Investigation of cost-effectiveness of highway asphalt pavement maintenance treatments based on rutting development analysis

2014-09-06 10:49:44LiHongmeiNiFujian
關(guān)鍵詞:瀝青路面效益措施

Li Hongmei Ni Fujian

(School of Transportation, Southeast University, Nanjing 210096, China)

?

Investigation of cost-effectiveness of highway asphalt pavement maintenance treatments based on rutting development analysis

Li Hongmei Ni Fujian

(School of Transportation, Southeast University, Nanjing 210096, China)

To investigate the cost-effectiveness of different maintenance treatments of highways in Jiangsu Province, the historical pavement maintenance records, traffic load information and pavement performance data in the pavement management system (PMS) are recorded and analyzed. Compared with the growth model, the linear model, the logarithm model and the exponential model, the cubic model has higher regression accuracyR2and it can capture the sigmoid shape of the deterioration curve. So it is selected to simulate the pavement rutting development. The benefit over cost ratio is calculated to quantify the treatment cost-effectiveness. The analysis results show that thin hot mix asphalt (HMA) overlays and micro surfacing are more cost-effective than the other two treatments on light and moderate traffic roads. Hot in-place recycling and thick HMA overlays have much longer service lives and greater cost-effectiveness under heavy or extra heavy traffic.

asphalt pavement; maintenance treatment; cumulative equivalent single axle loads; cubic model; cost-effectiveness

Asphalt pavements cover more than 85% of the highways built in China. Most of the highways in Jiangsu Province are semi-rigid base asphalt pavements and the pavement surface thickness varies from 16 to 20 cm. The pavement performance of highways deteriorates year by year under traffic loads[1]. Most of the highways in Jiangsu Province were built more than 10 years ago and stresses of various types and severity levels have affected the pavements.

The fundamental purpose of maintenance is to delay deterioration and major repairs. The cost-effectiveness of a pavement treatment can be defined as the relationship between the long-term cost of a pavement maintenance treatment over a given evaluation period and improvement in the serviceability of the pavement[2]. Several studies have been done to evaluate and define various methods for determining the cost-effectiveness of maintenance treatments[3-4].

Due to the lack of pavement conditions and traffic related data and analysis methods, limited findings of the pavement performance in China were attained in previous studies. Now detailed information of pavement structure, weather, environment, traffic, axle loads, performance detection and historical maintenance activities are recorded in the developed pavement management system (PMS) of Jiangsu Province. Moreover, various pavement maintenance treatments have been employed for a sufficient number of years. The actual performance and effects of those treatments can be observed. Therefore, it is urgent and of great importance that a thorough investigation is taken into the effectiveness of those maintenance treatments to provide effective and economic maintenance strategies.

1 Pavement Maintenance Information

1.1 Pavement maintenance treatments

Three widely used asphalt pavement treatments in Jiangsu Province are micro surfacing, hot mix asphalt (HMA) overlay, and hot in-place recycling (HIPR). Micro surfacing is a mixture of polymer-modified asphalt emulsion, fine aggregate, mineral filler, and water, uniformly spread over the pavement surface in one or two thin layers. The HMA overlay consists of 2 to 6 cm thick heated and mixed asphalt placed over the existing pavement surface. In this study, two typical thicknesses, 2.5 and 4 cm, are evaluated. Hot in-place recycling consists of heating, scarifying, mixing, placing, and compacting the upper layer of an existing asphalt pavement. Normally, 70% to 100% of the material in a mix is recycled in-place. Virgin aggregate, new asphalt binders, recycling agents, and/or new hot mix asphalt may be added as needed.

1.2 Traffic and loads

Due to the large variance of traffic and axle loads, the cumulative equivalent single axle loads (ESALs) is usually calculated to characterize traffic level based on measured traffic flow[5]. According to the Chinese specifications for design of highway asphalt pavement[6], asphalt pavements with different traffic levels can be classified based on cumulative ESAL repetitions of one lane in the design service life. Although the design life of highways in China is between 15 and 20 years, all the highways in Jiangsu Province have not reached their design lives yet. Using axle load data from weigh-in-motion (WIM) stations since the opening of different highways till 2012, cumulative ESALs were calculated. Tab.1 summarizes calculated cumulative ESALs until 2012 on highways included in the study, based on which the traffic levels of each highway can be identified.

