1 The main function of automation

1.1Data acquisition and processing

Intelligent substation automation system by interval layer the real time acquisition total analog, switch equipment、electrical measurement、synchronous phasor、 wave record signals、protection and other kinds of information; Through the intelligent interface device to collect other intelligent system of data.At the same time, should be able to establish real-time database, historical database, can constantly update from interval layer or process equipment all reliable real-time data and historical data are stored. Database should also facilitate the expansion and maintenance, generate database can modify online or offline.

1.2Remote function

1.2.1Remote content

Substation automation system should be able to through remote communication device control layer and multiple dispatch center at the same time EMS master station, communication automation system control center. Correct receiving、processing、dispatching center、set control center of the remote control command.According to "regulations of technology of power system dispatching automation design" and to meet the needs of each dispatching terminal, 500 kV intelligent substation tele-control information content is as follows:

(1)Telemetry content:500 kV/220 kV line active power,reactive power,current, voltage;500 kV/220 kV bus voltage and frequency;35 kV busbar voltage (or 66 kV);220 kV bus coupler,the piecewise current;Main transformer with three active power,reactive power,current;Low voltage reactor,capacitor reactive power,current;High pressure reactor reactive power,current;Main transformer tap position signal.

(2)Remote communication content:Total station accident total signal;All circuit breakers position signal; Related to the operation mode of isolating switch position signal; Reflect the operation state of the breaker grounding position signal;Total station unified clock synchronization system running state monitoring signal; Main transformer protection the signal;Reactive power compensation device protection action always signal; Main transformer on-load voltage regulation blocking signal; Total input/AVC remote control blocking signal;Main transformer tap remote (remote/local) signal; Remote control for low voltage reactive power compensation element(the distance/local) signal; All line main protection action signals; All lines reclosing action signal.

(3)Remote control content:The main transformer tap lifting;Reactive power compensation capacitor and reactor group for.

1.2.2Remote implementation

500 kV substation shall be carried out in accordance with the intelligent substation construction, total station set up a set of substation automation system, remote function into the system.Substation automation system according to the hierarchical distributed network structure, remote functions performed by layer stand accused of remote communication device. Substation tele-control information transmitted by remote communication device to the dispatching automation system,also through remote communication device to set control center, and accept of the remote control of the center for instructions.Protection substation and dispatching terminal,with the reliability of information transmission, remote communication device for double machine redundant configuration.

Substation automation system should possess, reactive voltage automatic control software by remote communication device receives the scheduling of the automatic voltage control command, the interval of the substation automation system layer of measure-control device of main transformer tap and reactive power compensation capacitor and reactor group for control, and satisfy the AVC distance/on-site safety lockout condition.

2 Automation system configuration

Station generally, the ring can be used to control layer network topology and a star topology structure.Ring network reliability is higher than the star, but through the dual redundancy configuration, star dual network reliability is greatly improved, can meet the engineering requirements. Star network real time better than the ring, and extend more easily, as long as the reserve enough at central switch portscan be extended.Star structure in operational maintenance,transmission time, extension performance is better than that of ring structure, and through redundancy configuration method can improve the reliability of the star network. So intelligent substation control layer network selects the double star topology.

Process layer network includes chicago-brewed GOOSE and sampling value networks, sampling value network's main function is to realize the current, voltage of ac sampling values to upload;Chicago-brewed GOOSE network's main function is to realize the switch of upload and switching control, prevent false atresia, etc.Therefore, combining with the relay protection design, automation chicago-brewed GOOSE and sampling value networks respectively by star Ethernet network independently, below is no longer here.

2.1Stand accused of layer configuration

Stand accused of layer equipment including host, operator stations, engineer station and remote communication device,synchronous phasor information forwarding device, network communication record analysis system, and other intelligent interface equipment, etc.

2.1.1Collection and storage server

Stand accused of a host for the interval layer data acquisition, processing, storage, and other various tasks, is the core of the substation automation system, so the host should use multicore servers, its performance should be able to meet the functional requirements of the whole system, the host of processing power, storage capacity should be adapted to substation planning capacity.Intelligent substation automation system with double redundancy configuration, double function of automatic uniform distribution load, single machine failure, the other one with full load. At the same time,also should have the hardware equipment and software task module run since the monitoring function.

