摘要: 在單樁靜載荷試驗(yàn)的研究過(guò)程中,通常借助函數(shù)關(guān)系對(duì)Q-s曲線進(jìn)行數(shù)學(xué)分析。本文為得到較高擬合度的函數(shù)關(guān)系參數(shù),采用函數(shù)曲線擬合單樁靜載試驗(yàn)Q-s 曲線,通過(guò)擬合參數(shù)求取Q-s曲線函數(shù)關(guān)系,然后進(jìn)行比選,最終確定一種擬合度最高的函數(shù)關(guān)系。利用函數(shù)關(guān)系,可預(yù)估樁基沉降值,也可利用沉降值反算上部荷載。
Abstract: In the process of single pile static load test, mathematical analysis of Q-s curve is usually done by means of function relation. In order to obtain the function relation parameter of higher fitting degree, the function curve is used to fit the Q-s curve of the static load test of single pile, and the relation of Q-s curve function is obtained by fitting parameters, then the comparison is carried out, and a function relation with the highest fitting degree is finally determined. The settlement of pile foundation can be predicted by using function relation, and the upper load can be calculated.
關(guān)鍵詞: 單樁靜載荷試驗(yàn);樁基檢測(cè);拋物線;Q-s 曲線
Key words: single pile static load test;pile foundation detection;parabola;Q-s curve
中圖分類號(hào):TU473.11 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):1006-4311(2018)20-0196-03
1 概述
諸多巖土工程前輩通過(guò)各種函數(shù)關(guān)系研究單樁靜載荷試驗(yàn)規(guī)律取得了較多的研究成果。劉勝利在2011年用Levenberg-Marquardt算法,通過(guò)Boltzmann曲線非線性擬合單樁靜載荷試驗(yàn)數(shù)據(jù),獲得較好的一致性參數(shù)[1];趙春風(fēng)在1999年利用多種曲線模擬Q-s曲線的辦法,針對(duì)單樁極限承載力的估算方法,選取若干根試樁進(jìn)行了相關(guān)研究[2];蔣建平2010年利用生物領(lǐng)域的Gompertz生長(zhǎng)曲線模型對(duì)單樁Q-s曲線進(jìn)行擬合[3];通過(guò)不懈的研究和積累國(guó)內(nèi)外學(xué)者在單樁靜載荷試驗(yàn)方面取得了豐富的科研成果[4-7],但是單樁的極限承載力是和土層密切相關(guān)的,在各個(gè)地區(qū)具有較為明顯的地域區(qū)別。
本文通過(guò)對(duì)合肥第④層粘土中PHC管樁的具體情況,選取拋物線函數(shù)作為擬合工具,并對(duì)30余根Q-s曲線進(jìn)行擬合分析,得到了較好的擬合度。
2 模型分析
通過(guò)對(duì)現(xiàn)場(chǎng)單樁將載荷試驗(yàn)獲得的Q-s曲線進(jìn)行分析:一般我們認(rèn)為Q-s曲線應(yīng)該是一條通過(guò)坐標(biāo)系原點(diǎn),即當(dāng)荷載值為0時(shí)沉降量也0的一條曲線;其次在荷載值與沉降量穩(wěn)定發(fā)展的過(guò)程中有一個(gè)近似直線的斜線段,即Q-s關(guān)系等比例增長(zhǎng)階段。最后,在荷載值增加量較小的情況下沉降量迅速增加,在曲線形態(tài)上看會(huì)有一個(gè)陡降階段。規(guī)范規(guī)定在基樁未破壞的情況下,單樁靜載荷試驗(yàn)可取沉降量40mm時(shí)的荷載作為單樁極限承載力,故要求選取的擬合函數(shù)曲線在沉降量小于40mm范圍內(nèi)的階段能與Q-s曲線保持較高的一致性。
對(duì)比分析了Boltzmann曲線、指數(shù)函數(shù)、對(duì)數(shù)函數(shù)和三次樣條曲線,首先采用三次樣條曲線對(duì)Q-s曲線擬合需要人為地限定邊界條件,很難外推預(yù)測(cè)發(fā)展趨勢(shì),而且三次樣條的計(jì)算較為復(fù)雜,需要較高的數(shù)學(xué)知識(shí)和專業(yè)軟件[4];其次指數(shù)函數(shù)、對(duì)數(shù)函數(shù)在擬合過(guò)程中擬合度相對(duì)較低(見(jiàn)圖2);而Boltzmann曲線在沉降量40mm之內(nèi)會(huì)出現(xiàn)沉降略有增加而荷載無(wú)限增大的情況,這一點(diǎn)不符合單樁靜載荷試驗(yàn)Q-s曲線的發(fā)展規(guī)律。
對(duì)各種曲線進(jìn)行對(duì)比后,較多函數(shù)都可以部分?jǐn)M合Q-s曲線,但是要么存在不符合Q-s曲線發(fā)展規(guī)律,要么存在擬合度較低又或者較難操作和計(jì)算等問(wèn)題,本文選擇較為常見(jiàn)而簡(jiǎn)單的一元二次函數(shù)即拋物線函數(shù) 作為本次單樁靜載荷試驗(yàn)Q-s曲線擬合函數(shù)。
