摘要:進(jìn)入二十一世紀(jì)后,通信工程得到了快速的發(fā)展,給人們的生活帶來了巨大的便利。通信工程的發(fā)展標(biāo)志這人類文明有上了一個(gè)新的臺階,可以使人們更多日常需求得到快速實(shí)現(xiàn),但是,時(shí)代在快速的發(fā)展和進(jìn)步,人們的物質(zhì)和精神需求要越來越難以滿足,所以,必須對通信工程項(xiàng)目進(jìn)行一些改進(jìn),才能適應(yīng)時(shí)代發(fā)展的潮流,才能滿足人們不斷上升的需求標(biāo)準(zhǔn)。
關(guān)鍵詞:網(wǎng)絡(luò)優(yōu)化;通信工程;項(xiàng)目
Abstract: after entering the twenty-first Century, communication engineering has developed rapidly, and has brought great convenience to people's lives. The development of communication engineering is a sign that human civilization has a new step, which can make people more and more daily needs to be realized quickly. However, in the rapid development and progress of the times, the material and spiritual needs of people are more and more difficult to meet. Therefore, it is necessary to make some improvements to the project of communication engineering to adapt to it. The trend of the times can satisfy people's rising demand standards.Key words: network optimization; communication engineering; project
1 通信工程的特點(diǎn)
1.1 工期緊迫
通信工程項(xiàng)目落實(shí)的過程中需要對諸多不同的通信線路予以布設(shè),這使得工作量較大,隨著工作時(shí)間的不斷增長,通信工程的應(yīng)用將持續(xù)被延后,相應(yīng)的通信工程所創(chuàng)造的經(jīng)濟(jì)效益就會被減少。所以,為了盡快的使通信工程能夠發(fā)揮作用,滿足人們的應(yīng)用需求,創(chuàng)造較高的經(jīng)濟(jì)效益,工程建設(shè)所定制的工期較短,相應(yīng)的整個(gè)通信工程推進(jìn)就顯得尤為緊迫。
1.2 通信工程建設(shè)存在諸多不確定因素
通信工程結(jié)構(gòu)是非常復(fù)雜的,在具體進(jìn)行工程建設(shè)的過程中需要技術(shù)人員嚴(yán)格按照技術(shù)標(biāo)準(zhǔn)來展開作業(yè),但是很多時(shí)候還是不可避免的遭受到各種因素的影響,如環(huán)境、人員、施工、線路布設(shè)等,導(dǎo)致通信工程建設(shè)效果不佳。所以說,通信工程建設(shè)存在諸多不確定因素?zé)o可厚非。
1.3 通信工程的需求呈現(xiàn)出多樣化的特點(diǎn)
與一般的建筑工程相比,通信工程具有廣泛的施工特點(diǎn)。在實(shí)際施工中,不僅要準(zhǔn)備視覺特性,還要綜合考慮通信系統(tǒng)的各種特性。這就使得相關(guān)技術(shù)人員從不同角度考慮通信工程應(yīng)用的需要,進(jìn)而有了針頭。性傳播工程的建設(shè)。從這個(gè)角度看,通信工程也具有多樣化需求的特點(diǎn)。
2通信工程建設(shè)中的問題分析
1成本問題。工程建設(shè)中如果不嚴(yán)格控制造價(jià),項(xiàng)目完成后,工程造價(jià)會嚴(yán)重超標(biāo)。因此,在通信工程建設(shè)過程中應(yīng)建立專門的工程造價(jià)風(fēng)控組,整個(gè)工程的輸出成本應(yīng)由集團(tuán)控制。首先,對工程項(xiàng)目所需材料的成本進(jìn)行詳細(xì)的預(yù)算,在保證材料質(zhì)量的前提下,盡可能地控制材料成本預(yù)算。然后,對項(xiàng)目工程過程中一些不確定事件的成本預(yù)算,包括項(xiàng)目質(zhì)量的非標(biāo)準(zhǔn)細(xì)粒度和事故補(bǔ)償,應(yīng)事先計(jì)算,以避免項(xiàng)目成本預(yù)算超支。2質(zhì)量問題。質(zhì)量問題是通信工程建設(shè)中的一個(gè)致命問題。因此,在通信工程建設(shè)過程中,要嚴(yán)格控制工程質(zhì)量,保證工程質(zhì)量。保證質(zhì)量主要從以下幾個(gè)方面著手:一是嚴(yán)格控制施工材料的質(zhì)量和施工材料的質(zhì)量,是保證施工質(zhì)量的基礎(chǔ),所以材料的質(zhì)量應(yīng)該是嚴(yán)格管理。二是加強(qiáng)了施工隊(duì)伍的施工質(zhì)量監(jiān)督,使施工隊(duì)伍的水平和態(tài)度都落到工程上。質(zhì)量起著決定性作用,應(yīng)加強(qiáng)日常施工管理,避免一些施工隊(duì)伍加快施工進(jìn)度,放寬質(zhì)量要求;三、充分發(fā)揮第三方監(jiān)理的作用,通過第三方的專業(yè)超高壓項(xiàng)目的每一部分和重型工程節(jié)點(diǎn)都保證了質(zhì)量檢驗(yàn)。確定了整個(gè)工程的施工質(zhì)量。