2.1.2The operator station

Operator station is the main interface of substation automation system, shall meet the operation personnel operation intuitive, convenient, safe and reliable, therefore can only substation adopts full graphics operator workstations, each operator workstation supports dual LCD monitor, to the sound card simultaneously, speakers and other audio alarm device.

2.1.3The engineer station

Engineer station substation automation system is the main interface contact professional maintenance staff, including all function of operator station and maintenance, development capabilities, a single set of configuration.Hardware compatibility, the engineer workstation equal to operator workstation according to specifications, but one like screen requirements.

2.1.4Remote communication device

Remote communication device by stand accused of Ethernet to collect real-time data from the interval layer directly, the capacity and performance indicators should be able to meet the requirements of substation remote specification and function transformation, all information through remote communication device in different requirements to the dispatching control center and set the main transmission. Ensure the reliability of the real-time information transmission, remote communication device for double set of configuration.

Scheduling side EMS system and the main control center automation system modeling, according to the IEC61970 standard IEC61850 substation automation system is used standard modeling, because of the IEC61850 and IEC61970 standard model interchange technology standard has not been formed, therefore suggested that the remote communication devices are still through the IEC60870-5-101 or 104 specifications with the main communication.

2.1.5Synchronous phasor information forwarding device

Synchronous phasor information forwarding device adopts embedded devices, through a separate network phasor data acquisition interval layer - PMU - 2 device, and through the dispatching data network communicate with WAMS master station control system, at the same time for advanced application functions to realize automation system stands accused of layer to provide dynamic data. Intelligent substation synchronous phasor information forwarding devices to a single set of configuration.

2.1.6Network communication record analysis system

Substation automation system still need to configure the network correspondence analysis system.Communication through the network recorder real-time monitoring, recording MMS network, chicago-brewed GOOSE network, sampling value network communication message, periodic save to file. At the same time set up network communication message at stand accused of layer analysis device to analyze network traffic,the condition of the port. Network traffic analysis device for a single set of configuration.

2.2Spacer layer configuration

Spacer layer equipment including measurement device and other intelligent interface equipment, etc.Measurement and control device in accordance with the DL/T860 or IEC 61850 standard modeling, self-describing has perfect function,and stands accused of direct communication equipment.Supported by chicago-brewed GOOSE packet interval layer five united locking function, supported by chicago-brewed GOOSE message downward equipment operation.Due to a connection mode for 3/2 form, 500 kV voltage class is not recommended to protect and control one device; 35 kV (or 66 kV) with measurement, measurement, control, integrated protection device.

220 kV voltage class for double busbar connection mode,recommendation 220 kV unity USES the protection measure and control device, it is completely feasible in technology,and can save half of the hardware device. Bao, one another advantage is can save the process of measurement and control device layer port.According to the way interval layer configuration process switches, will not affect the switch stations,increased the standby port number.Using the unity of 220 kV protection measurement and control scheme, and control the corresponding double configuration of layers A and B network access process respectively. Under normal circumstances,access to A network measurement and control device of the background communication information and automation system,access network measurement and control device B data is locked. When A measurement and control device failure,switch to the measurement and control device B.

Reference:

[1]Study of robustness of filamentous bacteriophages for industrial applications,Biotechnology and Bioengineering,2011,108(6):1468-1472.

[2]Electric Power Systems Cyber Security:Power Substation Case Study,Subgroup Security.Briefing Paper European Workshop on Industrial Computer Systems Technical Committee Reliability,Safety,Security,2006,22(2):223-228.

[3]Hart DG.Using AMI to realize the smart grid[C].Power and Energy Society General Meeting-Conversion and Delivery of Electrical Energy in the 21st Century,Pittsburgh,Petnnsylvania,USA,2008.