3 曲線擬合及參數(shù)分析
選取30根處于合肥第④層粘土中的預(yù)應(yīng)力管樁,主要樁徑為500mm和600mm,然后將其基樁檢測(cè)單樁豎向靜載荷試驗(yàn)荷載與沉降數(shù)據(jù)整理為Q-s曲線并用拋物線函數(shù)進(jìn)行擬合。擬合結(jié)果詳見(jiàn)圖3和圖4。
從擬合度來(lái)看,使用拋物線函數(shù)對(duì)Q-s曲線擬合,擬合度參數(shù)R2值均在0.995以上(見(jiàn)表1),故拋物線函數(shù)可以準(zhǔn)確的表達(dá)荷載與沉降的關(guān)系。從參數(shù)規(guī)律方面來(lái)看,在同一樁型的參數(shù)具有較高的一致性。而在不同樁徑的樁型之間,其之間參數(shù)又有所不同,這充分證明了拋物線函數(shù)適合擬合該土層中各種型號(hào)的預(yù)應(yīng)力管樁,區(qū)分度也較為明顯。
4 承載力分析預(yù)測(cè)及驗(yàn)證
根據(jù)以上數(shù)據(jù)進(jìn)行擬合,可以得到每根樁擬合曲線上的單樁豎向靜載荷試驗(yàn)荷載與沉降的拋物線函數(shù)關(guān)系,例如1-28#樁的擬合出的Q-s拋物線函數(shù)關(guān)系為(荷載Q單位kN,沉降s單位為mm條件下):
s=1.195×10-6Q2+1.45×10-4Q
通過(guò)計(jì)算,可以得到沉降量為25mm、30mm和40mm時(shí)對(duì)應(yīng)的單樁荷載值,分別為4514kN、4950kN和5725kN,通過(guò)勘察報(bào)告提供的側(cè)摩阻系數(shù)和端阻系數(shù)計(jì)算得到的單樁豎向極限承載力為4600kN,通過(guò)計(jì)算統(tǒng)計(jì),我們得到了合肥第④層粘土中PHC管樁的沉降與荷載關(guān)系統(tǒng)計(jì)表,見(jiàn)表2。
因考慮PHC500管樁自身強(qiáng)度所對(duì)應(yīng)的極限承載力,取沉降30mm時(shí)所對(duì)應(yīng)的承載力作為單樁的極限承載力,此時(shí)的承載力與沉降40mm時(shí)相比更偏安全。按照這個(gè)原則,通過(guò)表2的統(tǒng)計(jì)可得PHC 500-125-15管樁在合肥第④層粘土中的單樁極限承載力約為5300kN,同時(shí)PHC 600-130-15管樁在合肥第④層粘土中的單樁極限承載力約為6000kN。
因?yàn)樵谶M(jìn)行設(shè)計(jì)時(shí),所需單樁極限承載力為4600kN,所以可以根據(jù)相關(guān)比例系數(shù)(即15米樁長(zhǎng)時(shí)的計(jì)算單樁極限承載力與Q-s曲線擬合推算出的單樁極限承載力比值約為0.87)推算出對(duì)應(yīng)的樁長(zhǎng)可以減少兩米,此時(shí)推算的PHC 500-125-13管樁單樁極限承載力約為4600kN。
通過(guò)以上的分析和預(yù)測(cè),在合肥當(dāng)?shù)氐钠渌?xiàng)目中采用PHC 500-125-13管樁在合肥第④層粘土中進(jìn)行了相關(guān)試驗(yàn)性試樁,獲得了其單樁靜載荷試驗(yàn)數(shù)據(jù),結(jié)果完全符合預(yù)期值,也充分驗(yàn)證了我們整個(gè)推理過(guò)程的可靠性。
5 結(jié)論
①采用拋物線函數(shù)對(duì)合肥第④層粘土中PHC管樁Q-s曲線進(jìn)行擬合具有較高的擬合度,所得參數(shù)一致較好。
②采用本文擬合曲線推算出的合肥第④層粘土中PHC管樁單樁極限承載力與實(shí)際情況較符合。
③通過(guò)推算單樁極限承載力和計(jì)算單樁承載力關(guān)系,可得到其關(guān)系系數(shù),在實(shí)際應(yīng)用中可以減少工程樁長(zhǎng)度,以實(shí)現(xiàn)安全性與經(jīng)濟(jì)性的最優(yōu)化。
參考文獻(xiàn):
[1]劉勝利,趙文光,秦尚林,等.基于 Boltzmann 函數(shù)的樁基極限承載力預(yù)測(cè)[J].土木工程與管理學(xué)報(bào),2011,28(4):30-33.
[2]趙春風(fēng),于明章,吳水根,等.試樁未達(dá)破壞時(shí)單樁極限承載力的估算方法[J].同濟(jì)大學(xué)學(xué)報(bào)(自然科學(xué)版),1999,27(4):474-477.
[3]JIANG Jian-ping,XU Hong-fa,GAO Guang-yun. Load-settlement curves of cast-in-place piles based on Gompertz model[J]. Journal of PLA University of Science and Technology (Natural Science Edition),Vol 11,No5,2010 517-521.
[4]張?zhí)砦?三次樣條曲線法擬合Q-s曲線[J].福建建筑,2013,177(3):88-93.
[5]劉俊龍.雙曲線法預(yù)測(cè)單樁極限承載力的討論[J].巖土工程技術(shù),2001(4):206-217.
[6]周國(guó)林.單樁極限承載力的灰色預(yù)測(cè)[J].巖土力學(xué),1991(1).
[7]Seo H, Basu D, Prezzi M.Load-settlement response of rectangular and circular piles in multilayered soil [J]. Journal of Geotechnical and Geoenvironmental Engineering,2009,135(3):420-430.