論那新水電站項目建設管理

2016-04-29 00:00:00黃宗琦
文化產業 2016年2期

摘 要:中小型水電站建設設計地域復雜,然其需要協調、完善的事項不亞于中大型水電站建設。而且在項目建設過程中能得到有關部門的支持力度又遠遠趕不上中大型水利項目,因此,在中小型水電站項目建設的勘察設計、前期報審(批)、參建各方的選擇及合同的文本條款落實方面更要高度重視。本文從參與那新水電站的建設全過程對以上各方面的工作進行論述,希望能給類似水電站項目帶來借鑒。

關鍵詞:水電站;設計;審查;合同

Naxin hydropower station is the guangxi water conservancy electric power group co., LTD., holding a small and medium-sized hydropower station under construction, is located in baise tianlin anding town, construction since March 2009.Project owner first China gezhouba group co., LTD., and subsequent China railway 19th bureau group co., LTD., is from the guangxi liuzhou water conservancy electric power survey design institute, the supervisor is nanning in guangxi xijiang engineering construction supervision co., LTD.Hydropower station construction industry sectors involved, hydrology, geology, surveying, civil engineering, electrical, manufacturing processing, gold and other professional, is intricate, project construction management and coordination work.So effective measures should be taken in the process of construction management and in place of management, to ensure the smooth construction of the project.But overall, hydroelectric project construction has its regularity, there are common places.

A, select the excellent design, strengthen communication and contact with work

Design is a leading, design development and construction of hydropower station is very important, will directly affect the investment and the progress of the project.If the designer design level is high, the ability to design, work done is in place and in-depth, late of the project construction will be carried out smoothly, the owner side will also save trouble is much, so choose a good design units is critical.But at the moment, I group of hydropower station project design is facing the status quo: country and the area of water conservancy construction project, the design market of porridge more monk less, many are willing to accept from the large investment, short construction period and project with quick results. The purpose is very clear, that is earn more quickly to save money.For the project that lead group level, based on some political factors, and often time they order.Lead to design level, depth is not in place, greatly affected the project construction period, the investment increase.

In the case of actual construction management and how to operate, as the owner of project management personnel must be familiar with design drawings and the site of the project, to found in the construction and the original design drawing is not consistent place and can also be optimized place should be timely communication with site design on behalf of the even design institute, strive to design and construction optimization, more reasonable.At the same time we will strictly in accordance with the relevant hydropower project construction and management of the group to make design changes in a process in a timely manner, so as not to delay the construction period.And will pay special attention to the design drawings if supply with the construction schedule requirements, don't lag because of drawing influence construction progress and result in disputes in the future to the contractor when processing, sent people to design institute tracking urged when necessary.

Second, to prepare for project approval according to regulation and in accordance with the prior approval

Hydroelectric project before the formal construction, according to the state's relevant laws and regulations to deal with relevant formalities, if not in time for the examination and approval of the work, will influence the project construction period and increase the cost of project construction.If not approval according to the requirements of the national review, the project will not be able to legally exist, upon investigation, not only to extend the time limit, and the cost will increase a lot, also affects the owner party's credibility.According to relevant data show that the guangxi region has a lot of small and medium-sized hydropower station at the time of the specific construction procedures are more or less in the environment lacking, once under the background of this project with mass resistance or security, and other events, the lack of procedures and formalities will give project to great trouble, and will be due to the lack of procedure missed the best opportunity to solve the contradiction.Naxin hydropower station is a good example, while with the permission of the local government held the opening ceremony and smooth construction, but have no reason to no basis of resistance and plant procedures complete question put forward by the masses, we are wrong.In things well to control the phase to was not dealt with in a timely manner, in place we miss the best time to stay procedures and complete later due to the transition, promote transfer of government leaders, delay, resulting in more than two years of resistance, cause huge direct and indirect economic losses.According to the provisions of the department of water administration under the state, approval and inspection procedures for hydropower station mainly include: first, the project feasibility report must be based on size approved by the national or provincial, municipal development and reform commission of consultancy review, after review requirements, project to project;Second, once approved, the project should be timely and relevant qualified units, please do the eia, water conservation, geological disaster assessment, reconnaissance and bound, forest land, mineral resources evaluation of cover, and put forward related project report, submitted to the relevant departments to review;Related project approval review is completed, timely report to related department for project approval, and the follow-up work developed as soon as possible.