Tab.1 Cumulative ESALs till 2012 and traffic levels of investigated highways

RoadnameRoadcodeDirectionPavementage/aLanenumberCumulativeESALs/(106times·lane-1)TrafficlevelYanJingS29NorthBound1022.66LightSouthBound1022.82LightNingXuS49NorthBound1124.72LightSouthBound11211.88ModerateLianXuG3WestBound11223.04HeavyEastBound11217.07HeavyXiGuangG2NorthBound13328.63HeavySouthBound13333.31ExtraheavyJingHuG2NorthBound12237.07ExtraheavySouthBound12276.47Extraheavy

1.3 Selection of performance indicators and thresholds

To evaluate treatment effectiveness, two pavement performance indicators including the international roughness index (IRI) and the rutting depth were selected[7]. Both IRI and rutting depth increase with time and usually upper performance thresholds are required to trigger pavement maintenance treatment. In this study, 15 mm rutting depth and 3 m/km IRI value were selected as the upper benefit cutoff values[8].

Accumulative ESALs is an important factor influencing pavement performance. Fig.1 shows relationships between pavement performance and accumulative ESALs in the initial six years for new constructed or rehabilitated highways with different traffic levels. It is noted that when rutting reaches the threshold value (15 mm) for heavy and extra heavy highway sections as shown in Figs.1(c) and (d), the IRI values generally remain much lower than the treatment triggering threshold (3 m/km). Thus, the rutting depth is a more critical performance indicator and will be adopted as a performance indicator in the following study.

(a)

(b)

(c)

(d)

2 Rutting Performance Models

Regression analysis can be used to predict future pavement deterioration based on abundant condition measurements data from the past. This method is simple and efficient when a large volume of data is available, and, thus, has been widely used in PMS. The traffic index of cumulative ESALs and pavement service time can both be used as influence factors for the regression model of the rutting depth. From the perspective of cost-effectiveness analysis of maintenance treatments, time has been selected as the independent variable to set the regression model of the rutting depth. By referring to previous research results[9], the linear model, the logarithm model, the cubic model, the exponential model and the growth model have been adopted for the regression analysis.

The do-nothing relationship defines the pavement performance over time that will be expected if no or only minor routine maintenance is conducted. The post-treatment relationship defines the pavement performance over time that will be expected if a treatment is applied. Fig.2 shows different regression model curves of the rutting depth of thick HMA overlays (4 cm) at the heavy traffic level. From the statistical analysis of abundant maintenance projects, for the model accuracy, the cubic model has the highest regression accuracyR2, followed by the growth model, the linear model, the logarithm model and the exponential model. In terms of regression accuracy and significance levels, the linear model, the growth model and the cubic model are all suitable for different pavement sections. Since the cubic model has the highestR2and is capable of capturing the sigmoid shape of the deterioration curve, it is selected to simulate the rutting development.

Fig.2 Pavement rutting depths under heavy traffic after the thick HMA overlays

3 Cost-Effectiveness Analysis

Typically, cost-effectiveness is expressed as a ratio of costs and benefits[2,10]. The costs are in terms of unit costs. Maintenance projects at different pavement sections are usually carried out in different years. In order to compare their costs, the present value is calculated to account for the effects of inflation.

(1)

whereCis the present value;Fis the future cost or current cost;iis the discount rate and the value can be adopted as 6% in China;nis the age of the maintenance project.

The benefits associated with the application of a maintenance treatment is based on the improvement in performance compared with that for the “do-nothing” alternative[2].

As shown in Fig.3, for a specific condition indicator, the benefits are determined by the difference in computed areas associated with the post-treatment performance indicator curve and the do-nothing curve.

Fig.3 Calculation of benefit area associated with increasing condition indicator

(2)

APT=∫x3-x10(U-EPT)dx-∫x2x1(U-EDN)dx

(3)

(4)

whereADNis the computed do-nothing area;APTis the computed post-treatment area;Uis the upper benefit cutoff value;EDNis the equation defining the do-nothing condition indicator relationship;EPTis equation defining the post-treatment condition indicator relationship;x1is the pavement age at treatment application;x2is the pavement age at which the do-nothing curve intersects the upper benefit cutoff value;x3is the overall post-treatment analysis period (in terms of pavement age);Bis the benefit.

4 Project Case Study

The historical maintenance projects conducted by the maintenance department of Jiangsu Province have been investigated. The do-nothing performance curve can be established by using the pavement condition data of the section adjacent to the maintenance section when the surface ages are available. Those adjacent pavement sections have the same base and subgrade, traffic and environmental conditions. By setting a threshold value of 15 mm, the service life of treatment can be determined based on the rutting performance models. All the maintenance costs were converted to the present worth in 2004 in this study.

Tab.2 and Fig.4 show that the characteristics of the benefit over cost ratio are quite different under different traffic levels. Due to the low cost, the benefit over cost ratios of thin HMA overlays and micro surfacing are higher than those by the other two treatments at light traffic level and moderate traffic level. Hot in-place recycling and thick HMA overlays have much longer service lives and greater cost-effectiveness under heavy or extra heavy traffic.