Intelligent Substation Automation Configuration is Analysed

Wu Peng
(Inner Mongolia Energy Construction Investment (Group) Co., Ltd., Huhehaote Neimenggu 010000)[A1]

Intelligent substation automation system by interval layer the real time acquisition total analog, switch equipment, electrical measurement,synchronous phasor, wave record signals, protection and other kinds of information. And through the intelligent interface device of data collection and other intelligent system.This article mainly starts with the basic design of intelligent substation, through the introduction of the related network layout of intelligent substation, agreement, thus raises the network distribution, basic function realization, main content. Speak in flow process and the internal cover separate analysis has been done for the related function modules, and some matters needing attention.

Intelligent substation;automation;The main function;configuration

鄔鵬(1985—),男,內蒙古烏海人,工程碩士,畢業于內蒙古工業大學,工程師,研究方向:機械和電氣部分。

猜你喜歡
變電站智能
智能制造 反思與期望
智能前沿
文苑(2018年23期)2018-12-14 01:06:06
智能前沿
文苑(2018年19期)2018-11-09 01:30:14
智能前沿
文苑(2018年17期)2018-11-09 01:29:26
智能前沿
文苑(2018年21期)2018-11-09 01:22:32
智能制造·AI未來
商周刊(2018年18期)2018-09-21 09:14:46
關于變電站五防閉鎖裝置的探討
電子制作(2018年8期)2018-06-26 06:43:34
超高壓變電站運行管理模式探討
電子制作(2017年8期)2017-06-05 09:36:15
220kV戶外變電站接地網的實用設計
變電站,城市中“無害”的鄰居
河南電力(2015年5期)2015-06-08 06:01:45
主站蜘蛛池模板: 热这里只有精品国产热门精品| 日本午夜三级| 午夜电影在线观看国产1区| 超级碰免费视频91| 日韩资源站| av手机版在线播放| 欧美一级高清视频在线播放| 欧美亚洲激情| 国产中文一区a级毛片视频| 国产精品香蕉在线观看不卡| 日韩国产综合精选| 国产精品美乳| 国产美女丝袜高潮| 亚洲第一成年网| 欧美爱爱网| 亚洲无码视频图片| 国外欧美一区另类中文字幕| 黄色网站不卡无码| 伊人狠狠丁香婷婷综合色| 成人国产小视频| 亚洲日韩欧美在线观看| 成人无码一区二区三区视频在线观看| 欧美色伊人| 99热这里只有精品国产99| 亚洲视频无码| 国产三级a| 97超爽成人免费视频在线播放| 91久久性奴调教国产免费| 国产日韩欧美视频| 亚洲欧美极品| 欧美日韩一区二区三区在线视频| 亚洲国产精品日韩av专区| 99999久久久久久亚洲| a在线亚洲男人的天堂试看| 国产主播在线一区| 伦伦影院精品一区| 97国内精品久久久久不卡| 免费人成网站在线高清| 欧美午夜小视频| 国精品91人妻无码一区二区三区| 四虎国产在线观看| 欧美亚洲日韩中文| 国内精自视频品线一二区| 国产在线无码一区二区三区| 亚洲AV免费一区二区三区| 久久黄色一级视频| 欧美伦理一区| 欧美日韩午夜| 国产高清在线丝袜精品一区| 欧美笫一页| 久久频这里精品99香蕉久网址| 999国产精品永久免费视频精品久久 | 国产免费精彩视频| 青青草一区二区免费精品| 91av国产在线| 精品视频第一页| 国产精品乱偷免费视频| 在线免费a视频| 国产精品无码一二三视频| 亚洲有无码中文网| 国产丰满大乳无码免费播放| 亚洲av无码片一区二区三区| 久久精品一卡日本电影| a毛片基地免费大全| 日韩成人午夜| 国产swag在线观看| 成人精品视频一区二区在线 | 2021天堂在线亚洲精品专区| 日韩精品一区二区三区免费在线观看| 深爱婷婷激情网| 国产成人三级在线观看视频| 中文天堂在线视频| 天堂岛国av无码免费无禁网站| 青青久视频| 在线不卡免费视频| 爱做久久久久久| 欧美一道本| 成年人国产视频| 蜜芽国产尤物av尤物在线看| 亚洲成在线观看 | 日本不卡视频在线| 不卡无码h在线观看|