關(guān)鍵詞:引水工程;TBM隧洞;收斂監(jiān)測(cè);數(shù)據(jù)分析
中圖分類號(hào):TV223 文獻(xiàn)標(biāo)志碼:A 文章編號(hào):1003-5168(2025)13-0062-04
DOI:10.19968/j.cnki.hnkj.1003-5168.2025.13.012
Analysis and Application of TBM Tunnel Convergence Monitoring in the Subsequent Optimization Project
LYU Zehuan (Guangdong Yuehai YuedongWater Supply Co.,Ltd., Jieyang 522Ooo, China)
Abstract: [Purposes] To analyze the convergence behavior of TBM-driven tunnels during the construction process,ensuring both constuction safety and engineering quality.[Methods] Taking a certain TBM tunnel as an example,this study conducts safety monitoring on the convergence of the TBM tunnel by employing flexible inclinometers and convergence meters,and then performs a comparative analysis of the collcted data.[Findings] It was revealed from the comparative analysis that there was a 1 mm accuracy deviation between diferent monitoring instruments.The flexible inclinometer delivers advanced precision with smart monitoring capabilities,though subject to installation limitations,whereas the convergence meter,while operationally straightforward,exhibits higher susceptibility to environmental interference.[Conclusions] The research outcomes not only provide a solid foundation for ensuring rational adjustments of the TBM's machine posture during tunneling in this project,but also offer operational safeguards for subsequent construction and long-term operation. Furthermore,they serve as a valuable reference for other water diversion projects employing TBM methods,particularly in the selection of convergence monitoring systems, construction safety control,and engineering quality assurance.
Keywords: water diversion project; TBM tunnel; convergence monitoring; data analysis
0 引言
引水工程作為一種重要的水資源調(diào)配手段,在解決水資源短缺和分配不均,促進(jìn)區(qū)域經(jīng)濟(jì)發(fā)展等方面發(fā)揮著關(guān)鍵作用。在引水工程的建設(shè)中,全斷面隧道掘進(jìn)機(jī)(TunnelBoringMachine,簡稱
TBM)以其高效、安全、環(huán)保等諸多優(yōu)勢(shì),在引水工程中得到了越來越廣泛的應(yīng)用。某工程TBM隧洞主要位于花崗巖弱、微風(fēng)化新鮮巖體中,巖質(zhì)堅(jiān)硬,巖體較完整,工程地質(zhì)條件較好,以Ⅱ類及Ⅲ類圍巖為主,花崗巖中存在抗壓強(qiáng)度為 250~380MPa 的特堅(jiān)硬巖脈,局部侵入巖脈的單軸飽和抗壓強(qiáng)度可達(dá) 300MPa[2] ,掘進(jìn)隧洞段長約 3770m ,TBM隧洞段最小曲線半徑為 500m ,縱坡為 0.34% ,為上坡方向掘進(jìn)。該工程TBM隧洞采用 Φ4600mm 雙護(hù)盾TBM掘進(jìn)機(jī)施工,采用全段拼裝通用5片式雙面楔形管片,且在 IV 、V類圍巖段設(shè)置鋼筋混凝土二襯。