Tab.2 Results of cost-effectiveness analysis of different maintenance treatments

TreatmentmethodTrafficlevelApplytimeCost/(yuan·m-2)SamplesnumberServicelife/aBenefitBenefitovercostratioMicrosurfacingLight200431.5845.50.690.0219Moderate200530.2264.20.660.0218Heavy200431.8323.30.560.0176Extraheavy200432.0482.80.570.0178ThinHMAoverlay(2.5cm)Light200731.7166.00.740.0233Moderate200732.0205.50.810.0253Heavy200535.6203.60.600.0169Extraheavy200536.0503.10.610.0169ThickHMAoverlay(4cm)Light200743.2167.00.870.0201Moderate200743.5306.20.910.0209Heavy200547.5305.50.910.0192Extraheavy200548.01204.50.890.0185Hotin-placerecyclingLight200738.9286.50.810.0208Moderate200543.2305.60.820.0190Heavy200543.6305.00.830.0191Extraheavy200641.5304.20.840.0202

Fig.4 Benefit over cost ratios of maintenance treatment at different traffic levels

5 Conclusion

Three widely used asphalt pavement treatments in Jiangsu Province are micro surfacing, hot mix asphalt overlay, and hot in-place recycling. The rutting depth is a more critical pavement performance indicator and is used to determine the effectiveness of treatment. The cubic rutting model not only has higherR2, but can also capture the sigmoid shape of the deterioration curve. The cubic model has been selected to simulate the pavement rutting development.

In the cost-effectiveness analysis, the benefit over cost ratio is used as an index to quantify treatment cost-effectiveness. Thin HMA overlays and micro surfacing are more cost-effective than the other two treatments on light and moderate traffic roads. Hot in-place recycling and thick HMA overlays with much longer service lives have greater cost-effectiveness under heavy traffic or extra heavy traffic.

[1]Li J H, Luhr D R, Uhlmeyer J S, et al. Evaluation of maintenance effectiveness for WSDOT pavement network [C]//TransportationResearchBoard93rdAnnualMeeting. Washington DC, USA, 2014:3468-1-3468-17.

[2]Peshkin D G, Hoerner T E, Zimmerman K A. Optimal timing of pavement preventive maintenance treatment applications [R]. Washington DC, USA: Transportation Research Board, 2004: 19-33.

[3]Dong Q, Huang B S, Richards S, et al. Cost-effectiveness analyses of maintenance Treatments for low-and moderate-traffic asphalt pavements in Tennessee [J].JournalofTransportationEngineering, 2013, 139(8): 797-803.

[4]Mandapaka V, Basheer I, Sahasi K, et al. Mechanistic-empirical and life-cycle cost analysis for optimizing flexible pavement maintenance and rehabilitation [J].JournalofTransportationEngineering, 2012, 138(5): 625-633.

[5]Wang, K C P, Li Q, Hall K D, et al. Development of truck loading groups for the mechanistic-empirical pavement design guide [J].JournalofTransportationEngineering, 2011, 137(12): 855-862.

[6]Ministry of Transportation. JTG D50—2006 Specifications for design of highway asphalt pavement [S]. Beijing: People Transportation Publishing House, 2006. (in Chinese)

[7]Zeng J H, Xu J. Evaluation methods for breakdown condition of expressway asphalt concrete pavements [J].JournalofChangshaUniversityofScienceandTechnology:NaturalScience, 2009, 6(2): 18-22. (in Chinese)

[8]Zhou L, Ni F J, Zhao Y J. Impact of environment temperature and vehicle loading on rutting development in asphalt concrete pavement [J].JournalofHighwayandTransportationResearchandDevelopment, 2011, 28(3):42-47. (in Chinese)

[9]Fernando S A,Washington P N. Development of roughness prediction models for low-volume road networks in northeast Brazil [J].TransportationResearchRecord, 2011, 2205: 198-205.

[10]Dong Q, Huang B S. Evaluation of effectiveness and cost-effectiveness of asphalt pavement rehabilitations utilizing LTPP data [J].JournalofTransportationEngineering, 2012, 138(6): 681-689.

基于車轍發(fā)展分析的高速公路瀝青路面養(yǎng)護(hù)措施的費(fèi)用-效益研究

李紅梅 倪富健

(東南大學(xué)交通學(xué)院, 南京 210096)

為了調(diào)查江蘇省各種路面養(yǎng)護(hù)措施的費(fèi)用-效益,對(duì)路面管理系統(tǒng)的養(yǎng)護(hù)歷史資料、交通軸載信息、路面性能的數(shù)據(jù)進(jìn)行觀察和分析. 與增長(zhǎng)模型、線性模型、對(duì)數(shù)模型和指數(shù)模型相比,立方模型具有更高的回歸精度,能夠捕捉路面性能衰退曲線,因此采用立方模型來(lái)模擬路面車轍的發(fā)展. 計(jì)算效益費(fèi)用比來(lái)定量評(píng)價(jià)路面養(yǎng)護(hù)措施的費(fèi)用-效益. 研究結(jié)果表明,在中、低交通條件下,熱拌瀝青薄層罩面和微表處比其他養(yǎng)護(hù)措施的費(fèi)用-效益更大; 在重、特重交通高速公路上,熱再生和厚熱瀝青罩面具有更長(zhǎng)的使用壽命和更大的費(fèi)用-效益.