3 通信工程項(xiàng)目中網(wǎng)絡(luò)優(yōu)化的應(yīng)用
3.1 通信工程網(wǎng)絡(luò)圖設(shè)計(jì)的優(yōu)化
良好的建設(shè)通信工程,網(wǎng)絡(luò)圖的良好設(shè)計(jì)是非常必要的。而通信工程建設(shè)具有多樣性的特點(diǎn),這使得的不同情況下的通信線路不盡相同,相應(yīng)的網(wǎng)絡(luò)圖設(shè)計(jì)中應(yīng)當(dāng)注意準(zhǔn)確區(qū)分不同通信線路。而在實(shí)際的網(wǎng)絡(luò)圖設(shè)計(jì)中,常常會因考慮不周或其他因素影響,導(dǎo)致網(wǎng)絡(luò)圖與實(shí)際不符。而將網(wǎng)絡(luò)優(yōu)化技術(shù)有效應(yīng)用于網(wǎng)絡(luò)圖設(shè)計(jì)中,則可以將雙代號的網(wǎng)絡(luò)圖形式應(yīng)用于網(wǎng)絡(luò)圖設(shè)計(jì)之中,合理不同代號的箭頭、節(jié)點(diǎn)等來繪制通信線路,可以準(zhǔn)確區(qū)分不同通信線路,提高網(wǎng)絡(luò)圖的有效性。另外,需要特別說明的是提高雙代號的網(wǎng)絡(luò)圖形式的應(yīng)用效果,注意遵循統(tǒng)一的準(zhǔn)則,確定雙代號的邏輯關(guān)系,以便合理運(yùn)用不同代號設(shè)計(jì)網(wǎng)絡(luò)圖。
3.2 引入資源優(yōu)化的方式
資源的優(yōu)化主要是強(qiáng)調(diào)所有的設(shè)備、材料、資金、人員等相關(guān)資源在項(xiàng)目中發(fā)揮其最大的優(yōu)勢在使用。在優(yōu)化過程中,應(yīng)將網(wǎng)絡(luò)規(guī)劃技術(shù)融入其中。根據(jù)項(xiàng)目的資源基礎(chǔ),對資源的具體信息和優(yōu)化效果進(jìn)行描述,然后根據(jù)網(wǎng)絡(luò)計(jì)劃的要求合理分配資源。具體的優(yōu)化方法體現(xiàn)在以下幾個(gè)方面:一是為了合理安排時(shí)間,如果某一階段需要的資源太多,就要適當(dāng)調(diào)整計(jì)劃。在工程進(jìn)度上,資源的供給是不能滿足的。當(dāng)?shù)R時(shí),我們必須調(diào)整計(jì)劃。
3.3 投資成本的優(yōu)化
通信工程建設(shè)的投資成本非常大。為了提高市場競爭力,節(jié)約投資企業(yè)的資本產(chǎn)出,必須采取一系列的投資控制措施。投資成本控制有利于降低投資者在項(xiàng)目運(yùn)作過程中的風(fēng)險(xiǎn)。成本控制主要通過網(wǎng)絡(luò)設(shè)計(jì)方法的選擇來實(shí)現(xiàn)。由于施工路線的不同和施工方法的不同,可以產(chǎn)生不同的工程造價(jià)。有必要對現(xiàn)場施工現(xiàn)場進(jìn)行實(shí)地調(diào)查,驗(yàn)證線路施工的復(fù)雜性,以便弄清不同線路的不同造價(jià),然后做出最佳選擇。
3.4 工程進(jìn)度的優(yōu)化
通信工程項(xiàng)目開工后,應(yīng)嚴(yán)格控制施工進(jìn)度,在保證工程質(zhì)量的前提下盡快完成工程。對工程進(jìn)度的優(yōu)化可以從以下幾個(gè)方面著手:一是合理安排施工人員,確保各工程環(huán)節(jié)的人力資源充足;二是提前選擇一些工程難點(diǎn),避免大工程;這些工程困難對工程進(jìn)度的影響。
結(jié)論
總之,通信工程項(xiàng)目的優(yōu)化和發(fā)展是全社會的共同需求,網(wǎng)絡(luò)優(yōu)化技術(shù)將在通信工程的發(fā)展和完善過程中得到應(yīng)用。在工程建設(shè)中,應(yīng)將工程網(wǎng)絡(luò)優(yōu)化的重要性確定為相應(yīng)的技術(shù)操作人員。同時(shí),也要進(jìn)行通信工程的建設(shè)和運(yùn)輸。在了解通信工程網(wǎng)絡(luò)優(yōu)化的重要意義的基礎(chǔ)上,通過應(yīng)用工程建設(shè)團(tuán)隊(duì),可以促進(jìn)通信工程項(xiàng)目的發(fā)展,提高網(wǎng)絡(luò)技術(shù)的應(yīng)用水平。優(yōu)秀的管理手段,使我國的通信系統(tǒng)對社會起到更大的推動(dòng)作用。
參考文獻(xiàn):
[1]何鵬.通信工程項(xiàng)目中的網(wǎng)絡(luò)優(yōu)化技術(shù)研究[J].無線互聯(lián)科技,2015,03:1-2.
[2]曾尋.談通信工程項(xiàng)目的網(wǎng)絡(luò)優(yōu)化方法[J].黑龍江科技信息,2015,24:27.
[3]陳思茹.通信工程項(xiàng)目中的網(wǎng)絡(luò)優(yōu)化技術(shù)研究[J].電子世界,2016,07:72-73.