1外部因素影響分析
外部環(huán)境因素對(duì)TBM隧洞收斂有著不可忽視的影響,因此在利用柔性測(cè)斜儀和收斂計(jì)進(jìn)行測(cè)量時(shí),應(yīng)對(duì)外部環(huán)境因素進(jìn)行分析。其中地質(zhì)情況、地下水和地震等方面的影響尤為顯著。地質(zhì)情況方面3,洞身主要位于花崗巖弱、微風(fēng)化帶中,巖質(zhì)堅(jiān)硬,其對(duì)TBM掘進(jìn)帶來了較大的難度,強(qiáng)大的掘進(jìn)力導(dǎo)致隧洞周圍巖石應(yīng)力分布發(fā)生變化,進(jìn)而影響隧洞的收斂情況,且其掘進(jìn)產(chǎn)生較大的震動(dòng),也對(duì)隧洞結(jié)構(gòu)的穩(wěn)定性有影響;地下水方面,由于隧洞埋深超 200m ,且穿越較多的斷層破裂帶,山體附近存在水庫,因此地下水豐富,地下水的壓力及侵蝕作用會(huì)對(duì)隧洞收斂造成影響;地震方面,粵東地區(qū)地震活動(dòng)相對(duì)較少,但在工程設(shè)計(jì)和施工中仍需要考慮地震的影響。
2 監(jiān)測(cè)設(shè)計(jì)
2.1 監(jiān)測(cè)目的
由于TBM隧洞埋深超 200m ,其洞身穿越弱風(fēng)化巖層,僅在頭尾少量穿越強(qiáng)風(fēng)化地層,其中弱風(fēng)化花崗巖及石英砂巖巖質(zhì)堅(jiān)硬,對(duì)刀具磨損較大,弱風(fēng)化泥質(zhì)粉砂巖巖質(zhì)較軟,層間裂隙發(fā)育,層間軟弱夾層對(duì)圍巖穩(wěn)定有一定影響4。在穿越斷層破裂帶時(shí)存在塌方、涌水、卡機(jī)等風(fēng)險(xiǎn),施工難度及不確定性較大。
因此,該工程TBM隧洞采用柔性測(cè)斜儀和收斂計(jì)進(jìn)行數(shù)據(jù)分析,以預(yù)測(cè)巖體的變形趨勢(shì)及收斂變形情況,并及時(shí)采取相應(yīng)的措施,確保施工和人員的安全及TBM姿態(tài)的調(diào)整控制。通過與收斂計(jì)測(cè)量結(jié)果進(jìn)行對(duì)比,驗(yàn)證TBM隧洞內(nèi)使用柔性測(cè)斜儀的實(shí)用性和精確性。
2.2 監(jiān)測(cè)原理
設(shè)置在TBM隧洞的柔性測(cè)斜儀采用ADM陣列位移計(jì)(MEMS微機(jī)電系統(tǒng)),其數(shù)據(jù)波動(dòng)最優(yōu)可達(dá)到 0.01mm ,并創(chuàng)新性地采用溫區(qū)補(bǔ)償模型,真正做到 -40~60°C 溫區(qū)補(bǔ)償,保障了測(cè)量精度與穩(wěn)定性。根據(jù)計(jì)算原理,由單節(jié)計(jì)算公式 d=L?sinθi 可得累加每節(jié)位移量,則某時(shí)刻從端點(diǎn)至第 i 節(jié)累加變形見式(1)。

以上式中: d 為三維軸線中 (X,Y,Z) 單節(jié)相對(duì)基準(zhǔn)線的變形值, mm;L 為單節(jié)長度,取 0.5m 或
為單節(jié)對(duì)應(yīng)軸與重力方向的夾角,; Di 為某時(shí)刻從端點(diǎn)至第i節(jié)的累加位移, mm 。
收斂計(jì)通過測(cè)量兩個(gè)基準(zhǔn)點(diǎn)間的相對(duì)位移,并利用數(shù)顯位移計(jì)讀出兩次讀數(shù),并以此計(jì)算出差值,是一種利用機(jī)械傳遞位移進(jìn)行監(jiān)測(cè)的方法[5]。其分辨率為 0.01mm ,測(cè)量精度為 0.06mm 。基線兩點(diǎn)間收斂值 s 的計(jì)算見式(2)。
S=(D0+L0)-(Dn+Ln)
式中: D0 為首次數(shù)顯讀數(shù), mm L0 為首次鋼尺長度, mm;Dn 為第 n 次數(shù)顯讀數(shù), mm;Ln 為第 n 次鋼尺長度, mm 。
2.3 監(jiān)測(cè)方案
