Research on Lead—time Compression of Inventory Integrating Remanufacturing and Manufacturing System for the IOT Environment

2015-10-21 19:39:14HanShu-Xian
科技致富向導 2015年6期

Han Shu-Xian

【Abstract】The lead time compression is the core of supply chain management with time competition and the powerful source of competitive advantage of supply chain.As an emerging technology,The Internet of things is a huge network which combined Various Information sensing device (such as RFID,infrared sensors,global position system,communication device,etc.)with internet.So it can improve information sharing,cut logistical operations time and reduce lead-time.Base on the assumption that the market demand forecast accuracy varies with lead-time,this paper will establish the inventory model of the remanufacturing/manufacturing system and give the optimization algorithms of this mode.Finally,the conclusion is validated through a numerical example,proved the practicability of the model in practice.

【Key words】Remanufacturing;inventory;Lead-time compression;Forecast;IOT cost

1.Introduction

The supplychain enterprises from traditional precedence competition mode transfer to time based competition (time-based competition, TBC)[1]model because of market competition increasing and clients requirements rapidly changing.If you need to shorten the time span of demand forecasting and improve the accuracy of it,then likely the best choice is IOT for the shortest amount of lead time. The key technology of the IOT provides a possible for supply chain enterprises to cut lead times.Among existing researches on lead time of R/M integrated supply chain recyclable product parts, some do not take lead time as a variable to study the effect of lead time on the supply chain and benefit of members; others do not think about cost squeeze in lead time and specific methods for shortening lead time. In this paper, based on the hypothesis that there exists linear relation between demand prediction accuracy and lead time, shorten lead time of recyclable products by using key technology of Internet of Things and consider cost of Internet of Things and lead time as variables to determine inventory optimization model of R/M integrated supply chain[2].

2.Model description

Mostoftheremanufacturingof recycled products is the remanufacturing of some partsand components of these products.After the recycled products are detected and demounted,the available parts and components are cleaned,renovated or upgraded,so as to restore to the new state,and this process is called the remanufacturing of parts and components,and such partsandcomponentsandcalled remanufactured parts and components.The products assembled with the remanufactured parts and components are called remanufactured parts.Because of uncertainty of the recyclable parts and components,when there are insufficient recyclable parts and components,itisneededtopurchasenewonesforreplacement.Theremanufactu

red parts and components and the new ones share a storagespace,therefore,theinventoryintegratingremanufacturingandmanufac

turingsystem is formed.

3.Basic hypothesis and symbols

Accordingtotheinventoryintegratingremanufacturingandmanufacturing

system given above,the single-variety partsandcomponents are considered, and it is assumed that:

(1)It is assumed that the time from order submission to the goods receiving is T,and T is the lead time of supplier,and the time of order submissioninthewarehouseisrecorded as 0.Itis assumed that the warehouse of available parts and components does not submit the order at the time of 0,but in a time point t(0

The market demand D is a random variable of normal distribution with mathematical expectation μ≡constant, and mean square error σ. Due to compression of lead time, the ordering time is delayed, the market information collected by the retailer more approximate to the sales season is more sufficient,so the forecast precision to the market demand is higher.RIFD technology is applied to compress the lead time of supply chain and improve the forecast of market demand.At t,the retailer can forecast that the density function of market demandXisf(x,t),distribution function is F(x,t),mathematical expectation μ and mean square error (i.e. forecast error)σ=σ+t,[4] in whichσ0is the forecasted mean square error at 0,σTis the forecasted mean square error at T,σT<σ0,i.e.the forecast accuracy is improve with the compression of lead time.

(2)It is assumed that the remanufactured parts and components and the new ones are of equivalent quality replacement without difference, but theprice of new components is higher than that of the remanufactured one, and each price is C0 higher.

(3)For the inventory cost, it is required to undertake the expense of key technical application of internet of things,so it is assumed that w is the unit cost of label of internet of things.

(4)h is the inventory storage fee of unit parts and components.

(5)CT is the total inventory cost.

主站蜘蛛池模板: 欧美日韩一区二区在线免费观看 | 久久亚洲国产最新网站| 精品一区二区无码av| 欧美五月婷婷| 99久久亚洲精品影院| 国产精品99久久久| 亚洲无线国产观看| 国产精品无码在线看| 欧美翘臀一区二区三区| 最新国产在线| 91人妻日韩人妻无码专区精品| 青青青视频91在线 | 成人国产精品网站在线看| a在线亚洲男人的天堂试看| 久久99热66这里只有精品一| 日本在线国产| 黄色免费在线网址| 55夜色66夜色国产精品视频| 亚洲AⅤ永久无码精品毛片| 免费高清毛片| 亚洲免费人成影院| 欧美高清日韩| 欧美日韩国产精品va| 四虎精品免费久久| 国产精品va| 伊人久久久久久久久久| 亚洲天堂久久久| 日韩无码黄色| 东京热av无码电影一区二区| 精品国产美女福到在线直播| 国产免费好大好硬视频| 亚洲高清资源| 狠狠综合久久久久综| 美女视频黄频a免费高清不卡| 久操中文在线| 一本大道香蕉中文日本不卡高清二区 | 欧美性爱精品一区二区三区| 久久夜夜视频| 欧美 国产 人人视频| 一级毛片在线免费视频| 欧美啪啪网| jizz在线免费播放| 亚洲床戏一区| 欧美日本激情| 国产精品手机在线观看你懂的| 在线观看欧美精品二区| 在线色综合| 欧美精品亚洲二区| 国产成人高精品免费视频| 美女一级毛片无遮挡内谢| 亚洲精品动漫| 在线中文字幕日韩| 国产欧美日韩va| 无套av在线| 色久综合在线| 亚洲精品视频网| 国产污视频在线观看| 亚洲国产精品无码久久一线| 婷婷综合缴情亚洲五月伊| 国产成人综合在线观看| 日韩欧美中文字幕一本| 试看120秒男女啪啪免费| 亚洲大尺码专区影院| 国产在线观看一区二区三区| 毛片最新网址| 麻豆a级片| 波多野结衣在线一区二区| 国产高清不卡视频| 欧美国产成人在线| 日韩国产高清无码| 91福利国产成人精品导航| 99久久精品视香蕉蕉| 一级毛片免费高清视频| 国产成人精品一区二区免费看京| 国产激情影院| 美美女高清毛片视频免费观看| 亚洲国产天堂在线观看| 精品视频第一页| 亚洲国产中文精品va在线播放| 国产高潮视频在线观看| 国产免费人成视频网| 亚洲视频在线青青|