瀝青路面;養(yǎng)護(hù)措施;累計(jì)當(dāng)量單軸荷載;立方模型;費(fèi)用-效益

U416.217

The Science and Technology Project of Jiangsu Provincial Communications Department (No.7621000078).

:Li Hongmei, Ni Fujian.Investigation of cost-effectiveness of highway asphalt pavement maintenance treatments based on rutting development analysis[J].Journal of Southeast University (English Edition),2014,30(3):343-347.

10.3969/j.issn.1003-7985.2014.03.016

10.3969/j.issn.1003-7985.2014.03.016

Received 2013-11-29.

Biographies:Li Hongmei (1983—), female, graduate; Ni Fujian (corresponding author), male, doctor, professor, nifujian@gmail.com.


登錄APP查看全文

猜你喜歡
瀝青路面效益措施
草粉發(fā)酵 喂羊效益高
蓮魚混養(yǎng) 效益提高一倍
放養(yǎng)雞疾病防治八措施
高中數(shù)學(xué)解題中構(gòu)造法的應(yīng)用措施
瀝青路面養(yǎng)護(hù)的新工藝新方法探討
冬棚養(yǎng)蝦效益顯著,看技術(shù)達(dá)人如何手到“錢”來(lái)
果園有了“鵝幫工” 一舉多得效益好
減少豬相互打斗的措施
夏季豬熱應(yīng)激及其防治措施
廣東飼料(2016年5期)2016-12-01 03:43:23
基于Matlab的瀝青路面力學(xué)響應(yīng)分析
河南科技(2014年11期)2014-02-27 14:09:53
主站蜘蛛池模板: 亚洲精品中文字幕无乱码| 国产在线视频欧美亚综合| 伊人久久大线影院首页| 国产精品伦视频观看免费| 国产成人精品视频一区二区电影| 亚洲精品第一页不卡| 久久精品人人做人人爽电影蜜月 | 国产青青操| av在线手机播放| 亚洲精品手机在线| 欧美亚洲第一页| 欧美激情成人网| a级毛片免费看| 91福利片| 人妻21p大胆| 毛片久久网站小视频| 狠狠色噜噜狠狠狠狠色综合久| 国产综合另类小说色区色噜噜 | 国产人成在线视频| 在线精品亚洲一区二区古装| 天堂成人在线视频| 欧美亚洲一区二区三区在线| 国产色婷婷视频在线观看| 色亚洲成人| 欧美a在线看| 青青网在线国产| 亚洲一级毛片| 97视频精品全国在线观看| 美女被操黄色视频网站| 中文字幕一区二区人妻电影| 成人va亚洲va欧美天堂| 欧美日在线观看| 视频二区亚洲精品| 美女视频黄又黄又免费高清| 97视频在线精品国自产拍| 亚洲男人在线| 一级毛片免费不卡在线视频| 亚洲女同一区二区| www.99在线观看| h视频在线观看网站| 国产亚洲精品自在线| 国产成人精品视频一区视频二区| 色婷婷电影网| 国产农村1级毛片| 久久免费看片| 日韩在线网址| 国产毛片基地| 无码人中文字幕| 成人看片欧美一区二区| 国产91导航| 精品伊人久久久久7777人| 国产在线一区二区视频| 91无码人妻精品一区| 91人人妻人人做人人爽男同| 免费无码AV片在线观看中文| 麻豆精品在线| 国产第四页| 国产av色站网站| 日本福利视频网站| 亚洲成人一区二区三区| 伊人欧美在线| 亚洲一区二区约美女探花| 狠狠色综合网| 久久久久久久久久国产精品| 午夜福利网址| 亚洲香蕉伊综合在人在线| 成人在线综合| 国产精品三级专区| 亚洲高清资源| 91小视频在线观看免费版高清| 91精品国产91久久久久久三级| 国产女人在线| 伊人久久青草青青综合| 国产精品视频a| 99久久国产综合精品2023| 成人在线观看一区| 午夜影院a级片| 日韩精品毛片| 激情無極限的亚洲一区免费| 国产在线第二页| 国产毛片网站| 狠狠色丁香婷婷|