Three, discreet choice supervision unit, strictly carry out the supervision contract

Words can be summarized the supervision in the whole process and its importance in the project construction: investment, quality, safety and schedule of four control;Two contract and information management;Coordinating the relationship between the owner and contractor.Can choose a good supervision units, the supervisor in the site of the project supervision personnel how will directly affect the quality of project construction.So choose the project supervising units is critical, not some people said the project supervision is just a form, because it is not a problem, a problem will bring great disputes.Another in the project construction process, the property management must also be accordance with the requirements of the contract strictly supervision supervision, must rely on the former must be in at the scene, be sure to eat at the scene, be sure to work in the field.Key parts working procedure such as topographic survey is really there, casting concrete is prepared to supervise, measurement of quantities are true, the quality of the periodic inspection and acceptance of the work whether, in accordance with requirements of key controls are the owners need.Other aspects such as supervision log must adhere to write;A contractor, owner side, side work regularly meeting;Monthly safety inspection;Month progress payment accounting of funds should firmly carry out, in order to solve various problems arising from the construction, promote the construction of the project.

Four, strictly in accordance with the terms of the contract for construction management

In general, the main points of the construction management is: be familiar with the contract conditions, want to have a forward thinking and global concept, timely and cooperated-builing parties to solve various problems in the process of construction, the process monitoring and process control.In the process of the specific management, due to the contractor is the key to the construction projects subject to project can be completed as scheduled work mainly is to look at the contractor's construction organization.So after signing the contract, the construction management is particularly important.It is a long, hard work, the owner according to contract frequently with shareholders, the designer, contractor, supervision party, coordinating the relationship in a timely manner to solve the problem in the management process.In addition, in the process of project construction management, the owner can not acting the eldest brother, think that the contractor and the supervisor or even design is working for me, this will lead to all sorts of relationship misconduct or mismanagement and passive.To know cooperated-builing parties after signing the contract, it is a kind of equal relations with the owner.So the party should change ideas, positioned, real communication, coordination and service work.

All in all, hydroelectric project construction management is a complicated system engineering, from the date of the project, will be according to the overall goal of the project, careful and meticulous construction plan;The correct configuration of various resources, timely and effectively communicate with cooperated-builing parties;In the process of project construction, strict management and control should be based on contract, to ensure smooth as planned to complete the project construction tasks.

主站蜘蛛池模板: 亚洲精品无码AV电影在线播放| 国产精品久久久久久影院| 2020久久国产综合精品swag| 国产精品免费福利久久播放 | 九九热视频精品在线| 国产香蕉97碰碰视频VA碰碰看| 亚洲国产精品无码AV| 中文字幕啪啪| 国产欧美高清| 国产尤物jk自慰制服喷水| 久久国产精品麻豆系列| 国产对白刺激真实精品91| 婷婷成人综合| 无码福利视频| 色综合天天视频在线观看| 国产精品一区在线观看你懂的| 露脸国产精品自产在线播| 国产在线专区| 日韩国产亚洲一区二区在线观看 | 亚洲午夜国产精品无卡| 欧美性色综合网| 免费一级毛片在线播放傲雪网| 亚洲国产精品不卡在线| 人人澡人人爽欧美一区| 3p叠罗汉国产精品久久| 尤物亚洲最大AV无码网站| 一本大道东京热无码av | 99伊人精品| 免费在线国产一区二区三区精品| 试看120秒男女啪啪免费| 午夜国产小视频| 国产麻豆va精品视频| 欧美日韩中文国产| 精品少妇人妻无码久久| 国内丰满少妇猛烈精品播| 不卡午夜视频| 国产福利拍拍拍| 欧美不卡视频一区发布| 欧美成人午夜视频| 国产欧美另类| 国产亚洲成AⅤ人片在线观看| 亚洲无码视频一区二区三区| 中国国语毛片免费观看视频| 午夜一级做a爰片久久毛片| 成色7777精品在线| 午夜爽爽视频| 亚洲天堂久久新| 欧美在线视频不卡| 欧美日韩国产高清一区二区三区| 久久窝窝国产精品午夜看片| 国产av一码二码三码无码| 午夜不卡视频| 国产乱人视频免费观看| 久久中文电影| 国产精品久久久久久久久久久久| 亚洲欧美在线看片AI| 国产精品尤物在线| 精品国产自在在线在线观看| 亚洲人成影院在线观看| 欧美日韩北条麻妃一区二区| 国内精品自在自线视频香蕉| 亚洲欧洲天堂色AV| 欧美日韩另类在线| 这里只有精品国产| 欧美 亚洲 日韩 国产| 好吊日免费视频| 91精品小视频| 久久综合结合久久狠狠狠97色| 综合网天天| 九色视频一区| 97在线公开视频| 呦女精品网站| 99久久精品国产麻豆婷婷| 久久窝窝国产精品午夜看片| 无码内射中文字幕岛国片| 国产制服丝袜91在线| 岛国精品一区免费视频在线观看| 国产网站免费| 久久鸭综合久久国产| 欧美国产综合视频| 国产人成网线在线播放va| 国产美女在线观看|