线观看| 天天综合网亚洲网站| 欧美a在线| 国产精品毛片一区| 8090成人午夜精品| 久久一日本道色综合久久| 五月激情婷婷综合| 99成人在线观看| 中文字幕人妻无码系列第三区| 毛片在线播放网址| 久久国产精品波多野结衣| 综合色88| 亚洲国内精品自在自线官| 国产激情国语对白普通话| 国产精品99r8在线观看| 波多野结衣一区二区三视频| 国产成人综合亚洲欧洲色就色| 久久青草精品一区二区三区| 国内精自线i品一区202| 蜜臀AV在线播放| 极品国产一区二区三区| 中文字幕有乳无码| 亚洲无码高清一区二区| 一边摸一边做爽的视频17国产 | 国产大全韩国亚洲一区二区三区| 黄色成年视频| 久久综合AV免费观看| 欧美激情一区二区三区成人| 国产呦视频免费视频在线观看| www.91中文字幕| 国产在线观看精品| 免费人成又黄又爽的视频网站| 亚洲国产无码有码| 最新国产高清在线| 亚洲日韩在线满18点击进入| 国产高潮流白浆视频| 波多野结衣一区二区三区四区视频 | 欧美色视频日本| 亚洲AV无码一二区三区在线播放| 国产亚洲高清在线精品99| 97国产在线视频| 国内精品免费| 国产成人h在线观看网站站| 二级毛片免费观看全程| 色老二精品视频在线观看| 中文字幕久久亚洲一区| 亚洲中文字幕在线一区播放| 欧美h在线观看| 国产91视频免费观看| 18禁影院亚洲专区| 亚洲女同一区二区| 久久亚洲AⅤ无码精品午夜麻豆| 在线日本国产成人免费的| 99精品免费欧美成人小视频| 亚洲啪啪网| 亚洲综合精品香蕉久久网| 成年A级毛片| 无码中文AⅤ在线观看| 国产偷国产偷在线高清| 国产小视频网站| 米奇精品一区二区三区| 2021最新国产精品网站| 久久午夜夜伦鲁鲁片无码免费| 欧美成人精品在线| 欧美在线伊人| 99精品国产高清一区二区| 亚洲无码37.| 精品91视频| 国产精品毛片一区| 美女啪啪无遮挡|