本研究選擇地質(zhì)條件為 IV,V 類圍巖、巖芯以碎裂石為主的部位作為監(jiān)測(cè)斷面。在每個(gè)監(jiān)測(cè)斷面布置柔性測(cè)斜儀,以實(shí)現(xiàn)斷面管片收斂情況的自動(dòng)化監(jiān)測(cè)。柔性測(cè)斜儀安裝完成后,隧洞無線網(wǎng)絡(luò)通過終端轉(zhuǎn)換為光纖網(wǎng)絡(luò),再通過光纖網(wǎng)口轉(zhuǎn)換器接入數(shù)據(jù)采集單元,監(jiān)測(cè)數(shù)據(jù)通過內(nèi)置網(wǎng)絡(luò)模塊傳輸至后臺(tái),具體設(shè)置如圖1所示。在同一斷面設(shè)置3處收斂計(jì)作為對(duì)比組,分別測(cè)量S1S2、S2S3、S1S3累計(jì)變化和變化速率,與柔性測(cè)斜儀檢測(cè)結(jié)果進(jìn)行對(duì)比,以此判斷柔性測(cè)斜儀的精度和準(zhǔn)確性,具體設(shè)置如圖2所示。根據(jù)設(shè)計(jì)要求,當(dāng)測(cè)量數(shù)據(jù)累計(jì)變化達(dá)到 ±20mm ,變化速率達(dá)到 ±3mm/d 時(shí)達(dá)到報(bào)警值,此時(shí)應(yīng)采取相應(yīng)的保護(hù)措施并進(jìn)行安全風(fēng)險(xiǎn)評(píng)估。
3數(shù)據(jù)分析
本研究對(duì)TBM隧洞其中一個(gè)測(cè)量斷面進(jìn)行數(shù)據(jù)分析,并以柔性測(cè)斜儀及收斂計(jì)的測(cè)量周期30d為例,具體測(cè)量的累計(jì)變化及變化速率數(shù)據(jù)如圖3和圖4所示。由圖3可知,柔性測(cè)距儀測(cè)得最大累計(jì)變化為 1.25mm ,最大變化速率為 0.05mm/d 由圖4可知,收斂計(jì)測(cè)得最大累計(jì)變化為S1S2的1.08mm ,最大變化速率為S2S3的 -1.42mm/d 。兩者整體的累計(jì)變化及變化速率變化曲線基本穩(wěn)定,通過使用柔性測(cè)斜儀與收斂計(jì)測(cè)量該TBM斷面,其累計(jì)變化值均超過 ±20mm ,變化速率均未超過±3mm/d ,表明該斷面未達(dá)到預(yù)警值。




通過對(duì)比選取斷面的數(shù)據(jù)可知,所采用的柔性測(cè)斜儀與收斂計(jì)精度偏差約為 1mm ,且柔性測(cè)距儀的精度更高,而造成收斂計(jì)誤差較大的主要原因?yàn)槠淙菀资軠囟?、人為等外部因素干擾,而柔性測(cè)斜儀安裝更為牢固,可有效地避免人為因素造成的誤差。因此,在布設(shè)時(shí),不僅應(yīng)選擇在能夠準(zhǔn)確反映TBM隧洞變形情況的位置,也要避開施工設(shè)備、管道等可能對(duì)測(cè)量造成干擾的物體。
4結(jié)語
TBM隧洞段的施工質(zhì)量和安全對(duì)整個(gè)工程的順利進(jìn)行是至關(guān)重要的。通過對(duì)比發(fā)現(xiàn),采用柔性測(cè)斜儀的優(yōu)勢(shì)在于其測(cè)量精度高、更智能化但安裝受限,適用于I、V類圍巖斷面成型較好的隧洞及一些要求測(cè)量精度高且易于安裝的應(yīng)急工程。而采用收斂計(jì)測(cè)量收斂的優(yōu)勢(shì)在于簡單方便,缺點(diǎn)為容易受環(huán)境干擾從而影響測(cè)量精度,適用于大多數(shù)引水隧洞工程。
在穿越斷層破裂帶時(shí),選擇適合的安全監(jiān)測(cè)設(shè)備不僅能夠提前預(yù)警巖體不穩(wěn)定情況,為施工人員采取應(yīng)對(duì)措施提供參考,而且能極大保障工程安全、質(zhì)量及工期,也為后續(xù)施工及運(yùn)行提供準(zhǔn)確的
參考依據(jù)。
參考文獻(xiàn):
[1]章慧,趙健,楊凡.TBM掘進(jìn)擠壓變形洞段加固支護(hù)技術(shù)探討[J].土工基礎(chǔ),2023,37(2):206-208,212.
[2]方騰衛(wèi),馮日榮,張建偉,等.TBM引水隧洞組合結(jié)構(gòu)承載下管片錯(cuò)臺(tái)和張開度特性研究[J].廣東水利水電,2023(11):1-8.
[3]李宗林,譚忠盛,周振梁,等.基于TBM振動(dòng)監(jiān)測(cè)的圍巖參數(shù)感知技術(shù)研究[J].鐵道科學(xué)與工程學(xué)報(bào),2025,22(4):1853-1869.
[4]劉啟波,方騰衛(wèi),張建偉,等.不同隧洞圍巖壓力計(jì)算方法對(duì)管片力學(xué)特性影響研究[J].水利規(guī)劃與設(shè)計(jì),2023(9):79-85,99.
[5]王傳樂,李二兵,譚躍虎,等.新型接觸式隧洞收斂監(jiān)測(cè)系統(tǒng)及其應(yīng)用[J].南京工業(yè)大學(xué)學(xué)報(bào)(自然科學(xué)版),2018,40(6):96-103.
[6]張爭,劉永智,范新宇,等.變形隧洞圍巖收斂監(jiān)測(cè)及回歸分析[J].西北水電,2020(5):61-63.
[7]李世民,李世陽,苑廣會(huì),等.隧洞圍巖收斂變形監(jiān)測(cè)數(shù)據(jù)分析[J].云南水力發(fā)電,2012,28(6):1-2,8.
(欄目編輯:孫艷梅)