Analysis on Variation and Workload Confirmation Transmission System Optimization Cases

2017-12-26 00:05:48李成寶黃俊
環球市場信息導報 2017年33期
關鍵詞:工程

◎李成寶 黃俊

Analysis on Variation and Workload Confirmation Transmission System Optimization Cases

◎李成寶 黃俊

A large foreign project, one of the world's largest LNG plant construction projects, 36 core process modules in construction with a total weight of 200,000 tons approximately, project duration started from July 2014 and will be completed in July 2017. The variation and workload confirmation transmission management system is established and implemented with exploration and innovation in this project, the author elaborated variation and workload confirmation transmission system by extraction of optimized cases in order to provide a practical reference for variation and workload confirmation management work in oil and gas module construction projects.

Preface

Due to the particularity of variation and workload confirmation work in this large foreign project, the author perform classification management to the variation and workload confirmation transmission system which is divided into discipline engineering and mechanical and electrical installation engineering according to bidding and contract awarding mode.

Variation and workload confirmation transmission system optimization case analysis

Variation confirmation transmission optimization case

Current transmission path: 1 variation submitted by subcontractors (with paper variation account)-2 PMT discipline engineers review and sign-3 PMT document control engineers sort-4 subcontractors document control engineers register, receive, sign, distribute, and transfer to PMT after its leader’s signature-5 PMT document control engineers register, receive, sign, distribute to module managers for signature and transfer to design department-6 design department document control engineers register, receive, sign, distribute and transfer to PMT after its leader’s signature -7 PMT document control engineers register, receive, sign and distribute to PMT discipline engineers-8 PMT discipline engineers review and signleaders approve

Optimized transmission path: 4 subcontractors document control engineers register, receive, sign, distribute and transfer to design department after its leader’s signature-5 design department document control engineers register, receive, sign, distribute and transfer to PMT after its leader’s signature-6 PMT document control engineers register, receive, sign and distribute to PMT discipline engineers-7 PMT discipline engineers submitted to module managers for signature, then PMT discipline engineers review and submitted to leaders for approval

Workload confirmation transmission optimization case

At the early period of this project, PMT designate department A responsible for subcontracting management of mechanical and electrical installation engineering and small structure bulk materials division and transmission. During the process of implementation, it was discovered that column internals, electric heat tracing were unable to be divided by discipline. Afterward it was determined that functional management department A responsible for electric heating and PMT construction department A responsible for column internals. Due to subcontracting contracts signing and site actual situation, special workload confirmation sheet increasingly but document control engineers cannot confirm transmission direction according to documents. Afterward it was determined that PMT discipline engineers to make special mark on account, this method can effectively avoid the probability of error, mistake, omit and others in the process of transmission. After optimization, it was concluded that functional management department A responsible for discipline engineering subcontracting management, electric heat tracing and special workload transmission and signing work. PMT construction department A responsible for subcontracting management of mechanical and electrical installation project, bulk materials, column internals transmission and signing work in order to ensure each discipline workload confirmation transmission in good order and synchronously with variation confirmation transmission.

Conclusion

After years of development, domestic project management theory has basically formed a unique project management system and project management personnel have adequate knowledge about project management knowledge system. The author devotes himself into the practice, innovation and implementation of variation and workload confirmation transmission management system, and this paper extracted two optimized cases to perform analysis in order to provide a reference only for variation and workload confirmation and management work in oil and gas module construction projects.

(作者單位:海洋石油工程(青島)有限公司)

猜你喜歡
工程
《工程爆破》》征稿征訂
工程爆破(2022年3期)2022-07-26 01:58:56
《工程爆破》征稿簡則
工程爆破(2022年2期)2022-06-17 14:13:56
子午工程
太空探索(2016年6期)2016-07-10 12:09:06
工程
工程
工程
工程
工程
工程
工程
主站蜘蛛池模板: 狠狠色狠狠色综合久久第一次| 人妻丰满熟妇啪啪| 亚洲 日韩 激情 无码 中出| 日韩国产亚洲一区二区在线观看| 色噜噜综合网| 热99re99首页精品亚洲五月天| 国产精品yjizz视频网一二区| 欧美激情一区二区三区成人| 色综合a怡红院怡红院首页| 男人的天堂久久精品激情| 日韩无码视频网站| 日韩成人在线一区二区| 国产一国产一有一级毛片视频| 国产在线视频自拍| 久热中文字幕在线观看| 精品第一国产综合精品Aⅴ| 欧美视频在线播放观看免费福利资源| 黄色网在线| 国产96在线 | 国产新AV天堂| 欧美日韩另类国产| 网友自拍视频精品区| 精品亚洲国产成人AV| 五月婷婷伊人网| 乱人伦视频中文字幕在线| 国产特级毛片| 色婷婷亚洲综合五月| 美女无遮挡免费网站| 亚洲中久无码永久在线观看软件| 亚洲美女操| 亚洲无码A视频在线| 欧美啪啪一区| 欧美 亚洲 日韩 国产| 国产精品免费p区| 国产伦精品一区二区三区视频优播| 亚洲嫩模喷白浆| 女同国产精品一区二区| 国产精品亚欧美一区二区 | 日韩东京热无码人妻| 国产性生大片免费观看性欧美| 欧美色图第一页| 手机在线看片不卡中文字幕| 国产成人精品视频一区二区电影| 国产精彩视频在线观看| 热伊人99re久久精品最新地| 91破解版在线亚洲| 久久婷婷色综合老司机| 精品欧美视频| 久久青青草原亚洲av无码| 亚洲综合极品香蕉久久网| 亚洲无码高清免费视频亚洲| 国产人碰人摸人爱免费视频| 国产精品天干天干在线观看| 高清久久精品亚洲日韩Av| 超薄丝袜足j国产在线视频| 波多野结衣二区| 欧美 亚洲 日韩 国产| 国产成人91精品免费网址在线| 欧美天堂在线| 青草视频久久| 国产九九精品视频| 欧美成人精品一区二区| 欧美成人二区| 丁香婷婷激情综合激情| 波多野结衣久久高清免费| 国产精品冒白浆免费视频| 狠狠操夜夜爽| 亚洲an第二区国产精品| 欧美精品亚洲精品日韩专区| 久久综合亚洲色一区二区三区| 国产簧片免费在线播放| 青青草原国产| 婷婷亚洲天堂| aaa国产一级毛片| 亚洲精品福利网站| 国产高潮流白浆视频| 啪啪免费视频一区二区| 少妇被粗大的猛烈进出免费视频| 性欧美精品xxxx| 视频二区亚洲精品| 欧美不卡在线视频| 色婷婷在线播放|